Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
6,984 approved · 113 refused · 248 withdrawn. Received dates in our records: 4 Jul 2006 to 7 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
4 Hillhead Lerwick Shetland ZE1 0EJ
Received 12 Feb 2013Ovrebygd Sellivoe Bridge Of Walls Shetland ZE2 9NR
Received 14 Feb 2013Garths Of Ham South Ham Bressay Shetland ZE2 9ER
Received 14 Feb 2013Hillwell Brake Quendale Shetland ZE2 9JD
Received 14 Feb 2013Site 4 Greenfield Road Cullister Sandwick Shetland ZE2 9NZ
Received 14 Feb 2013Northra Voe, Vementry
Received 14 Feb 2013Grindischool Ham Bressay Shetland ZE2 9ER
Received 18 Feb 2013Lochend House Lochend North Roe Shetland ZE2 9RZ
Received 18 Feb 2013Runn Hill Skellister South Nesting Shetland ZE2 9PP
Received 21 Feb 2013Mid Kame Voe Shetland ZE2 9PX
Received 21 Feb 2013Land At Scalla Field Weisdale Shetland ZE2 9LW
Received 21 Feb 2013South Mid Field Weisdale ZE2 9LW
Received 21 Feb 2013Nesbister Whiteness Shetland ZE2 9LJ
Received 21 Feb 2013South Of Fladdabister Lime Kilns Fladdabister Cunningsburgh Shetland ZE2 9HA
Received 21 Feb 2013South East Of Fladdabister Bridge Fladdabister Cunningsburgh Shetland ZE2 9HA
Received 21 Feb 2013Rocklea Wethersta Brae Shetland ZE2 9QL
Received 21 Feb 2013Melville House Toab Virkie Shetland ZE3 9JL
Received 21 Feb 2013South Voe, Burra
Received 22 Feb 2013The Dykes Upper Sound Lerwick Shetland ZE1 0RQ
Received 25 Feb 20131 West Hillcrest Lerwick Shetland ZE1 0JZ
Received 25 Feb 2013Tagon Farm Tagon Voe Shetland ZE2 9PT
Received 25 Feb 2013Lang Ayre Urafirth Hillswick Shetland ZE2 9RH
Received 25 Feb 2013Burgadies Levenwick Shetland ZE2 9HX
Received 26 Feb 2013Parkgate Brae Shetland ZE2 9QS
Received 28 Feb 2013Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage