Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,056 approved · 113 refused · 248 withdrawn. Received dates in our records: 5 Jun 2006 to 7 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Judane (shetland) Ltd North Road Lerwick Shetland ZE1 0PR
Received 9 Jan 2014Grace Dieu Skellister South Nesting Shetland ZE2 9PP
Received 10 Jan 2014South Brae Quarff Shetland ZE2 9EY
Received 13 Jan 2014Northa Voe Vementry
Received 14 Jan 2014Hamar Northmavine Shetland ZE2 9RG
Received 13 Jan 20146 Greenfield Place Lerwick Shetland ZE1 0AQ
Received 14 Jan 2014Marrister Whalsay Shetland ZE2 9AE
Received 14 Jan 2014Existing Mussel Farm North Knowe Muckle Roe
Received 14 Jan 2014Esplanade Lerwick Shetland ZE1 0LL
Received 16 Jan 2014Existing Mussel Farm Buddascord Muckle Roe
Received 14 Jan 2014Brattahild Kirkabister Vidlin Shetland ZE2 9QB
Received 17 Jan 2014Shetland Golf Club Dale Gott Shetland ZE2 9SB
Received 20 Jan 2014St Clements St Olaf Street Lerwick Shetland ZE1 0ES
Received 20 Jan 2014Marthastoon Aith Shetland ZE2 9GZ
Received 17 Jan 2014Adjacent To The Cottage Cumliewick Sandwick Shetland ZE2 9HH
Received 20 Jan 2014Quinnilea Laxo Vidlin Shetland ZE2 9QD
Received 20 Jan 2014Adjacent To North Taing Cott Weisdale Shetland ZE2 9LN
Received 20 Jan 2014Gorm Swinister Sandwick Shetland ZE2 9HH
Received 20 Jan 2014Braelea Hamnavoe Burra Shetland ZE2 9JY
Received 22 Jan 2014Scatsta Quarry Scatsta Brae Shetland ZE2 9QP
Received 22 Jan 2014St Clements St Olaf Street Lerwick Shetland ZE1 0ES
Received 24 Jan 2014Uphouse Sellafirth Yell Shetland ZE2 9DG
Received 27 Jan 2014Connemarah Mid Yell Yell Shetland ZE2 9BN
Received 25 Jan 2014Donnamaris Hoganess Bridge Of Walls Shetland ZE2 9NR
Received 25 Jan 2014Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage