Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,471Searchable applications
136Recorded as pending
98%Approval rate · 8,250 approved or refused records
133Refused applications

8,117 approved · 133 refused · 286 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2025/184/SCR

    The Town & Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2017 - Screening Request for Installation of Two Wind Turbines at Hill of Wethersta.

    Hill Of Wethersta Brae

    Received 4 Jul 2025
  2. Decided2025/185/PPF

    To demolish old ruin and construct new 1 1/2 storey dwelling house with ASHP, post and wire boundary fence and associated landscaping and drainage works

    Plot Ominsgarth Sandsound Bixter Shetland

    Received 8 Jul 2025
  3. Decided2025/186/PPF

    New domestic garage / storage building and proposed land change of use.

    Vatnabrekk Easter Quarff Quarff Shetland ZE2 9EY

    Received 10 Jul 2025
  4. Decided2025/187/PPF

    Erection of substation building comprising x1 switch room, x2 reactors, palisade fencing, associated storage, parking and access. Including a change of use from agricultural to industrial.

    Land To The North Of The A968, Mid Yell, ZE2 9BJ

    Received 10 Jul 2025
  5. Decided2025/189/PPF

    Reposition of septic tank in respect of Approved Planning Application 2022/017/PPF

    Land South Of Gronnack South Whiteness Whiteness Shetland

    Received 11 Jul 2025
  6. Decided2025/191/LBC

    Replacement of existing roof including slates, installation of 3 no. rooflights and replacement rainwater goods (Retrospective)

    1 Aitkens Place Lerwick Shetland ZE1 0JB

    Received 16 Jul 2025
  7. Decided2025/193/PPF

    Erect 2 x stable buildings, hard standing, new access and fencing. Change of use from agricultural to agricultural and equestrian. For private use only, no commercial activities relating to equestrian. All aspects the same as approved application 2024/133/PPF apart from the change in design to erect 2 stable buildings.

    Wild Airs 12 Veensgarth Gott Tingwall Shetland ZE2 9SB

    Received 17 Jul 2025
  8. Decided2024/130/DCON1

    Application for consent, agreement or approval required by planning condition: 4 (Biodiversity) of planning application 2024/130/PPF

    North Compound Off A970

    Received 17 Jul 2025
  9. Decided2025/012/WL

    To build two breakwaters with fenders and walkway to berth and secure sail-assisted fishing vessel

    Noost Lunnister Sullom

    Received 22 Jul 2025
  10. Decided2024/144/DCON4

    Application for consent, agreement or approval required by planning Condition: 17 - Drainage of planning application 2024/144/PPF.

    The B9082 Cullivoe Road Between Gutcher And Stonganess In Cullivoe.

    Received 22 Jul 2025
  11. Unknown2025/195/PN

    Prior Notification to erect agricultural shed 18 x 12.

    Croft Of Garden, Sandness, Shetland, ZE2 9PL

    Received 22 Jul 2025
  12. Decided2025/011/WL

    Remedial works adding split-pipe cable protection to approximately 20m of the existing cable below MHWS & MLWS

    Daal Shore End Whalsay

    Received 22 Jul 2025
  13. Decided2025/013/WL

    Remedial works adding split-pipe cable protection to approximately 30m of the existing cable below MHWS & MLWS

    Symbister Ness Shore End Whalsay

    Received 22 Jul 2025
  14. Decided2025/014/WL

    Remedial works adding split-pipe cable protection to approximately 20m of the existing cable below MHWS

    Kirkabister Shore End Yell

    Received 22 Jul 2025
  15. Decided2025/015/WL

    Remedial works adding split-pipe cable protection to approximately 30m of the existing cable below MHWS

    Kirk Knowe Shore End Fetlar

    Received 22 Jul 2025
  16. Decided2024/130/DCON2

    Application for consent, agreement or approval required by planning condition: 5 (seating and bin storage) of Planning Application 2024/130/PPF

    North Compound Off A970

    Received 28 Jul 2025
  17. Decided2024/130/NMV

    Non-Material Variation to vary planning permission 2024/130/PPF to change approved type of bituminous surface.

    North Compound Off A970

    Received 28 Jul 2025
  18. Decided2022/069/DCON1

    Application for consent, agreement or approval required by planning conditions:- 6 (roof colour and material finish, 7 (septic tank capacity) & 9 (top soil, spoil, waste disposal) of Planning Application 2022/069/PPF

    Former Games Court South Of Nordabrake Saxa Vord Unst

    Received 28 Jul 2025
  19. Decided2025/016/WL

    To undertake span remediation works, via spot rock placement, on the PL1762 gas pipeline

    Yell Sound Shetland

    Received 30 Jul 2025
  20. Decided2025/017/WL

    To undertake span remediation works, via spot rock placement, on the PL10 Ninian oil pipeline

    Firth Ness Mossbank Shetland

    Received 30 Jul 2025
  21. Decided2025/196/SSO

    Screening and Scoping for Quarry deepening and Restoration by infill

    Scatsta Quarry Scatsta

    Received 31 Jul 2025
  22. Decided2025/197/PPF

    Partial replacement cladding to various elevations requiring remedial repairs: recladding and window replacement are proposed. The external blockwork needs to be removed and replaced with a new cladding system in localised areas.

    Gilbert Bain Hospital South Road Lerwick Shetland ZE1 0TB

    Received 31 Jul 2025
  23. Decided2025/202/PPP

    Erection of a single storey dwellinghouse; creation of 2 car parking spaces. (Planning Permission in Principle)

    Site At Meagill, Maywick, Bigton, Shetland.

    Received 4 Aug 2025
  24. Decided2025/203/PPF

    Erection of a dormer extension and decking.

    10 Upper Baila Lerwick Shetland ZE1 0SF

    Received 4 Aug 2025

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage