Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
6,976 approved · 113 refused · 248 withdrawn. Received dates in our records: 4 Jul 2006 to 7 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Millhouse Symbister Whalsay Shetland ZE2 9AQ
Received 7 Dec 2012Gutcher Quarry Gutcher Yell Shetland ZE2 9DF
Received 14 Dec 2012North Haa Aith Shetland ZE2 9ND
Received 17 Dec 2012Site Adjacent Skagus Wadbister Girlsta Shetland ZE2 9SQ
Received 18 Dec 2012Site Adjacent Karanga Vidlin Shetland ZE2 9QB
Received 19 Dec 2012Cullivoe, Bluemull Sound
Received 3 Jan 2013North Lodge 10 Hillside Park Gulberwick Shetland ZE2 9FE
Received 3 Jan 2013The Bakers Rest Tea Room Walls Shetland ZE2 9PF
Received 3 Jan 2013Grindidale Trondra Shetland ZE1 0XL
Received 4 Jan 2013Aithsetter Cunningsburgh Shetland ZE2 9HG
Received 10 Jan 20133 Baila Lerwick Shetland ZE1 0DH
Received 9 Jan 2013Freester Croft Skellister South Nesting Shetland ZE2 9PP
Received 10 Jan 2013Bridge-End Outdoor Centre, Bridge-End, Burra
Received 11 Jan 2013Belmont Ferry Terminal Unst Shetland ZE2 9DW
Received 14 Jan 2013A970/A971 Junction Gott Tingwall Shetland ZE2 9XJ
Received 15 Jan 2013Mossbank Primary School Firth Mossbank Shetland ZE2 9RB
Received 15 Jan 2013Vidlin Shop Vidlin Shetland ZE2 9QB
Received 15 Jan 2013Gletness Junction South Nesting Shetland ZE2 9XA
Received 15 Jan 2013Port Administration Building Sellaness Sullom Shetland ZE2 9QR
Received 17 Jan 2013Ness Of Copister, Hamnavoe, Yell
Received 17 Jan 2013Drumquin Guest House Brae Shetland ZE2 9QJ
Received 22 Jan 2013Littleness Symbister Whalsay Shetland ZE2 9AG
Received 22 Jan 2013Strand Gott Tingwall Shetland ZE2 9SE
Received 23 Jan 2013Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage