Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,416Searchable applications
136Recorded as pending
98%Approval rate · 8,219 approved or refused records
133Refused applications

8,086 approved · 133 refused · 280 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2024/078/DCON3

    Application for consent, agreement or approval required by planning condition 15 (Removal of materials from site)

    Land To The South Of The Existing Eela Water Treatment Works, Shetland

    Received 9 Sept 2024
  2. Decided2024/230/PPF

    To erect an agricultural shed (Retrospective Application).

    Norby Sandness Shetland ZE2 9PL

    Received 10 Sept 2024
  3. Decided2024/231/LBC

    To remove existing porch extension and erect new extension to existing dwellinghouse (Retrospective Application).

    Watsness Walls Shetland ZE2 9PE

    Received 11 Sept 2024
  4. Decided2024/232/PPF

    To demolish porch and erect new front porch to the existing dwellinghouse.

    33 Gressy Loan Lerwick Shetland ZE1 0YB

    Received 11 Sept 2024
  5. Decided2024/233/S37SIM

    Section 37 consent for 15 Spans of 11kV overhead line supported by wooden poles.

    Bridge Of Walls Shetland ZE2 9NR

    Received 12 Sept 2024
  6. Decided2024/234/PPF

    To demolish existing rear porch extensions on east elevation and erect new rear extension; reinstate existing front porches on west elevation like-for-like.

    Brevik Cottages Burgh Road Lerwick Shetland

    Received 12 Sept 2024
  7. Decided2024/235/PPF

    Proposed development of industrial laydown area to create open storage area and site 20ft container for storage; create new access.

    Gremista Lerwick Shetland ZE1 0PX

    Received 12 Sept 2024
  8. Decided2024/236/PPF

    To erect an 8x4m polycrub and erect a 3x3m polycrub.

    Houlland Sandwick Shetland ZE2 9HW

    Received 13 Sept 2024
  9. Decided2022/229/DCON1

    Application for consent, agreement or approval required by planning Conditions 4 (Materials) and 5 (Waste disposal)

    Bigton Public Hall Bigton Shetland ZE2 9JA

    Received 16 Sept 2024
  10. Unknown2024/237/PN

    To erect an agricultural shed.

    Sparrowayre Walls Shetland ZE2 9PB

    Received 16 Sept 2024
  11. Decided2024/238/PPF

    To erect new single storey dwellinghouse; install air source heat pump; create new access track, turning and parking area; install surface water attenuation device.

    Plot 1 Aisterlea Cunningsburgh Shetland

    Received 17 Sept 2024
  12. Pending Consideration2022/267/DCON1

    Application for consent, agreement or approval required by planning condition 4 (road survey and repair agreement)

    Grind Sandwick Shetland ZE2 9HY

    Received 16 Sept 2024
  13. Decided2022/267/DCON2

    Application for consent, agreement or approval required by planning condition 11 (French Drain details)

    Grind Sandwick Shetland ZE2 9HY

    Received 16 Sept 2024
  14. Decided2024/240/PPP

    To erect 2 no. dwellinghouses; create new access track, turning and car parking; installland infiltration bed and surface water soakaway (Planning Permission in Principle).

    Duncansclett Burra Shetland

    Received 17 Sept 2024
  15. Unknown2024/025/PAM

    Application for Prior Notification under Class 21C of the Town & Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended): To replace existing hamster wheel top nets with a pole mounted system of 100mm mesh.

    Vee Taing, Uyeasound, Unst

    Received 17 Sept 2024
  16. Decided2024/241/NMV

    Minor changes to the construction as defined within the consented planning drawings as a consequence of detail design, the ground conditions encountered and the presence of the now completed adjacent Development Platform.

    Gremista Grid Supply Point Port Business Park Gremista Lerwick ZE1 0TW

    Received 17 Sept 2024
  17. Unknown2024/242/HRA

    To use replacement rock on South Haven beach to protect the road to North Haven harbour under Class 31 of The Town and Country Planning (General Permitted Development) (Scotland) Order 1992.

    South Haven Beach Fair Isle Shetland ZE2 9JU

    Received 17 Sept 2024
  18. Unknown2024/024/PAM

    Application for prior approval under Class 21C of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended): To change top net system from 'hamster wheels' to pole-supported top nets

    Belmont, Uyeasound, Unst, Shetland

    Received 18 Sept 2024
  19. Decided2024/244/PPF

    Install an electric vehicle fleet charge point to serve two spaces, charge point supplied via the distribution board in the building through a duct buried externally (Retrospective Application).

    Overtonlea Rural Care Home Levenwick Shetland ZE2 9HX

    Received 19 Sept 2024
  20. Decided2024/245/PPF

    To install guide wires and anchors for flare

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    Received 19 Sept 2024
  21. Pending Consideration2022/267/DCON3

    Application for consent, agreement or approval required by planning condition 5 (Construction Method Statement).

    Grind Sandwick Shetland ZE2 9HY

    Received 20 Sept 2024
  22. Decided2024/246/PPP

    To erect single storey dwellinghouse; create new access, parking and turning area; install new soakaway (Planning Permission in Principle)

    Plot Exnaboe Virkie Shetland

    Received 23 Sept 2024
  23. Decided2024/247/PPF

    To erect 2 no. glamping pods; refurbish existing access path and create car parking; install surface water soakaway

    The Westings Inn Wormadale Whiteness Shetland ZE2 9LJ

    Received 23 Sept 2024
  24. Decided2024/248/PPF

    To site 4 No. Glamping pods; create new access road, parking and turning; install surface water soakaway and land infiltration system.

    West Of Grutquoy Walls Shetland ZE2 9PD

    Received 24 Sept 2024

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage