Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,107 approved · 133 refused · 286 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Kurkigarth Weisdale Shetland ZE2 9LN
Received 1 Apr 2025Shetland Islands Council Old Anderson High School Twageos Road Lerwick Shetland
Received 1 Apr 2025Polycrub HQ Ollaberry Shetland ZE2 9RU
Received 1 Apr 2025Harpslie Dunrossness Shetland ZE2 9JB
Received 2 Apr 2025Girlsta Shetland
Received 2 Apr 2025Melby Cottage Melby Sandness Shetland ZE2 9PL
Received 4 Apr 2025Watsness Walls Shetland ZE2 9PE
Received 4 Apr 2025Former A968 Easter Burn Yell
Received 7 Apr 2025The Westings Wormadale Tingwall Shetland ZE2 9LJ
Received 7 Apr 2025Lodge & Bird Observatory Fair Isle Shetland ZE2 9JU
Received 11 Apr 2025Garth Skellister South Nesting Shetland ZE2 9PS
Received 14 Apr 2025Seafield House Seafield Lerwick Shetland ZE1 0RN
Received 14 Apr 2025Proposed footpath to be located adjacent to the public road between the Laxfirth Junction and the Breiwick / Califf Junction.
Received 15 Apr 2025Adjacent To Windhouse Lodge Mid Yell Yell Shetland ZE2 9BJ
Received 15 Apr 2025The Booth Ollaberry Shetland ZE2 9RX
Received 16 Apr 2025Herra Yell Shetland ZE2 9BL
Received 16 Apr 2025Park Hall Bixter Shetland
Received 16 Apr 2025Tananger Gott Tingwall Shetland ZE2 9SE
Received 7 Apr 2025The Old Church Hall Mid Yell Yell Shetland ZE2 9BT
Received 18 Apr 2025Vega Clumliewick Sandwick Shetland ZE2 9HH
Received 18 Apr 2025Sunnybank Walls Shetland ZE2 9PB
Received 18 Apr 2025Mackenzies Farm Shop & Cafe Cunningsburgh Shetland ZE2 9HA
Received 18 Apr 2025Gutcher Quarry Sellafirth Yell Shetland
Received 22 Apr 2025Quilse North, Gruting Voe
Received 24 Apr 2025Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage