Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,927 approved · 117 refused · 266 withdrawn. Received dates in our records: 2 Apr 2003 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Flett Shed Setter Voe Shetland ZE2 9PX
Received 26 Apr 20217 & 9 Charlotte Street Lerwick Shetland ZE1 0JL
Received 27 Apr 2021Plot 2 Aisterlea Cunningsburgh Shetland ZE2 9HB
Received 27 Apr 2021Scalloway Public Hall Berry Road Scalloway Shetland ZE1 0UJ
Received 27 Apr 202149 St Olaf Street Lerwick Shetland ZE1 0EN
Received 28 Apr 2021Plot At Ellister Bigton Shetland ZE2 9JF
Received 28 Apr 2021Central Mainland Shetland
Received 28 Apr 2021Ses El & Mec Services Oversund Road Lerwick Shetland ZE1 0SD
Received 29 Apr 2021Caldback, Unst, Shetland
Received 29 Apr 2021West Of Burwick Scalloway
Received 28 Apr 2021Garage 1 Holmsgarth Road Lerwick Shetland
Received 28 Apr 202172 North Road Lerwick Shetland ZE1 0NT
Received 29 Apr 2021Da Wirlie Wirliegert Aith Shetland ZE2 9NW
Received 3 May 202172A Commercial Street Lerwick Shetland ZE1 0DL
Received 3 May 2021Hermaness National Nature Reserve Unst Shetland
Received 30 Apr 2021Marine Park Ltd. Marine Park Vidlin Shetland ZE2 9QB
Received 4 May 2021The Haa Tangwick Eshaness Shetland ZE2 9RS
Received 4 May 2021Cott Road Lower (east) Weisdale
Received 5 May 2021Near Cullivoe Pier Cullivoe Yell Shetland ZE2 9DD
Received 6 May 2021Near Cullivoe Pier Cullivoe Yell Shetland ZE2 9DD
Received 6 May 2021Near Cullivoe Pier Cullivoe Yell Shetland ZE2 9DD
Received 6 May 2021Phase 2 - Plot Wista Lerwick Shetland
Received 3 May 2021Fitful Lunabister Dunrossness Shetland ZE2 9JH
Received 7 May 2021Scalloway Public Hall Berry Road Scalloway Shetland ZE1 0UJ
Received 7 May 2021Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage