Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
6,907 approved · 113 refused · 243 withdrawn. Received dates in our records: 4 Jul 2006 to 7 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
North House Eswick South Nesting Shetland ZE2 9PS
Received 24 Apr 2012J & M Fraser Fish Shop Esplanade Lerwick Shetland ZE1 0LL
Received 25 Apr 2012Aithsetter Cunningsburgh Shetland ZE2 9HG
Received 27 Apr 2012Aithsetter Cunningsburgh Shetland ZE2 9HG
Received 27 Apr 2012Burnthamersland Girlsta Shetland ZE2 9SQ
Received 25 Apr 2012North Hoo Fields Gremista Lerwick
Received 26 Apr 2012Shalders Ayre, Scalloway
Received 27 Apr 2012Field North Of Tingwall Airport Tingwall Shetland ZE2 9SB
Received 30 Apr 2012Efstigarth Herra Yell Shetland ZE2 9BL
Received 30 Apr 2012117 Commercial Street Lerwick Shetland ZE1 0DN
Received 30 Apr 2012117 Commercial Street Lerwick Shetland ZE1 0DN
Received 30 Apr 201230 North Road Lerwick Shetland ZE1 0NT
Received 1 May 2012The Whyte House 2 Heathery Park Gulberwick Shetland ZE2 9GD
Received 1 May 2012Sevilla Cottage Tresta Bixter Shetland ZE2 9LT
Received 2 May 2012Shalders Ayre 2 Fogralea Lerwick Shetland ZE1 0SE
Received 30 Apr 2012Roe Sound, Muckle Roe
Received 1 May 2012Adjacent To Vindhler Aithsetter Cunningsburgh Shetland ZE2 9HG
Received 3 May 2012Laebrack Ireland Bigton Shetland ZE2 9JA
Received 3 May 2012B9076 Junction To Sellaness Shetland ZE2 9QR
Received 3 May 2012A970/B9076 Junction Brae Shetland ZE2 9QJ
Received 3 May 2012A970 Brig O' Fitch Junction
Received 3 May 2012Tagon Junction Voe ZE2 9PT
Received 3 May 2012Chalet North Of Barkland Fair Isle Shetland ZE2 9JU
Received 8 May 2012North Of Gardie South Voe Walls ZE2 9PB
Received 9 May 2012Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage