Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
9,399Searchable applications
128Recorded as pending
98%Approval rate · 7,589 approved or refused records
115Refused applications

7,474 approved · 115 refused · 253 withdrawn. Received dates in our records: 17 Feb 2005 to 7 Oct 2026. Most recent record check: 12 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2015/010/PPF

    The removal of 2 no. existing omni antennas and the installation of 3 no. new antennas

    Collafirth Hill Collafirth Shetland ZE2 9RX

    Received 7 Jan 2015
  2. Decided2015/011/PPF

    To erect 2 dwellinghouses

    South Of Daalamist Gott Tingwall Shetland ZE2 9SF

    Received 7 Jan 2015
  3. Decided2015/012/PPF

    Change of use of Class 1 retail shop to Class 2 Veterinary Clinic; to alter commercial frontage

    55 Commercial Road Lerwick Shetland ZE1 0NL

    Received 7 Jan 2015
  4. Pending Consideration2015/013/PPF

    To construct a new single storey vehicle storage building

    Sumburgh Airport Scatness Virkie Shetland ZE3 9JP

    Received 8 Jan 2015
  5. Decided2015/014/PPF

    To construct two single storey extensions to existing dwellinghouse

    Breknamires Huxter Sandness Shetland ZE2 9PL

    Received 8 Jan 2015
  6. Decided2015/015/PPF

    To erect 4 residential units

    Adjacent To Tumblewick Scatness Virkie Shetland ZE3 9JW

    Received 9 Jan 2015
  7. Decided2015/016/PPP

    Erect dwellinghouse (Planning Permission in Principle)

    Mill Pond East Hogaland Bridge End Burra Shetland ZE2 9LE

    Received 12 Jan 2015
  8. Decided2015/017/PNT

    To install openreach street telecoms cabinet

    South Of Brough Hamnavoe Burra Shetland ZE2 9LB

    Received 13 Jan 2015
  9. Decided2015/018/PNT

    To install openreach street telecoms cabinet

    South Of Brough Hamnavoe Burra Shetland ZE2 9LB

    Received 14 Jan 2015
  10. Decided2015/019/PPF

    To erect a single storey/split level extension to dwellinghouse

    Aithvale Nesbister Whiteness Shetland ZE2 9LJ

    Received 14 Jan 2015
  11. Decided2015/020/PPF

    To erect wind turbine and sub station

    Hillhead Ollaberry Shetland ZE2 9RT

    Received 15 Jan 2015
  12. Decided2015/021/PPF

    To erect one and a half storey dwellinghouse with attached domestic garage and air source heat pump; associated access and drainage infrastructure

    South Of Virdalea Trondra Shetland ZE1 0XL

    Received 16 Jan 2015
  13. Unknown2015/022/APN

    To erect an agricultural building

    Heatherbrae Baltasound Unst Shetland ZE2 9DX

    Received 16 Jan 2015
  14. Decided2015/023/FORMB

    Tidal array 11,000 volt overhead line

    Cullivoe Yell Shetland

    Received 19 Jan 2015
  15. Decided2015/024/PPF

    To construct water mains tie-in to facilitate site compound

    Callbackness Mossbank Shetland ZE2 9TU

    Received 21 Jan 2015
  16. Decided2015/025/PPF

    To erect dwellinghouse; install septic tank and create new access

    Adjacent To Innadaeks Skellister South Nesting Shetland ZE2 9PP

    Received 21 Jan 2015
  17. Decided2015/026/PPF

    To erect shed (Retrospective Application)

    3 Pundsta Place Cunningsburgh Shetland ZE2 9HQ

    Received 22 Jan 2015
  18. Decided2015/027/PPF

    To continue gas bottling and storage plant area and associated works

    Quarry Red Pit Northmavine ZE2 9TZ

    Received 22 Jan 2015
  19. Decided2015/028/APN

    To erect agricultural shed

    Burn Muckle Roe Shetland ZE2 9QW

    Received 23 Jan 2015
  20. Decided2015/029/PPF

    To erect 2no. chalets

    Adjacent To Hubrake Whiteness Shetland ZE2 9GJ

    Received 23 Jan 2015
  21. Decided2015/030/PPF

    To erect dwellinghouse and create new access

    Adjacent To Lynngarth Stove Sandwick Shetland ZE2 9HH

    Received 26 Jan 2015
  22. Decided2015/031/PPF

    Change of use from agricultural land to outdoor riding arena; install floodlights, stables, storage shed and site 20ft container for storage (Retrospective Application)

    Houlls Bridge End Burra Shetland ZE2 9LE

    Received 26 Jan 2015
  23. Decided2015/032/PPF

    Install 6kw wind turbine on a 15m high tower and excavation of associated cable trench

    Murrister Bridge Of Walls Shetland ZE2 9NP

    Received 28 Jan 2015
  24. Decided2015/033/PPF

    To demolish existing garage and extend existing dwellinghouse

    Solglint Gonfirth Voe Shetland ZE2 9PX

    Received 29 Jan 2015

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage