Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,744 approved · 116 refused · 262 withdrawn. Received dates in our records: 14 Apr 2004 to 12 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Hest Skellister South Nesting Shetland ZE2 9PS
Received 19 Jun 2018Lower Quoys Bigton Shetland ZE2 9JA
Received 20 Jun 2018Pavement At B9071 Junction Aith Shetland Isles ZE2 9NW
Received 15 Jun 2018New House Upper Lingarth Dunrossness ZE2 9JQ
Received 20 Jun 20184-5 South Gremista Industrial Estate Lerwick Shetland ZE1 0PX
Received 18 Jun 2018Grindischool Bressay Shetland ZE2 9ER
Received 19 Jun 2018Adjacent Muckle Bousta East Collister Sandness Shetland ZE2 9PL
Received 21 Jun 2018175 Commercial Street Lerwick Shetland ZE1 0EX
Received 18 Jun 2018Scalloway Pier Scalloway Shetland
Received 12 Jun 2018Noss Visitors Centre Noss Bothy Bressay Shetland ZE2 9ES
Received 21 Jun 2018Haa Of Sand Sand Garderhouse Shetland ZE2 9NQ
Received 22 Jun 2018Cro Bigton Shetland ZE2 9JF
Received 20 Jun 2018Verge At Junction Of Hulsidale & B9074 Hamnavoe Shetland ZE2 9LF
Received 19 Jun 201831 Midlea Firth Mossbank Shetland ZE2 9TL
Received 25 Jun 2018Adjacent Four Winds Aithsetter Cunningsburgh Shetland ZE2 9HG
Received 26 Jun 2018The grid reference is the approximate centre of the site for Mossy Hill Wind Farm. The centre of the Site is located approximately 2.4km from outskirts of Lerwick and approximately 4.2km from Lerwick Harbour.
Received 26 Jun 2018Innbanks Sullom Shetland ZE2 9RE
Received 27 Jun 2018Ayres Of Selivoe Sellivoe Bridge Of Walls Shetland ZE2 9NR
Received 28 Jun 2018Urafirth Hillswick Shetland ZE2 9RH
Received 27 Jun 2018Bethesda Cunningsburgh Shetland ZE2 9HB
Received 29 Jun 2018Site Adjacent Leagarth Scord Scalloway Shetland
Received 3 Jul 2018Harbour Court Harbour Street Lerwick Shetland ZE1 0LR
Received 2 Jul 2018Croft House Kurkigarth Weisdale Shetland ZE2 9LN
Received 29 Jun 2018Unit 1 Blacksness Pier Blacksness Scalloway Shetland ZE1 0TQ
Received 2 Jul 2018Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage