Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,400 approved · 115 refused · 251 withdrawn. Received dates in our records: 17 Feb 2005 to 7 Oct 2026. Most recent record check: 12 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
25 St Magnus Street Lerwick Shetland ZE1 0JT
Received 24 Jul 2014Sundibanks East Voe Scalloway Shetland ZE1 0US
Received 25 Jul 2014Viking Bus Station Commercial Road Lerwick Shetland ZE1 0NX
Received 25 Jul 2014Braewick Aith Bixter Shetland ZE2 9ND
Received 25 Jul 2014Orgill Levaneap Vidlin Shetland ZE2 9QB
Received 28 Jul 2014Ness Of Gardie Mid Yell Yell Shetland ZE2 9BN
Received 30 Jul 2014Stead Of Aithness, Swarbacks Minn
Received 29 Jul 2014Vatnahoull South Setter Tingwall Shetland ZE1 0UQ
Received 31 Jul 2014Tulac Sellafirth Yell Shetland ZE2 9DG
Received 1 Aug 2014Laeverik Orgill Vidlin Shetland ZE2 9QB
Received 2 Aug 2014Port Business Park Gremista Lerwick Shetland ZE1 0TA
Received 4 Aug 2014Methodist Church North Roe Shetland ZE2 9RY
Received 4 Aug 201425 Market Street Lerwick Shetland ZE1 0JP
Received 5 Aug 20141 Ladies Mire Brae Shetland ZE2 9TZ
Received 5 Aug 2014Adjacent To Bonheoga Glenburn Road Hamnavoe Burra Shetland ZE2 9JZ
Received 5 Aug 2014Bjarg Upper Hillside Gulberwick Shetland ZE2 9JX
Received 6 Aug 2014Uradale East Voe Scalloway Shetland ZE1 0US
Received 7 Aug 2014Lerwick Post Office Commercial Street Lerwick Shetland ZE1 0AA
Received 7 Aug 2014Adjacent To Huddins Lower Sound Lerwick Shetland ZE1 0RN
Received 7 Aug 2014Djubdale Busta Brae Shetland ZE2 9QN
Received 11 Aug 2014Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU
Received 7 Aug 2014Lerwick Fish Traders Gremista Industrial Estate Gremista Lerwick Shetland ZE1 0PX
Received 15 Aug 2014Pier Aith Shetland ZE2 9NB
Received 18 Aug 2014Hillhead Ollaberry Shetland ZE2 9RT
Received 18 Aug 2014Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage