Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,004 approved · 113 refused · 248 withdrawn. Received dates in our records: 4 Jul 2006 to 7 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Adjacent To Leagarth Hoswick Sandwick Shetland ZE2 9HL
Received 7 May 2013Olas Voe Gruting
Received 9 May 2013Parkgate Brae Shetland ZE2 9QS
Received 10 May 2013Freester Skellister South Nesting Shetland ZE2 9PP
Received 10 May 2013Leask Motors Gremista Lerwick Shetland ZE1 0PX
Received 13 May 2013Shoadals Foula Shetland ZE2 9PN
Received 13 May 2013The Flaeshins North Fetlar
Received 8 May 2013Hill Of Hoswick Hoswick Sandwick Shetland ZE2 9HL
Received 13 May 2013Pund Of Loot Mossbank Shetland ZE2 9TU
Received 10 May 20134 Hillhead Lerwick Shetland ZE1 0EJ
Received 13 May 2013Grantfield Garage North Road Lerwick Shetland ZE1 0NT
Received 14 May 2013Sea Road Lerwick Shetland ZE1 0RD
Received 14 May 2013Sillerford Sandness Shetland ZE2 9PL
Received 14 May 2013San Roque Aithsetter Cunningsburgh Shetland ZE2 9HG
Received 15 May 2013Mignadal Lower Voe Voe Shetland ZE2 9PX
Received 16 May 2013Avena Sandwick Shetland ZE2 9HW
Received 16 May 2013Sella Ness Graven Shetland ZE2 9UP
Received 16 May 2013Scatsta Brae Shetland ZE2 9QP
Received 16 May 2013Leabrek Burravoe Yell Shetland ZE2 9AY
Received 17 May 2013North Tugmaster's Garage Holmsgarth Road Lerwick Shetland ZE1 0PW
Received 17 May 2013Heogapund Brunthill Walls Shetland ZE2 9PF
Received 14 May 2013Heatherlea Burravoe Yell Shetland ZE2 9AY
Received 20 May 2013Leaside Burravoe Yell Shetland ZE2 9AY
Received 20 May 2013The Firth North Bixter
Received 17 May 2013Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage