Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
9,807Searchable applications
135Recorded as pending
99%Approval rate · 7,836 approved or refused records
116Refused applications

7,720 approved · 116 refused · 262 withdrawn. Received dates in our records: 20 May 2004 to 12 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2017/307/PPF

    Construction and operation of three small scale wind turbine generators as part of the wider Fair Isle Low Carbon Electricity Storage and Generation Project

    The Rippack Fair Isle Shetland

    Received 21 Sept 2017
  2. Decided2017/305/PPP

    To demolish derelict shed & change use of agricultural ground to construct single storey chalet, create new access road and parking area (planning permission in principle)

    North Brough Cullivoe Yell Shetland ZE2 9DD

    Received 21 Sept 2017
  3. Decided2017/308/PPF

    Erect new dwelling house with air source heat pump

    The Lea Muckle Roe Shetland ZE2 9QW

    Received 25 Sept 2017
  4. Decided2017/311/PPF

    New dwellinghouse, garage, access and change of use of land from croft to garden

    New House The Ness Gunnister Shetland

    Received 26 Sept 2017
  5. Decided2017/312/AMSC

    Application to erect dwelling house, in accordance with Planning Conditions 3 and 4 (2014/248/PPP)

    Plot 2 Sundibanks East Voe Scalloway Shetland

    Received 26 Sept 2017
  6. Decided2017/313/PPF

    Change of use of mission hall (Class 10) to become part of the existing adjacent residential accommodation (Class 9)

    9 Mounthooly Street Lerwick Shetland ZE1 0BJ

    Received 25 Sept 2017
  7. Decided2017/314/PPF

    Two storey extension to fish factory including new office

    Unit 1 Blacksness Pier Blacksness Scalloway Shetland ZE1 0TQ

    Received 26 Sept 2017
  8. Decided2017/315/PPF

    To construct extension to existing dwelling house and re-clad external walls and roof of existing dwelling

    Allynlea Haroldswick Unst Shetland ZE2 9EQ

    Received 28 Sept 2017
  9. Decided2017/316/PPF

    Demolish existing derelict dwelling and erect new dwelling with septic tank and air source heat pump

    Derelict Building Whitesness Walls Shetland

    Received 29 Sept 2017
  10. Decided2017/031/WL

    To construct new rock armour protection in front of the existing ninian oil pipeline landfall sea wall (retrospective)

    Firth Ness, Mossbank

    Received 21 Sept 2017
  11. Decided2017/317/PPF

    Excavate area local to Lunna Kirk to install earthing matt's which provide lightening protection to previously installed Cathodic Protection Transformer

    Booth Of Lunna Grunnavoe Vidlin Shetland ZE2 9QF

    Received 29 Sept 2017
  12. Decided2017/318/PPF

    General purpose agricultural shed & hardstanding area (Retrospective Application)

    Aith Cunningsburgh Shetland ZE2 9HG

    Received 2 Oct 2017
  13. Decided2017/319/ADV

    4 illuminated signs

    Baillister Shetland

    Received 2 Oct 2017
  14. Decided2017/032/MAR

    To deploy five 130m twin-headline longlines for the production of mussels at the location of an existing consented mussel farm (retrospective)

    Longa Ness, Brindister

    Received 2 Oct 2017
  15. Decided2017/033/MPN

    Application for prior notification under classes 21A and 21B of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended): Revision of approved scheme from 12 x 90m-circumference cages to 10 x 100m-circumference cages and relocation of the feed barge within the existing site area

    South Havra, Shetland

    Received 3 Oct 2017
  16. Decided2017/034/MPN

    Application for prior notification under classes 21A and 21B of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended): Revision of approved scheme from 14 x 80m-circumference cages to 9 x 100m-circumference cages and relocation of the feed barge within the existing site area

    Teisti Geo, Clift Sound

    Received 3 Oct 2017
  17. Decided2017/320/APN

    Agricultural Shed

    Tow Cunningsburgh Shetland ZE2 9HB

    Received 2 Oct 2017
  18. Decided2017/321/PPF

    To erect dwelling house

    Site Adjacent To Greentoon Blett Cunningsburgh Shetland ZE2 9HF

    Received 6 Oct 2017
  19. Decided2017/322/LBC

    Install 2no. signboards to the main (West) entrance

    Town Hall Hillhead Lerwick Shetland ZE1 0HB

    Received 6 Oct 2017
  20. Decided2017/323/APN

    Erect general purpose agricultural shed and access track

    Greenmow Cunningsburgh Shetland ZE2 9HG

    Received 6 Oct 2017
  21. Decided2017/324/PPF

    Erect workshop/store

    Midaal Gott Tingwall ZE2 9SF

    Received 6 Oct 2017
  22. Decided2017/035/MAR

    To deploy two 150m twin-headline longlines at the location of an existing consented mussel farm (retrospective). Also to extend said longlines to 220m in length in a northwesterly direction and to deploy an additional three 220m twin-headline longlines to the northeast of the existing deployed lines (proposed); all longlines to be used for on-growing of mussels.

    Wrawick, Roe Sound

    Received 4 Oct 2017
  23. Decided2017/325/ADV

    2no. freestanding signs erected inside the property boundary

    Town Hall Hillhead Lerwick Shetland ZE1 0HB

    Received 11 Oct 2017
  24. Decided2017/326/PPF

    Erect single storey extension to existing dwellinghouse, form new access track and parking area

    Grindwell Knowe Vidlin Shetland ZE2 9QB

    Received 11 Oct 2017

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage