Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,416 approved · 115 refused · 251 withdrawn. Received dates in our records: 17 Feb 2005 to 7 Oct 2026. Most recent record check: 12 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
66 Breiwick Road Lerwick Shetland ZE1 0DB
Received 22 Sept 2014Binna Ness (Pund) South Whiteness
Received 19 Sept 2014EMN Plant Ltd Graven Mossbank Shetland ZE2 9UP
Received 26 Sept 2014Moorfield Hotel Brae Shetland ZE2 9SW
Received 2 Oct 2014SE Of Glendale (Lea Of Trondra) Clift Sound
Received 3 Oct 2014Dale Cottage Dunrossness Shetland ZE2 JG
Received 6 Oct 2014Sumburgh Airport Sumburgh Virkie Shetland ZE3 9JP
Received 7 Oct 2014Solbjorg West Isle Out Skerries Shetland ZE2 9AS
Received 8 Oct 2014Cope Ltd Port Business Park Lerwick Shetland ZE1 0TW
Received 9 Oct 2014Cope Ltd Port Business Park Lerwick Shetland ZE1 0TW
Received 9 Oct 2014Steamline Warehouse Lower Blackhill Gremista Lerwick Shetland ZE1 0DG
Received 9 Oct 2014Scalloway Boating Club Port Arthur Scalloway Shetland ZE1 0UN
Received 10 Oct 2014Hillside Lodge Hillside Road Sandwick Shetland ZE2 9HW
Received 9 Oct 2014Havana Hill Clumliewick Sandwick Shetland ZE2 9HH
Received 10 Oct 2014Olnafirth Primary School Isles Road Voe Shetland ZE2 9PT
Received 13 Oct 2014Clingera Baltasound Unst Shetland ZE2 9DT
Received 14 Oct 2014Varis House Church Road Lerwick Shetland ZE1 0BW
Received 16 Oct 2014Varis House Church Road Lerwick Shetland ZE1 0BW
Received 17 Oct 2014Drumquin Guest House Brae Shetland ZE2 9QJ
Received 17 Oct 2014North Lochside Lerwick Shetland
Received 18 Oct 20147 Burgadale Brae Shetland ZE2 9SR
Received 20 Oct 2014Former Uyeasound School Uyeasound Unst Shetland ZE2 9DL
Received 21 Oct 2014Outside Sandwick Telephone Exchange Levenwick Road Sandwick Shetland ZE2 9HN
Received 20 Oct 2014Opp Roogistaens C210 From Sandwick To Crossroads To Hoswick Burn Sandwick Shetland ZE2 9HH
Received 20 Oct 2014Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage