Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,050 approved · 113 refused · 248 withdrawn. Received dates in our records: 12 Jun 2006 to 7 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Hamar Aywick Yell Shetland ZE2 9AX
Received 6 Nov 2013Vaa Lochend North Roe Shetland ZE2 9RZ
Received 6 Nov 2013East Longfield Dunrossness Shetland ZE2 9JH
Received 6 Nov 20131 Ludi Bridge End Burra Shetland ZE2 9LD
Received 6 Nov 20132 Ludi Burra Shetland ZE2 9LD
Received 6 Nov 2013North Tug Master's Garage Holmsgarth Road Lerwick Shetland ZE1 0PW
Received 7 Nov 2013Old Manse Marrister Whalsay Shetland ZE2 9AE
Received 8 Nov 201367 Commercial Street Lerwick Shetland ZE1 0AB
Received 12 Nov 2013The Final Frontier Noness Sandwick Shetland ZE2 9HW
Received 12 Nov 2013Grunivoe Walls Shetland ZE2 9PF
Received 13 Nov 2013Strandhoull Gott Tingwall Shetland ZE2 9SF
Received 13 Nov 2013Garden Bixter Shetland ZE2 9NA
Received 14 Nov 2013Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU
Received 13 Nov 201391-93 St Olaf Street Lerwick Shetland ZE1 0ES
Received 14 Nov 2013Norrandaal Gulberwick Shetland ZE2 9JX
Received 18 Nov 2013Fladdabister Cunningsburgh Shetland ZE2 9HA
Received 19 Nov 201393-95 Commercial Street Lerwick Shetland ZE1 0BD
Received 19 Nov 201393-95 Commercial Street Lerwick Shetland ZE1 0BD
Received 19 Nov 2013Hermaness Car Park Burrafirth Unst Shetland ZE2 9EQ
Received 20 Nov 201326 Goodlad Crescent Lerwick Shetland ZE1 0QN
Received 21 Nov 2013Kirkhouse South Whiteness Whiteness Shetland ZE2 9LL
Received 21 Nov 2013E&H Building Contractors Ltd Baillister Tingwall Shetland ZE2 9SB
Received 21 Nov 2013North Gremista Road Lerwick Shetland ZE1 0PX
Received 21 Nov 2013County Buildings Lerwick Shetland ZE1 0EP
Received 21 Nov 2013Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage