Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
8,478Searchable applications
125Recorded as pending
98%Approval rate · 6,994 approved or refused records
113Refused applications

6,881 approved · 113 refused · 243 withdrawn. Received dates in our records: 4 Jul 2006 to 7 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2012/044/PPF

    Change of use of 1st floor offices and store to residential flat

    Henderson's Shop Nord Baltasound Unst Shetland ZE2 9DX

    Received 9 Feb 2012
  2. Decided2012/045/ADV

    To erect advertising signboard

    Skibhoul Baltasound Unst Shetland ZE2 9DP

    Received 10 Feb 2012
  3. Decided2012/046/ADV

    erect advertising signboard

    Ulsta Ferry Terminal Ulsta Yell Shetland ZE2 9BD

    Received 10 Feb 2012
  4. Decided2012/047/SCR

    Request for EIA screening opinion on the creation of a 6 hectare lay down area. Rova Head, Lerwick.

    Rova Head Lerwick

    Received 10 Feb 2012
  5. Decided2012/048/PPF

    To build a sea wall at site of Kiln Bar Car Park to comply with requirements of Planning Permission Ref PPA-360-2006 (Planning Authority Ref. 2010/312/PCD).

    Kiln Bar Carpark Main Street Scalloway Shetland Shetland ZE1 0TR

    Received 13 Feb 2012
  6. Unknown2012/005/MAR

    To modify an existing salmon farm by amending cages to eight 80m circumference cages

    Selivoe, Sand

    Received 15 Feb 2012
  7. Decided2012/049/PPF

    Variation of planning permission 2010/326/PCD, to widen access road, form coastal protection works and expand car park, Sullom Voe Oil Terminal, Mossbank, by removing condition numbers 6 and 7

    Sullom Voe Terminal Calbackness Mossbank Shetland ZE2 9TU

    Received 13 Feb 2012
  8. Decided2012/050/PPF

    Change of use of agricultural land to garden ground and erect attached garage to north elevation

    15 Atlaness Hamnavoe Burra Shetland ZE2 9XW

    Received 22 Feb 2012
  9. Decided2012/051/PPF

    erect dwellinghouse

    Land Adjacent To Lower House South Whiteness Whiteness Shetland ZE2 9LL

    Received 14 Feb 2012
  10. Unknown2012/006/WL

    To change use of existing barge from mussel harvesting facility to private workshop for repair and building of traditional boats (retrospective)

    South Olnafirth, Voe

    Received 15 Feb 2012
  11. Decided2012/053/PPF

    Replace garage within garden grounds and alter and extend existing dwellinghouse

    Bayview Symbister Whalsay Shetland ZE2 9AA

    Received 16 Feb 2012
  12. Decided2012/054/APN

    Erection of polycrub

    Grostane East Voe Scalloway Shetland ZE1 0US

    Received 17 Feb 2012
  13. Decided2012/055/PPF

    Extend dwellinghouse

    Wilan Levenwick Shetland ZE2 9HX

    Received 21 Feb 2012
  14. Decided2012/056/PPP

    Erect two dwellinghouses (Permission in Principle)

    Utnabrake Utnabrek Scalloway Shetland ZE1 0UQ

    Received 21 Feb 2012
  15. Decided2012/058/PPP

    Erect dwellinghouse and develop existing track

    New House Toab Virkie Shetland ZE3 9JL

    Received 22 Feb 2012
  16. Decided2012/059/PPP

    Erect dwellinghouse (permission in principle)

    SIte 4 Nesbister Whiteness Shetland ZE2 9LJ

    Received 22 Feb 2012
  17. Decided2012/060/PPP

    erect dwellinghouse (Planning in Principle)

    Nesbister Whiteness Shetland ZE2 9LJ

    Received 22 Feb 2012
  18. Decided2012/061/PPF

    Erect 1 and a half storey extension to north elevation and single storey link connecting house to garage

    Da Lodge Cauldhame Trondra Shetland ZE1 0XL

    Received 22 Feb 2012
  19. Decided2012/062/PPF

    Demolish existing garage and erect new 3 No, car garage

    Goudie Funeral Directors Scalloway Road Lerwick Shetland ZE1 0LD

    Received 22 Feb 2012
  20. Decided2012/064/PPF

    Change use of former kirk to workshop/shop and extend; erect associated 5kw turbine on 12m tower

    Dale Gospel Hall Dale Walls Shetland ZE2 9PE

    Received 24 Feb 2012
  21. Decided2012/065/PPF

    Residential extension

    Easterlea East Yell Yell Shetland ZE2 9AY

    Received 24 Feb 2012
  22. Decided2012/066/PPF

    Erect detached dwellinghouse with septic tank and soakaway

    Site East Of Lochend Wadbister Girlsta Shetland ZE2 9SQ

    Received 24 Feb 2012
  23. Decided2012/067/FORMB

    Line deviation

    Dale Golf Course Shetland

    Received 27 Feb 2012
  24. Decided2012/068/PPF

    Erect single storey extension

    3 Parkfield Lerwick Shetland ZE1 0HW

    Received 24 Feb 2012

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage