Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,005Searchable applications
134Recorded as pending
99%Approval rate · 7,966 approved or refused records
116Refused applications

7,850 approved · 116 refused · 263 withdrawn. Received dates in our records: 2 Apr 2003 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2020/088/AMSC

    Application for Approval of Matters Specified in Condition 2 parts 1,2,3 and 4 of permission 2018/216/PPP for new dwellinghouse with access track, parking / turning area and air-source heat pump.

    Plot Houss Bridge End BURRA Shetland

    Received 13 May 2020
  2. Decided2018/096/DCON13

    Application to discharge Condition 19 of Planning Application 2018/096/PPF

    Unclassified Road To Upper Kergord Runs Approximately 1.5km, From A Junction With The B9075, Approximately 70M East Of B9075 Of Weisdale Crossing.

    Received 14 May 2020
  3. Decided2020/089/PPF

    Reduce the height of a section of existing dry-stone wall to be max 900mm high from road surface to provide the required visibility splay to the south of the existing junction with the main road.

    Bankfield Lower Sound Lerwick Shetland ZE1 0RN

    Received 18 May 2020
  4. Decided2018/153/DCON1

    Application to discharge part 1 of Condition 20 of Planning Application 2018/153/VCON

    Beaw Field Burravoe Yell Shetland ZE2 9BA

    Received 18 May 2020
  5. Decided2020/090/PPF

    Installation of Above Ground Section of Water Main to Cross Watercourse

    Burn of Trondavoe, West of B9076 Road at Trondavoe, North-East of Brae, Shetland Isles

    Received 18 May 2020
  6. Decided2019/079/DCON

    Discharge of Condition 11 Ecological Clerk of Works (ECoW) - 2019/079/PPF

    B9075 Sandwater Road, Mainland, Shetland

    Received 27 May 2020
  7. Decided2019/079/DCON1

    Discharge of Condition 13 Water Quality Monitoring Plan (WQMP) 2019/079/PPF

    B9075 Sandwater Road, Mainland, Shetland

    Received 28 May 2020
  8. Decided2019/079/DCON2

    Discharge of Condition 16 Archaeological Clerk of Works (ACoW) - 2019/079/PPF

    B9075 Sandwater Road, Mainland, Shetland

    Received 28 May 2020
  9. Decided2020/091/PPF

    Alter existing layout and erect proposed extensions to the south and west elevations, create new access track and the demolition of an existing outbuilding and the construction of a new shed / workshop space

    Beachvue Bixter Shetland ZE2 9NA

    Received 1 Jun 2020
  10. Decided2019/079/DCON3

    Discharge of Condition 15, Archaeological Written Scheme of Investigation of Planning Permission 2019/079/PPF

    B9075 Sandwater Road Mainland Shetland

    Received 2 Jun 2020
  11. Decided2019/079/DCON4

    Discharge of Condition 10 (Peat Management Plan) of Planning Permission 2019/079/PPF

    B9075 Sandwater Road Mainland Shetland

    Received 2 Jun 2020
  12. Decided2018/335/DCON19

    Application to discharge Condition 36 (Peat Management Plan) of Planning Application 2018/335/ECUCON

    Central Mainland Shetland

    Received 2 Jun 2020
  13. Decided2020/092/TCA

    Request to remove two trees

    Leagarth 3 Clairmont Place Lerwick Shetland

    Received 3 Jun 2020
  14. Decided2020/093/PPF

    Erect dwelling house with air source heat pump

    Plot 2 Ocraquoy Fladdabister Shetland

    Received 5 Jun 2020
  15. Decided2020/094/PPF

    Site a static caravan for a temporary period of 5 years, development of existing access and further construction of a road, parking and turning area.

    Cunningsburgh Shetland ZE2 9HF

    Received 8 Jun 2020
  16. Decided2020/096/PPF

    Demolish existing old house (used as agricultural store) and shed and erect new steel frames agricultural shed

    Sanshoull Croft, Isbister, Whalsay ZE2 9AJ

    Received 9 Jun 2020
  17. Decided2018/186/DCON

    Discharge of Condition 10 - Aviation Lighting of Planning Application 2018/186/PPF Mossy Hill Wind Farm

    The Grid Reference Is The Approximate Centre Of The Site For Mossy Hill Wind Farm. The Centre Of The Site Is Located Approximately 2.4km From Outskirts Of Lerwick And Approximately 4.2km From Lerwick Harbour.

    Received 6 Jun 2020
  18. Decided2020/030/DCON

    Discharge of Condition 6 - Biosecurity Management Plan - 2020/030/PPF

    Land Adjacent To Roadside, Fair Isle, Shetland.

    Received 9 Jun 2020
  19. Decided2020/097/PPF

    Proposed development of 4 single storey houses with ASHP, associated access, driveway and drainage arrangements

    Development Plot Walls Shetland

    Received 9 Jun 2020
  20. Decided2020/098/PPF

    Erect dwelling house with air source heat pump

    House Plot Swinister Sandwick Shetland

    Received 10 Jun 2020
  21. Decided2020/099/PPF

    Erect building to house home gym equipment, hot tub and sauna and change use of land from rough grazing to garden grounds

    Toralea Bridge End Burra Shetland ZE2 9LD

    Received 10 Jun 2020
  22. Decided2018/335/DCON20

    Application to discharge Condition 28 (Road Cleaning/Sweeping) of Planning Application 2018/335/ECUCON

    Central Mainland Shetland

    Received 12 Jun 2020
  23. Decided2019/079/DCON5

    Discharge of Condition 17 (Temporary Parking Provision) of Planning Permission 2019/079/PPF

    B9075 Sandwater Road Mainland Shetland

    Received 15 Jun 2020
  24. Decided2020/020/MPN

    Application for Prior Notification under Class 21C of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended): To replace existing top nets and supports with top nets and supports of a different size and design

    Stead Of Aithness Swarbacks Minn Shetland

    Received 15 Jun 2020

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage