Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,647 approved · 115 refused · 260 withdrawn. Received dates in our records: 5 Aug 2004 to 12 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
West Hall Lower Sound Lerwick Shetland ZE1 0RN
Received 29 Apr 2016West Hall Lower Sound Lerwick Shetland ZE1 0RN
Received 29 Apr 2016Pobisgeo Muckle Roe Shetland ZE2 9QW
Received 29 Apr 2016Bune Melby Sandness Shetland ZE2 9PL
Received 29 Apr 2016Adjacent To Anderbrae Haroldswick Unst Shetland ZE2 9EF
Received 27 Apr 2016Aith Shop Aith Shetland ZE2 9NB
Received 27 Apr 2016Brough Hamnavoe Burra Shetland ZE2 9LB
Received 2 May 2016Olas Voe, Gruting
Received 2 May 2016Adjacent To Gruting & District Community Hall Gruting Bridge Of Walls Shetland ZE2 9NR
Received 2 May 2016Bridge End Burra Shetland ZE2 9LE
Received 2 May 20163 Glenfarquhar Lerwick Shetland ZE1 0UF
Received 4 May 20166 Commercial Road Lerwick Shetland ZE1 0HX
Received 3 May 201617 Clach Na Strom Whiteness Shetland ZE2 9LG
Received 3 May 2016Vestinore Cunningsburgh Shetland ZE2 9HF
Received 2 May 2016Westerscord Voe Shetland ZE2 9PT
Received 2 May 2016Esplanade Lerwick Shetland ZE1 0AB
Received 5 May 20164 Burgh Road Lerwick Shetland ZE1 0LB
Received 6 May 2016Peerie Tigh Lower Hillside Gulberwick Shetland ZE2 9FG
Received 5 May 201623 Murrayston Lerwick Shetland ZE1 0RE
Received 9 May 2016Adjacent To Anderbrae Baltasound Unst Shetland ZE2 9DT
Received 13 May 2016Burwick Scalloway
Received 12 May 2016Southerhouse Hoswick Sandwick Shetland ZE2 9HL
Received 9 May 2016Wirliegarth Gossabrough Yell Shetland ZE2 9AU
Received 9 May 2016Kernow Casho Punds Easter Quarff Quarff Shetland ZE2 9EY
Received 9 May 2016Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage