Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Unclassified road to Upper Kergord runs approximately 1.5km, from a junction with the B9075, approximately 70m east of B9075 of Weisdale crossing.
Last published check: 30 Sept 2026, 12:17. Check the council record for more recent changes.
Unclassified road to Upper Kergord runs approximately 1.5km, from a junction with the B9075, approximately 70m east of B9075 of Weisdale crossing.
This record has no verified map location.
View council mapProvision of a 2.09 km access track and associated works, new junction and temporary construction compound.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| EMAIL TO DEVELOPER - 11.9.2020 18.42Correspondence · PDF | 11 Sept 2020 | View |
| LETTER TO DEVELOPER GIVING INFORMAL AGREEMENT TO AMEND WORKING HOURS (ATTACHED TCorrespondence · PDF | 11 Sept 2020 | View |
| CONSULTEE COMMENT - ROADSConsultee Comment · PDF | 4 Aug 2020 | View |
| EMAIL TO DEVELOPER - 10.7.2020 11.27Correspondence · PDF | 10 Jul 2020 | View |
| LETTER TO DEVELOPER GIVING INFORMAL AGREEMENT TO AMEND WORKING HOURS (ATTACHED TCorrespondence · PDF | 10 Jul 2020 | View |
| EMAIL FROM DEVELOPER - 6.7.2020 12.57Correspondence · PDF | 6 Jul 2020 | View |
| REQUEST FROM DEVELOPER TO AMEND THE APPROVED WORKING HOURS (ATTACHED TO EMAIL 6.Correspondence · PDF | 6 Jul 2020 | View |
| CHIEF PLANNER LETTER SUBMITTED BY DEVELOPER IN SUPPORT OF REQUEST TO AMEND WORKISupporting Documents · PDF | 6 Jul 2020 | View |
| DISCHARGE OF CONDITION - APPROVEDDecision · PDF | 24 Jun 2020 | View |
| COVER E MAIL WITH INFORMATION FOR DCON13Correspondence · PDF | 24 Jun 2020 | View |
| COPY OF LETTER TO K ADAMCorrespondence · PDF | 24 Jun 2020 | View |
| COPY OF RESPONSE FROM K ADAMCorrespondence · PDF | 24 Jun 2020 | View |
| EMAIL FROM FRANK HAYCorrespondence · PDF | 18 Jun 2020 | View |
| CONSTRUCTION AND AIL TRAFFIC ROUTESCorrespondence | 17 Jun 2020 | View |
| HGV MOVEMENTS - JUNE 20 TO NOV 20 STAGE 2Correspondence | 17 Jun 2020 | View |
| TDL KAT TMP SIGNS STAGE 2Correspondence · PDF | 17 Jun 2020 | View |
| DELIVER DRIVER INSTRUCTIONSCorrespondence | 17 Jun 2020 | View |
| TDL KAT 018 UN NAMDED ROAD MAINT REV BCorrespondence | 17 Jun 2020 | View |
| 16:00 EMAIL CORRESPONDENCECorrespondence · PDF | 17 Jun 2020 | View |
| SITE LAYOUTDrawing · PDF | 17 Jun 2020 | View |
| SITE LOCATIONDrawing · PDF | 17 Jun 2020 | View |
| SANDWATER ROAD ALIGNMENTDrawing · PDF | 17 Jun 2020 | View |
| KERGORD ROAD ALIGNMENTDrawing · PDF | 17 Jun 2020 | View |
| ROAD AGREEMENTDrawing · PDF | 17 Jun 2020 | View |
| ROAD JUNCTIONDrawing · PDF | 17 Jun 2020 | View |
| ROAD JUNCTIONDrawing · PDF | 17 Jun 2020 | View |
| ROAD JUNCTIONDrawing · PDF | 17 Jun 2020 | View |
| ROAD JUNCTIONDrawing · PDF | 17 Jun 2020 | View |
| ROAD JUNCTIONDrawing · PDF | 17 Jun 2020 | View |
| ROAD JUNCTIONDrawing · PDF | 17 Jun 2020 | View |
| ROAD JUNCTIONDrawing · PDF | 17 Jun 2020 | View |
| ROAD JUNCTIONDrawing · PDF | 17 Jun 2020 | View |
| CONSULTATION TO ROADS ON FURTHER INFORMATION SUBMISSION - 9.6.2020 09.51Correspondence · PDF | 9 Jun 2020 | View |
| FURTHER INFORMATION SUBMISSION FROM APPLICANT - EMAIL 8.6.2020 16.24Correspondence · PDF | 8 Jun 2020 | View |
| DISCHARGE OF NID COND 2Discharge of Condition(s) | 4 Jun 2020 | View |
| DISCHARGE OF CONDITION 2Discharge of Condition(s) · PDF | 4 Jun 2020 | View |
| EMAIL TO APPLICANT REQUESTING FURTHER INFORMATION - 3.6.2020 16.54Correspondence · PDF | 3 Jun 2020 | View |
| EMAIL RE NID FORMDischarge of Condition(s) · PDF | 2 Jun 2020 | View |
| NID FORMSuperseded Supporting Documents · PDF | 2 Jun 2020 | View |
| EMAIL RE NID FORMDischarge of Condition(s) · PDF | 2 Jun 2020 | View |
| REVISED NID FORMDischarge of Condition(s) · PDF | 2 Jun 2020 | View |
| CONSULTATION RESPONSE - ROADSConsultee Comment · PDF | 25 May 2020 | View |
| EMAIL FROM APPLICANT PROVIDING INFORMATION REQUESTED - 19.5.2020 10.20Correspondence · PDF | 19 May 2020 | View |
| SUPPORTING DOCUMENTS SUBMITTED BY APPLICANT WITH EMAIL 19.5.2020 10.20Supporting Documents · PDF | 19 May 2020 | View |
| EMAIL FROM APPLICANT 14.5.2020 TO DISCHARGE CONDITION 19Application Form · PDF | 18 May 2020 | View |
| REQUEST TO APPLICANT FOR COPIES OF EVIDENCE TO SUPPORT THE APPLICATION - 18.5.20Correspondence · PDF | 18 May 2020 | View |
| CONSULTEE COMMENT - ARCHAEOLOGYConsultee Comment · PDF | 15 May 2020 | View |
| --ARCHAEOLOGICAL WRITTEN SCHEME OF INVESTIGATIONApproved Plans · PDF | 15 May 2020 | View |
| DISCHARGE OF CONDITION - APPROVEDDecision · PDF | 15 May 2020 | View |
| APPENDIX BI_PLAN DRAWING AND PEAT REINSTATEMENTApproved Plans · PDF | 20 Mar 2020 | View |
| CULVERT DESIGN METHODOLOGY STATEMENTApproved Plans · PDF | 20 Mar 2020 | View |
| POST WORKS WATERCOURSE AND DRAIN CATCHMENT AREASApproved Plans · PDF | 20 Mar 2020 | View |
| PRE WORKS WATERCOURSE AND DRAIN CATCHMENT AREASApproved Plans · PDF | 20 Mar 2020 | View |
| DESIGN NOTE: BURN OF WEISDALE CROSSING FLOOD ASSESSMENTApproved Plans · PDF | 20 Mar 2020 | View |
| PRE/POST WORKS BURN OF WEISDALE CATCHMENT AREAApproved Plans · PDF | 20 Mar 2020 | View |
| TYPICAL CULVERT DETAILS (SHEET 1 OF 2)Approved Plans · PDF | 20 Mar 2020 | View |
| TYPICAL CULVERT DETAILS (SHEET 2 OF 2)Approved Plans · PDF | 20 Mar 2020 | View |
| TYPICAL DRAINAGE DETAILSApproved Plans · PDF | 20 Mar 2020 | View |
| BURN OF DROSWALL CULVERT DETAILSApproved Plans · PDF | 20 Mar 2020 | View |
| KERGORD ACCESS ADVANCED WORKS DRAINAGE DETAILS (SHEET 1 OF 2)Approved Plans · PDF | 20 Mar 2020 | View |
| KERGORD ACCESS ADVANCED WORKS DRAINAGE DETAILS (SHEET 2 OF 2)Approved Plans · PDF | 20 Mar 2020 | View |
| VEWF_CEMP_APPENDICES_FINAL_V1.5IApproved Plans · PDF | 20 Mar 2020 | View |
| VEWF_CEMP_FINALApproved Plans · PDF | 20 Mar 2020 | View |
| PEAT MANAGEMENT PLANApproved Plans · PDF | 20 Mar 2020 | View |
| DISCHARGE OF CONDITION - APPROVEDDecision · PDF | 20 Mar 2020 | View |
| COVERING E MAIL WITH REIVSED DRAWINGSCorrespondence · PDF | 18 Mar 2020 | View |
| PEAT MANAGE PLAN APPENDIX ADrawing · PDF | 18 Mar 2020 | View |
| PEAT MANAGE PLAN APPENDIX BIDrawing · PDF | 18 Mar 2020 | View |
| PEAT MANAGE PLAN APPENDIX BIIDrawing · PDF | 18 Mar 2020 | View |
| EXCAVATED WASTE STATEMENTSupporting Documents · PDF | 18 Mar 2020 | View |
| SITE WASTE MANAGEMENT PLAN REV 2Supporting Documents · PDF | 18 Mar 2020 | View |
| CONSULTEE COMMENT - DRAINAGE/FLOODConsultee Comment · PDF | 17 Mar 2020 | View |
| CONSULTEE COMMENT - DRAINAGE/FLOODConsultee Comment · PDF | 17 Mar 2020 | View |
| NID FORMDischarge of Condition(s) · PDF | 13 Mar 2020 | View |
| EMAIL RE DISCHARGING CONDITIONSDischarge of Condition(s) · PDF | 13 Mar 2020 | View |
| 15:45 EMAIL RE DISCHARGING CONDITIONSDischarge of Condition(s) · PDF | 13 Mar 2020 | View |
| 15:45 EMAIL RE DISCHARGING CONDITIONSDischarge of Condition(s) · PDF | 13 Mar 2020 | View |
| APPENDIX BI_PLAN DRAWING AND PEAT REINSTATEMENT EXTENDischarge of Condition(s) · PDF | 13 Mar 2020 | View |
| CEMP - UPDATE TO APPENDIX 8.1Discharge of Condition(s) · PDF | 13 Mar 2020 | View |
| APPENDIX 8.1_POLLUTION PREVENTION PLANDischarge of Condition(s) · PDF | 13 Mar 2020 | View |
| PEAT MANAGEMENT PLAN_FINAL_V5Superseded Report · PDF | 11 Mar 2020 | View |
| PEAT MANAGEMENT PLAN_APPENDIX AApproved Plans · PDF | 11 Mar 2020 | View |
| APPENDIX BI_PLAN DRAWINGApproved Plans · PDF | 11 Mar 2020 | View |
| APPENDIX BII_SECTION DRAWING_PEAT REINSTATEMENTApproved Plans · PDF | 11 Mar 2020 | View |
| APPENDIX C_EXCAVATED WASTE STATEMENTApproved Plans · PDF | 11 Mar 2020 | View |
| SITE WASTE MANAGEMENT PLANApproved Plans · PDF | 11 Mar 2020 | View |
| PEAT MANAGEMENT PLAN_APPENDIX C_SWMPApproved Plans · PDF | 11 Mar 2020 | View |
| DISCHARGE OF CONDITION - APPROVEDDecision · PDF | 11 Mar 2020 | View |
| EMAIL FROM AGENT WITH FURTHER INFORMATION ON CONDITION 7 (E) (H) CEMP - RCD 11.3Supporting Documents · PDF | 11 Mar 2020 | View |
| KERGORD ROAD - PROPOSED CONSTRUCTION COMPOUND DRG ATTACHED TO EMAIL 11.3.2020 1Drawing · PDF | 11 Mar 2020 | View |
| EMAIL CORRESPONDENCE FROM APPLICANTCorrespondence · PDF | 9 Mar 2020 | View |
| CONTRACTOR DISCHARGE INFOCorrespondence · PDF | 9 Mar 2020 | View |
| SITE WASTE MANAGEMENT PLANCorrespondence · PDF | 9 Mar 2020 | View |
| CONSULTATION RESPONSE - SNHConsultee Comment · PDF | 9 Mar 2020 | View |
| 11:47 EMAIL CORRESPONDENCE FROM F HAYCorrespondence · PDF | 9 Mar 2020 | View |
| CONSULTATION RESPONSE - SEPAConsultee Comment · PDF | 9 Mar 2020 | View |
| EMAIL CORRESPONDENCEDischarge of Condition(s) · PDF | 6 Mar 2020 | View |
| CEMP_APPENDICES_FINALSuperseded Drawing · PDF | 6 Mar 2020 | View |
| VEWF_CEMP_FINALDischarge of Condition(s) · PDF | 6 Mar 2020 | View |
| EMAIL CORRESPONDENCEDischarge of Condition(s) · PDF | 6 Mar 2020 | View |
| S118021-TG-HML-KA-DR-CH-0002 PLANSuperseded Drawing · PDF | 6 Mar 2020 | View |
| S118021-TG-HML-KA-DR-CH-0003 PLANSuperseded Drawing · PDF | 6 Mar 2020 | View |
| S118021-TG-HML-KA-DR-CH-0004 PLANSuperseded Drawing · PDF | 6 Mar 2020 | View |
| EMAIL REGARDING CONDITION 7 (E) AND (H)Correspondence · PDF | 6 Mar 2020 | View |
| EMAIL RE PEAT MANAGEMENT PLANCorrespondence · PDF | 6 Mar 2020 | View |
| APPENDIX A - PEAT MANAGEMENT PLANDischarge of Condition(s) · PDF | 6 Mar 2020 | View |
| APPENDIX BI_PLAN DRAWINGDischarge of Condition(s) · PDF | 6 Mar 2020 | View |
| APPENDIX BII_SECTION DRAWING_PEAT REINSTATEMENTDischarge of Condition(s) · PDF | 6 Mar 2020 | View |
| APPENDIX C_EXCAVATED WASTE STATEMENTDischarge of Condition(s) · PDF | 6 Mar 2020 | View |
| APPENDIX C - SITE WASTE MANAGEMENT PLANDischarge of Condition(s) · PDF | 6 Mar 2020 | View |
| PEAT MANAGEMENT PLAN_FINAL_V5Discharge of Condition(s) · PDF | 6 Mar 2020 | View |
| CONSULTATION RESPONSE - SEPAConsultee Comment · PDF | 5 Mar 2020 | View |
| CONSULTATION RESPONSE - SEPAConsultee Comment · PDF | 4 Mar 2020 | View |
| DISCHARGE OF CONDITION - APPROVEDDecision · PDF | 4 Mar 2020 | View |
| CONSULTATION RESPONSE - SEPAConsultee Comment · PDF | 4 Mar 2020 | View |
| EMAIL CORRESPONDENCEDischarge of Condition(s) · PDF | 2 Mar 2020 | View |
| APPENDIX 11.1_TYPICAL PERMANENT DRAINAGE DETAILDrawing | 2 Mar 2020 | View |
| SITE WASTE MANAGEMENT PLANApproved Plans · PDF | 28 Feb 2020 | View |
| SUMMARY CONTRACTOR APPROACH TO EXCAVATED WASTEApproved Plans · PDF | 28 Feb 2020 | View |
| EMAIL RE REVISED INFORMATIONDischarge of Condition(s) · PDF | 28 Feb 2020 | View |
| APPENDIX A KERGORD REFINED ALIGNMENTDrawing · PDF | 28 Feb 2020 | View |
| APPENDIX BI - PLANDrawing · PDF | 28 Feb 2020 | View |
| APPENDIX BII - CROSS SECTIONSDrawing · PDF | 28 Feb 2020 | View |
| APPENDIX C - KERGORD ACCESS TRACK_EXCAVATED WASTE STATEMENTDrawing · PDF | 28 Feb 2020 | View |
| APPENDIX C_KERGORD ACCESS TRACK_SITE WASTE MANAGEMENT PLANDrawing · PDF | 28 Feb 2020 | View |
| PEAT MANAGEMENT PLAN_V4Drawing · PDF | 28 Feb 2020 | View |
| PEAT MANAGEMENT PLAN_V4Drawing · PDF | 28 Feb 2020 | View |
| PEAT MANAGEMENT PLAN_V4_HIGHLIGHTED CHANGESDrawing · PDF | 28 Feb 2020 | View |
| DISCHARGE OF CONDITION - APPROVEDDecision · PDF | 27 Feb 2020 | View |
| CONSULTATION RESPONSE - DRAINAGEConsultee Comment · PDF | 27 Feb 2020 | View |
| CONSULTATION RESPONSE - DRAINAGEConsultee Comment · PDF | 27 Feb 2020 | View |
| APPROVED DETAILSApproved Plans · PDF | 26 Feb 2020 | View |
| EMAIL REQUESTING DISCHARGE OF CONDITIONSDischarge of Condition(s) · PDF | 26 Feb 2020 | View |
| EMAIL CORRESPONDENCEDischarge of Condition(s) · PDF | 26 Feb 2020 | View |
| PROPOSED MAINLINE PLANSuperseded Drawing · PDF | 26 Feb 2020 | View |
| PROPOSED MAINLINE PLANSuperseded Drawing · PDF | 26 Feb 2020 | View |
| PROPOSED MAINLINE PLANSuperseded Drawing · PDF | 26 Feb 2020 | View |
| PROPOSED MAINLINE PLANSuperseded Drawing · PDF | 26 Feb 2020 | View |
| PROPOSED MAINLINE PLANSuperseded Drawing · PDF | 26 Feb 2020 | View |
| PROPOSED MAINLINE PLANSuperseded Drawing · PDF | 26 Feb 2020 | View |
| PROPOSED MAINLINE PLANSuperseded Drawing · PDF | 26 Feb 2020 | View |
| EMAIL REQUESTING TO DISCHARGE CONDITION 12Discharge of Condition(s) · PDF | 24 Feb 2020 | View |
| EMAIL REQUESTING DISCHARGE OF CON 18Discharge of Condition(s) · PDF | 21 Feb 2020 | View |
| FIGURE 2.1-CEMP_SITE LOCATIONDrawing · PDF | 21 Feb 2020 | View |
| FIGURE 10.1 - CEMP_TYPICAL DETAILSDrawing · PDF | 21 Feb 2020 | View |
| FIGURE 10.2 - CEMP_INDICATIVE TRACK AND WATERCOURSE CROSSINGDrawing · PDF | 21 Feb 2020 | View |
| FIGURE 10.3 - CEMP_INDICATIVE SCHEMATIC SECTION OF TRACK DRAINAGEDrawing · PDF | 21 Feb 2020 | View |
| FIGURE 10.4 - CEMP_INDICATIVE BORROW PIT DRAINAGEDrawing · PDF | 21 Feb 2020 | View |
| FIGURE 10.5 - CEMP_ INDICATIVE TURBINE DRAINAGEDrawing · PDF | 21 Feb 2020 | View |
| FIGURE 10.6 - CEMP_INDICATIVE SUBSTATION CONTROL ROOMDrawing · PDF | 21 Feb 2020 | View |
| FIGURE 13.1A_D_CEMP_HABITATSDrawing · PDF | 21 Feb 2020 | View |
| FIGURE 14.1 - CEMP_ARCHAEOLOGYDrawing · PDF | 21 Feb 2020 | View |
| CONSTRUCTION ENVIROMENTAL MANAGEMENT PLANDischarge of Condition(s) · PDF | 21 Feb 2020 | View |
| CEMP_APPENDIX 2.1_SCHEDULE OF MITIGATIONDrawing | 21 Feb 2020 | View |
| CEMP_APPENDIX 8.1_CAR_CONSTRUCTION SITE LICENCE_POLLUTION PRVENTION PLANSuperseded Drawing · PDF | 21 Feb 2020 | View |
| CEMP_APPENDIX 11.1_TYPICAL PERMANENT DRAINAGE DETAILDrawing | 21 Feb 2020 | View |
| CEMP_APPENDIX 17.1_INDICATIVE CONSTRUCTION PROGRAMMEDrawing | 21 Feb 2020 | View |
| DISCHARGE OF CONDITION - APPROVEDDecision · PDF | 20 Feb 2020 | View |
| CONSULTATION RESPONSE - SEPAConsultee Comment · PDF | 19 Feb 2020 | View |
| HABITAT MANAGEMENT PLANApproved Plans · PDF | 19 Feb 2020 | View |
| DISCHARGE OF CONDITION - APPROVEDDischarge of Condition(s) · PDF | 14 Feb 2020 | View |
| APPENDIX B - CONSTRUCTION AND AIL TRAFFIC ROUTESApproved Plans · PDF | 13 Feb 2020 | View |
| HGV MOVEMENTS - MAR 20 TO AUG 20Approved Plans · PDF | 13 Feb 2020 | View |
| SIGNAGE ENTRANCE LN000046-VIK-SID-SK-0014-02Approved Plans · PDF | 13 Feb 2020 | View |
| SIGNAGE LN000046-VIK-SID-SK-0014-01Approved Plans · PDF | 13 Feb 2020 | View |
| GEOPHYSICS REPORT VWFS 16Discharge of Condition(s) · PDF | 12 Feb 2020 | View |
| GEOPHYSICS REPORT DOCUMENTDischarge of Condition(s) · PDF | 12 Feb 2020 | View |
| CONSULTATION RESPONSE - SNHConsultee Comment · PDF | 10 Feb 2020 | View |
| CONSULTATION RESPONSE - ROADSConsultee Comment | 10 Feb 2020 | View |
| EMAIL FROM DR TURNER RE WSIDischarge of Condition(s) · PDF | 7 Feb 2020 | View |
| COVERING E MAIL TO DISHARGE CONDITION 3Correspondence · PDF | 5 Feb 2020 | View |
| EMAIL CORRESPONDENCECorrespondence · PDF | 4 Feb 2020 | View |
| EMAIL FROM DR TURNER REGARDING CONDITION DISCHARGEAdvert · PDF | 29 Jan 2020 | View |
| EMAIL TO JAMIE WATT REGARD TO INFORMATION REQUIREDDischarge of Condition(s) · PDF | 29 Jan 2020 | View |
| CONSULTATION RESPONSE - SHETLAND REGIONAL ARCHAEOLOGISTConsultee Comment · PDF | 28 Jan 2020 | View |
| CONSULTATION RESPONSE - SHETLAND REGIONAL ARCHAEOLOGISTConsultee Comment · PDF | 28 Jan 2020 | View |
| EMAIL RE REVISED TMPDischarge of Condition(s) · PDF | 28 Jan 2020 | View |
| REVISED TRAFFIC MANAGEMENT PLANDischarge of Condition(s) · PDF | 28 Jan 2020 | View |
| EMAIL RE REVISED TRAFFIC MANAGEMENT PLANDischarge of Condition(s) · PDF | 28 Jan 2020 | View |
| CONSULTATION RESPONSE - SEPAConsultee Comment · PDF | 22 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 02, MBS COVERAGEApproved Plans · PDF | 20 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 02, MBS COVERAGEApproved Plans · PDF | 20 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 07, MBS COVERAGEApproved Plans · PDF | 20 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 08, MBS COVERAGEApproved Plans · PDF | 20 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 09, MBS COVERAGEApproved Plans · PDF | 20 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 10, MBS COVERAGEApproved Plans · PDF | 20 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 11, MBS COVERAGEApproved Plans · PDF | 20 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 12, MBS COVERAGEApproved Plans · PDF | 20 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 13, MBS COVERAGEApproved Plans · PDF | 20 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 14, MBS COVERAGEApproved Plans · PDF | 20 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 14, ARCTIC TERNApproved Plans · PDF | 16 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 13, GREYLAGApproved Plans · PDF | 16 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 12, SKUASApproved Plans · PDF | 16 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 11, RINGED PLOVERApproved Plans · PDF | 16 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 10, LAPWINGApproved Plans · PDF | 16 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 09, OYSTERCATCHERApproved Plans · PDF | 16 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 08, DUNLINApproved Plans · PDF | 16 Jan 2020 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 07, GOLDEN PLOVERApproved Plans · PDF | 16 Jan 2020 | View |
| BIRD PROTECTION PLANApproved Plans · PDF | 16 Jan 2020 | View |
| DISCHARGE OF CONDITION - APPROVEDDischarge of Condition(s) · PDF | 16 Jan 2020 | View |
| CONSULTATION RESPONSE - DRAINAGEConsultee Comment · PDF | 7 Jan 2020 | View |
| CONSULTATION RESPONSE - DRAINAGEConsultee Comment · PDF | 7 Jan 2020 | View |
| EMAIL CORRESPONDENCE FROM APPLICANTDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| EMAIL CORRESPONDENCE FROM APPLICANTDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| CULVERT DESIGN METHODOLOGY STATEMENTDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| CULVERT DESIGN METHODOLOGY STATEMENTDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| DRAINAGE STRATEGY REPORTDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| DRAINAGE STRATEGY REPORTDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| BURN OF WEISDALE CROSSING FLOOD ASSESSMENTDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| BURN OF WEISDALE CROSSING FLOOD ASSESSMENTDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| EMAIL CORRESPONDENCE FROM APPLICANTDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| EMAIL CORRESPONDENCE FROM APPLICANTDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| PROPOSED MAINLINE PLAN & PROFILE (CHAINAGE 0-300) (1 OF 7)Discharge of Condition(s) · PDF | 20 Dec 2019 | View |
| PROPOSED MAINLINE PLANSuperseded Drawing · PDF | 20 Dec 2019 | View |
| PROPOSED MAINLINE PLANSuperseded Drawing · PDF | 20 Dec 2019 | View |
| PROPOSED MAINLINE PLAN & PROFILE (CHAINAGE 300-600) (2 OF 7)Discharge of Condition(s) · PDF | 20 Dec 2019 | View |
| PROPOSED MAINLINE PLAN & PROFILE (CHAINAGE 600-900) (3 OF 7)Discharge of Condition(s) · PDF | 20 Dec 2019 | View |
| PROPOSED MAINLINE PLANSuperseded Drawing · PDF | 20 Dec 2019 | View |
| PROPOSED MAINLINE PLANSuperseded Drawing · PDF | 20 Dec 2019 | View |
| PROPOSED MAINLINE PLAN & PROFILE (CHAINAGE 900-1200) (4 OF 7)Discharge of Condition(s) · PDF | 20 Dec 2019 | View |
| PROPOSED MAINLINE PLAN & PROFILE (CHAINAGE 1200-1500) (5 OF 7)Discharge of Condition(s) · PDF | 20 Dec 2019 | View |
| PROPOSED MAINLINE PLANSuperseded Drawing · PDF | 20 Dec 2019 | View |
| PROPOSED MAINLINE PLANSuperseded Drawing · PDF | 20 Dec 2019 | View |
| PROPOSED MAINLINE PLAN & PROFILE (CHAINAGE 1500-1800) (6 OF 7)Discharge of Condition(s) · PDF | 20 Dec 2019 | View |
| PROPOSED MAINLINE PLAN & PROFILE (CHAINAGE 1800-2027) (7 OF 7)Discharge of Condition(s) · PDF | 20 Dec 2019 | View |
| PROPOSED MAINLINE PLANSuperseded Drawing · PDF | 20 Dec 2019 | View |
| PREWORKS WATERCOURSE & DRAIN CATCHMENT AREASDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| PREWORKS WATERCOURSE & DRAIN CATCHMENT AREASDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| PRE/POST WORKS BURN OF WEISDALE CATCHMENT AREADischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| POST WORKS WATERCOURSE & DRAIN CATCHMENT AREASDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| POST WORKS WATERCOURSE & DRAIN CATCHMENT AREASDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| TYPICAL CULVERT DETAILS (SHEET 1 OF 2)Discharge of Condition(s) · PDF | 20 Dec 2019 | View |
| TYPICAL CULVERT DETAILS (SHEET 2 OF 2)Discharge of Condition(s) · PDF | 20 Dec 2019 | View |
| BURN OF DROSWALL CULVERT DETAILSDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| KERGORD ACCESS ADVANCED WORKS DRAINAGE DETAILS (SHEET 1 OF 2)Discharge of Condition(s) · PDF | 20 Dec 2019 | View |
| KERGORD ACCESS ADVANCED WORKS DRAINAGE DETAILS (SHEET 2 OF 2)Discharge of Condition(s) · PDF | 20 Dec 2019 | View |
| TYPICAL DRAINAGE DETAILSDischarge of Condition(s) · PDF | 20 Dec 2019 | View |
| CONSULTATION RESPONSE - SNHConsultee Comment · PDF | 18 Dec 2019 | View |
| CONSULTATION RESPONSE - SNHConsultee Comment · PDF | 18 Dec 2019 | View |
| EMAIL FROM AGENT RE BIRD PROTECTION PLANDischarge of Condition(s) · PDF | 12 Dec 2019 | View |
| EMAIL FROM AGENT RE BIRD PROTECTION PLANDischarge of Condition(s) · PDF | 12 Dec 2019 | View |
| BIRD PROTECTION PLANDischarge of Condition(s) | 12 Dec 2019 | View |
| EMAIL TO APPLICANT CONFIRMING RECONSULTATION WITH ROADS AUTHORITY - 2.12.2019 1Correspondence · PDF | 2 Dec 2019 | View |
| EMAIL TO APPLICANT CONFIRMING RECONSULTATION WITH ROADS AUTHORITY - 2.12.2019 1Correspondence · PDF | 2 Dec 2019 | View |
| EMAIL RE TRAFFIC MANAGEMENT PLANDischarge of Condition(s) · PDF | 28 Nov 2019 | View |
| KERGORD ROAD- TMP- CONDITION 17Discharge of Condition(s) | 28 Nov 2019 | View |
| SITE LOCATION LN000046-VIK-SID-SD-0002-01Discharge of Condition(s) · PDF | 28 Nov 2019 | View |
| ROAD ALIGNMENT LN000046-VIK-SID-SD-0003-02Discharge of Condition(s) · PDF | 28 Nov 2019 | View |
| ROAD AGREEMENT LN000046-VIK-SID-SK-0030-04Discharge of Condition(s) · PDF | 28 Nov 2019 | View |
| PUBLIC HIGHWAY SPEED LIMITSDischarge of Condition(s) · PDF | 28 Nov 2019 | View |
| APPENDIX B - CONSTRUCTION AND AIL TRAFFIC ROUTESDischarge of Condition(s) | 28 Nov 2019 | View |
| EMAIL RE TRAFFIC MANAGEMENT PLANDischarge of Condition(s) · PDF | 28 Nov 2019 | View |
| HGV MOVEMENTS - MAR 20 TO AUG 20Discharge of Condition(s) | 28 Nov 2019 | View |
| KERGORD ROAD- TMP- CONDITION 17Discharge of Condition(s) | 28 Nov 2019 | View |
| PUBLIC HIGHWAY SPEED LIMITSDischarge of Condition(s) · PDF | 28 Nov 2019 | View |
| ROAD AGREEMENT LN000046-VIK-SID-SK-0030-04Discharge of Condition(s) · PDF | 28 Nov 2019 | View |
| ROAD ALIGNMENT LN000046-VIK-SID-SD-0003-02Discharge of Condition(s) · PDF | 28 Nov 2019 | View |
| SIGNAGE ENTRANCE LN000046-VIK-SID-SK-0014-02Discharge of Condition(s) · PDF | 28 Nov 2019 | View |
| SIGNAGE LN000046-VIK-SID-SK-0014-01Discharge of Condition(s) · PDF | 28 Nov 2019 | View |
| SITE LOCATION LN000046-VIK-SID-SD-0002-01Discharge of Condition(s) · PDF | 28 Nov 2019 | View |
| CONSULTATION RESPONSE - ENV HEALTHConsultee Comment · PDF | 26 Nov 2019 | View |
| CONSULTATION RESPONSE - ENV HEALTHConsultee Comment · PDF | 26 Nov 2019 | View |
| EMAIL TO APPLICANT REQUESTING FURTHER INFORMATION - 20.11.2019 14.55Correspondence · PDF | 20 Nov 2019 | View |
| EMAIL TO APPLICANT REQUESTING FURTHER INFORMATION - 20.11.2019 14.55Correspondence · PDF | 20 Nov 2019 | View |
| CONSULTEE COMMENT - ROADSConsultee Comment | 19 Nov 2019 | View |
| CONSULTEE COMMENT - ROADSDischarge of Condition(s) | 19 Nov 2019 | View |
| CONSULTATION RESPONSE - SNHConsultee Comment · PDF | 18 Nov 2019 | View |
| CONSULTATION RESPONSE - SNHDischarge of Condition(s) · PDF | 18 Nov 2019 | View |
| EMAIL SEEKING TO DISCHARGE PLANNING PERMISSION CONDITION 14- BIRD SURVEY AND BIRCorrespondence · PDF | 25 Oct 2019 | View |
| CONSULTATION RESPONSE - SNHConsultee Comment · PDF | 16 Oct 2019 | View |
| CONSULTATION RESPONSE - SNHDischarge of Condition(s) · PDF | 16 Oct 2019 | View |
| CONSULTEE COMMENT - ROADSConsultee Comment | 11 Oct 2019 | View |
| CONSULTEE COMMENT - ROADSDischarge of Condition(s) | 11 Oct 2019 | View |
| CONSULTEE COMMENT - SEPADischarge of Condition(s) · PDF | 10 Oct 2019 | View |
| CONSULTEE COMMENT - SEPADischarge of Condition(s) · PDF | 10 Oct 2019 | View |
| PRE-CONSTRUCTION BIRD SURVEYCorrespondence · PDF | 10 Oct 2019 | View |
| BIRD PROTECTION PLANCorrespondence · PDF | 10 Oct 2019 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 02, MBS COVERAGEDrawing | 10 Oct 2019 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 07, GOLDEN PLOVERDrawing | 10 Oct 2019 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 08, DUNLINDrawing | 10 Oct 2019 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 09, OYSTERCATCHERDrawing | 10 Oct 2019 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 10, LAPWINGDrawing | 10 Oct 2019 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 11, RINGED PLOVER & SANDPIPERDrawing | 10 Oct 2019 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 12, SKUASDrawing | 10 Oct 2019 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 13, GREYLAG & GROUSEDrawing | 10 Oct 2019 | View |
| PRE-CON BIRD SURVEY APPENDIX 1 FIG 14, ARCTIC TERN & TEALDrawing | 10 Oct 2019 | View |
| BIRD PROTECTION PLANCorrespondence · PDF | 10 Oct 2019 | View |
| PRE-CONSTRUCTION BIRD SURVEYCorrespondence · PDF | 10 Oct 2019 | View |
| DISCHARGE CONDITION 9Discharge of Condition(s) · PDF | 9 Oct 2019 | View |
| CONDITION 13 DISCHARGEDischarge of Condition(s) · PDF | 9 Oct 2019 | View |
| CONSULTEE COMMENT - SEPAConsultee Comment · PDF | 2 Oct 2019 | View |
| CONSULTEE COMMENT - SEPAConsultee Comment · PDF | 2 Oct 2019 | View |
| EMAIL RE UPDATED INFORMATION SUBMITTEDDischarge of Condition(s) · PDF | 1 Oct 2019 | View |
| TRAFFIC MANAGEMENT PLANDischarge of Condition(s) · PDF | 1 Oct 2019 | View |
| EMAIL RE UPDATED INFORMATION SUBMITTEDDischarge of Condition(s) · PDF | 1 Oct 2019 | View |
| TRAFFIC MANAGEMENT PLANDischarge of Condition(s) · PDF | 1 Oct 2019 | View |
| CONSULTEE COMMENT - SNHConsultee Comment · PDF | 1 Oct 2019 | View |
| CONSULTEE COMMENT - SNHConsultee Comment · PDF | 1 Oct 2019 | View |
| ACKNOWLEDGEMENT LETTERCorrespondence · PDF | 26 Sept 2019 | View |
| CONSULTATION RESPONSE - SEPAConsultee Comment · PDF | 25 Sept 2019 | View |
| CONSULTATION RESPONSE - SEPAConsultee Comment · PDF | 25 Sept 2019 | View |
| CONSULTATION RESPONSE - SHETLAND REGIONAL ARCHAEOLOGISTConsultee Comment · PDF | 25 Sept 2019 | View |
| CONSULTATION RESPONSE - SHETLAND REGIONAL ARCHAEOLOGISTConsultee Comment · PDF | 25 Sept 2019 | View |
| PUBLIC HIGHWAY SPEED LIMITSSupporting Documents · PDF | 24 Sept 2019 | View |
| TRAFFIC MANAGEMENT PLANSuperseded Report · PDF | 24 Sept 2019 | View |
| APPENDIX B - CONSTRUCTION AND AIL TRAFFIC ROUTESDrawing | 24 Sept 2019 | View |
| HGV MOVEMENTSSupporting Documents | 24 Sept 2019 | View |
| ROAD AGREEMENTSuperseded Drawing · PDF | 24 Sept 2019 | View |
| SIGNAGE ENTRANCESuperseded Drawing · PDF | 24 Sept 2019 | View |
| SIGNAGESuperseded Drawing · PDF | 24 Sept 2019 | View |
| KERGORD ROAD ALIGNMENTSuperseded Drawing · PDF | 24 Sept 2019 | View |
| SANDWATER ROAD ALIGNMENTDrawing · PDF | 24 Sept 2019 | View |
| CONSENTED SITE LAYOUT ADVANCED WORKSDrawing · PDF | 24 Sept 2019 | View |
| CONSENTED SITE LAYOUT ADVANCED WORKSDrawing | 24 Sept 2019 | View |
| SANDWATER ROAD ALIGNMENTDrawing · PDF | 24 Sept 2019 | View |
| KERGORD ROAD ALIGNMENTDrawing · PDF | 24 Sept 2019 | View |
| SIGNAGEDrawing · PDF | 24 Sept 2019 | View |
| SIGNAGE ENTRANCESuperseded Drawing · PDF | 24 Sept 2019 | View |
| ROAD AGREEMENTDrawing · PDF | 24 Sept 2019 | View |
| PUBLIC HIGHWAY SPEED LIMITSSupporting Documents · PDF | 24 Sept 2019 | View |
| TRAFFIC MANAGEMENT PLANSupporting Documents · PDF | 24 Sept 2019 | View |
| HGV MOVEMENTSSupporting Documents | 24 Sept 2019 | View |
| CONSTRUCTION AND AIL TRAFFIC ROUTESSupporting Documents | 24 Sept 2019 | View |
| COVERING E MAIL TO DISCHARGE CONDITION 17Correspondence · PDF | 24 Sept 2019 | View |
| EMAIL TO DISCHARGE CONDITION 13Discharge of Condition(s) · PDF | 17 Sept 2019 | View |
| EMAIL TO DISCHARGE CONDITION 13Discharge of Condition(s) · PDF | 17 Sept 2019 | View |
| EMAIL FROM SNH REQUESTING EXTENSION OF TIME - 16.9.2019 11.25Correspondence · PDF | 16 Sept 2019 | View |
| EMAIL FROM SNH REQUESTING EXTENSION OF TIME - 16.9.2019 11.25Correspondence · PDF | 16 Sept 2019 | View |
| EMAIL TO SNH AGREEING TO EXTENSION OF TIME TO 16.10.2019 - 16.9.2019 14.49Correspondence · PDF | 16 Sept 2019 | View |
| EMAIL TO SNH AGREEING TO EXTENSION OF TIME TO 16.10.2019 - 16.9.2019 14.49Correspondence · PDF | 16 Sept 2019 | View |
| CONSULTATION RESPONSE - MARINE SCOTLAND SCIENCEConsultee Comment · PDF | 16 Sept 2019 | View |
| CONSULTATION RESPONSE - MARINE SCOTLAND SCIENCEConsultee Comment · PDF | 16 Sept 2019 | View |
| CONSULTATION RESPONSE - DRAINAGEConsultee Comment · PDF | 13 Sept 2019 | View |
| CONSULTATION RESPONSE - DRAINAGEConsultee Comment · PDF | 13 Sept 2019 | View |
| [EXTERNAL] RE: VIKING WQMPDischarge of Condition(s) · PDF | 12 Sept 2019 | View |
| [EXTERNAL] RE: VIKING ENERGY PARTNERSHIP - CONSULTATION - WATER QUALITYDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| [EXTERNAL] RE: VIKING ENERGY PARTNERSHIP - CONSULTATION - WATER QUALITYDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| [EXTERNAL] RE: VIKING ENERGY WIND FARM - MEETING AGENDA (17TH JUNE) &Discharge of Condition(s) · PDF | 11 Sept 2019 | View |
| [EXTERNAL] RE: VIKING ENERGY WIND FARM - MEETING AGENDA (17TH JUNE) &Discharge of Condition(s) · PDF | 11 Sept 2019 | View |
| [EXTERNAL] RE: VIKING ENERGY WIND FARM - MEETING AGENDA (17TH JUNE) &Discharge of Condition(s) · PDF | 11 Sept 2019 | View |
| [EXTERNAL] RE: VIKING ENERGY WIND FARM - MEETING AGENDA (17TH JUNE) &Discharge of Condition(s) · PDF | 11 Sept 2019 | View |
| [EXTERNAL] RE: VIKING WQMPDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| FIGURE 1_SAMPLING LOCATIONSDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| FIGURE 1_SAMPLING LOCATIONSDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| VIKING WIND FARM-WQMPDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| VIKING WIND FARM-WQMPDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| EMAIL RE KERGORD ROAD (2018/096/PPF)- CONDITION 9 - WQMPDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| EMAIL RE KERGORD ROAD (2018/096/PPF)- CONDITION 9 - WQMPDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| [EXTERNAL] RE: VIKING ENERGY WIND FARM - PLANNING CONSENT COND. NO. 4 (CEMP)Discharge of Condition(s) · PDF | 11 Sept 2019 | View |
| [EXTERNAL] RE: VIKING ENERGY WIND FARM - PLANNING CONSENT COND. NO. 4 (CEMP)Discharge of Condition(s) · PDF | 11 Sept 2019 | View |
| [EXTERNAL] RE: VIKING WIND FARM - PLANNING CONSENT COND. NO. 4 (CONSTRUCTIONDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| [EXTERNAL] RE: VIKING WIND FARM - PLANNING CONSENT COND. NO. 4 (CONSTRUCTIONDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| [EXTERNAL] VIKING WIND FARM - PLANNING CONSENT CONDITION NO. 4 (CONSTRUCTIONDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| [EXTERNAL] VIKING WIND FARM - PLANNING CONSENT CONDITION NO. 4 (CONSTRUCTIONDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| CEMP_FIG.2.1SITELOCDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| CEMP_FIG.2.1SITELOCDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| CEMP_FIG.9.1A_CHABITATSDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| CEMP_FIG.9.1A_CHABITATSDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| CEMP_FIG.10.1ARCHAEOLOGYDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| CEMP_FIG.10.1ARCHAEOLOGYDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| CONDITION 6 & 7 CEMP COVER LETTERDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| CONDITION 6 & 7 CEMP COVER LETTERDischarge of Condition(s) · PDF | 11 Sept 2019 | View |
| VIKING_CEMP_V1.1Discharge of Condition(s) · PDF | 11 Sept 2019 | View |
| VIKING_CEMP_V1.1Discharge of Condition(s) · PDF | 11 Sept 2019 | View |
| CEMP_APPENDIX 2.1_SCHEDULE OF MITIGATIONDischarge of Condition(s) | 11 Sept 2019 | View |
| CEMP_APPENDIX 2.1_SCHEDULE OF MITIGATIONDischarge of Condition(s) | 11 Sept 2019 | View |
| CEMP_APPENDIX 13.1_INDICATIVE CONSTRUCTION PROGRAMMEDischarge of Condition(s) | 11 Sept 2019 | View |
| CEMP_APPENDIX 13.1_INDICATIVE CONSTRUCTION PROGRAMMEDischarge of Condition(s) | 11 Sept 2019 | View |
| EMAIL RE KERGORD ROAD (2018096PPF)- CONDITION 6&7Discharge of Condition(s) · PDF | 11 Sept 2019 | View |
| EMAIL RE KERGORD ROAD (2018096PPF)- CONDITION 6&7Discharge of Condition(s) · PDF | 11 Sept 2019 | View |
| APPENDIX A - PMPDischarge of Condition(s) · PDF | 6 Sept 2019 | View |
| APPENDIX B - PMPDischarge of Condition(s) · PDF | 6 Sept 2019 | View |
| EMAIL RE CONDITION 6 PEAT MANAGEMENT PLANDischarge of Condition(s) · PDF | 6 Sept 2019 | View |
| FIGURE 1 - PMPDischarge of Condition(s) · PDF | 6 Sept 2019 | View |
| FIGURE 2 - PMPDischarge of Condition(s) · PDF | 6 Sept 2019 | View |
| FIGURE 3 - PMPDischarge of Condition(s) · PDF | 6 Sept 2019 | View |
| FIGURE 4A - PMPDischarge of Condition(s) · PDF | 6 Sept 2019 | View |
| FIGURE 4B - PMPDischarge of Condition(s) · PDF | 6 Sept 2019 | View |
| PEAT MANAGEMENT PLANDischarge of Condition(s) | 6 Sept 2019 | View |
| APPENDIX A - PMPDischarge of Condition(s) · PDF | 6 Sept 2019 | View |
| APPENDIX B - PMPDischarge of Condition(s) · PDF | 6 Sept 2019 | View |
| FIGURE 1 - PMPDischarge of Condition(s) · PDF | 6 Sept 2019 | View |
| FIGURE 2 - PMPDischarge of Condition(s) · PDF | 6 Sept 2019 | View |
| FIGURE 3 - PMPDischarge of Condition(s) · PDF | 6 Sept 2019 | View |
| FIGURE 4A - PMPDischarge of Condition(s) · PDF | 6 Sept 2019 | View |
| FIGURE 4B - PMPDischarge of Condition(s) · PDF | 6 Sept 2019 | View |
| PEAT MANAGEMENT PLANDischarge of Condition(s) | 6 Sept 2019 | View |
| DISCHARGE CONDITION 15 ECOWDischarge of Condition(s) · PDF | 31 Jul 2019 | View |
| DISCHARGE OF CONDITION 15 - EMAIL 31.7.2019 15.29Decision · PDF | 31 Jul 2019 | View |
| CONSULTATION RESPONSE - SEPAConsultee Comment · PDF | 22 Jul 2019 | View |
| CONSULTATION RESPONSE - SEPAConsultee Comment · PDF | 22 Jul 2019 | View |
| CONSULTEE COMMENT - SNHConsultee Comment · PDF | 19 Jul 2019 | View |
| CONSULTEE COMMENT - SNHConsultee Comment · PDF | 19 Jul 2019 | View |
| EMAIL REQUEST TO DISCHARGE CONDITIONSDischarge of Condition(s) · PDF | 9 Jul 2019 | View |
| WRITTEN SCHEME OF INVESTIGATION- VIKING WIND FARMSuperseded Supporting Documents | 9 Jul 2019 | View |
| WSI- REGIONAL ARCHEAOLOGIST COMMENTSDischarge of Condition(s) · PDF | 9 Jul 2019 | View |
| EMAIL RE DISCHARGING CONDITIONSDischarge of Condition(s) · PDF | 9 Jul 2019 | View |
| WRITTEN SCHEME OF INVESTIGATION- VIKING WIND FARMDischarge of Condition(s) | 9 Jul 2019 | View |
| WSI- REGIONAL ARCHEAOLOGIST COMMENTSDischarge of Condition(s) · PDF | 9 Jul 2019 | View |
| APPENDIX 1- MBEC- ANDY MCKENZIE CVDischarge of Condition(s) · PDF | 9 Jul 2019 | View |
| EMAIL KERGORD ROAD- CONDITION DISCHARGE ECOWDischarge of Condition(s) · PDF | 9 Jul 2019 | View |
| ECOW COVER LETTERDischarge of Condition(s) · PDF | 9 Jul 2019 | View |
| APPENDIX 1- MBEC- ANDY MCKENZIE CVDischarge of Condition(s) · PDF | 9 Jul 2019 | View |
| EMAIL KERGORD ROAD- CONDITION DISCHARGE ECOWDischarge of Condition(s) · PDF | 9 Jul 2019 | View |
| KERGORD ROAD- ECOW COVER LETTERDischarge of Condition(s) · PDF | 9 Jul 2019 | View |
| DECISION NOTICEDecision · PDF | 29 Apr 2019 | View |
| ROAD ALIGNMENTApproved Plans · PDF | 29 Apr 2019 | View |
| PLAN AND PROFILE 1 OF 7Approved Plans · PDF | 29 Apr 2019 | View |
| PLAN AND PROFILE 2 OF 7Approved Plans · PDF | 29 Apr 2019 | View |
| PLAN AND PROFILE 3 OF 7Approved Plans · PDF | 29 Apr 2019 | View |
| PLAN AND PROFILE 4 OF 7Approved Plans · PDF | 29 Apr 2019 | View |
| PLAN AND PROFILE 5 OF 7Approved Plans · PDF | 29 Apr 2019 | View |
| PLAN AND PROFILE 6 OF 7Approved Plans · PDF | 29 Apr 2019 | View |
| LOCATION PLANApproved Plans · PDF | 29 Apr 2019 | View |
| TYPICAL CROSS SECTIONSApproved Plans · PDF | 29 Apr 2019 | View |
| TYPICAL CROSS SECTIONApproved Plans · PDF | 29 Apr 2019 | View |
| APPENDIX 2 TO 15.4.2019 PLANNING COMMITTEE REPORTCommittee Report · PDF | 8 Apr 2019 | View |
| APPENDIX 3 TO 15.4.2019 PLANNING COMMITTEE REPORTCommittee Report | 8 Apr 2019 | View |
| APPENDIX 4 TO 15.4.2019 PLANNING COMMITTE REPORTCommittee Report · PDF | 8 Apr 2019 | View |
| APPLICANT/AGENT INVITE TO 15.4.2019 PLANNING COMMITTEECorrespondence · PDF | 8 Apr 2019 | View |
| EMAIL TO AGENT - 8.4.2019 16.52Correspondence · PDF | 8 Apr 2019 | View |
| SUSTAINABLE SHETLAND INVITE TO 15.4.2019 PLANNING COMMITTEECorrespondence · PDF | 8 Apr 2019 | View |
| J & E MORRISON INVITE TO 15.4.2019 PLANNING COMMITTEECorrespondence · PDF | 8 Apr 2019 | View |
| 15.4.2019 PLANNING COMMITTEE REPORTCommittee Report · PDF | 8 Apr 2019 | View |
| APPENDIX 1 TO 15.4.2019 PLANNING COMMITTEE REPORTCommittee Report · PDF | 8 Apr 2019 | View |
| CORRESPONDENCE FROM TWW CCCorrespondence · PDF | 20 Feb 2019 | View |
| EMAIL TO CLERK TO COMMUNITY COUNCIL - 22.1.2019 11.28Correspondence · PDF | 22 Jan 2019 | View |
| CONSULTATION RESPONSE - SNHConsultee Comment · PDF | 18 Jan 2019 | View |
| EMAIL TO SNH QUERYING CLASS 1 AND CLASS 2 CARBON RICH SOIL ETC CONSIDERATION INCorrespondence · PDF | 14 Jan 2019 | View |
| CONSULTATION RESPONSE - SEPAConsultee Comment · PDF | 10 Jan 2019 | View |
| EMAIL TO APPLICANT FOLLOWING UP ON WHEREABOUTS OF AMENDED PLANS FOR V1, REV 1 PECorrespondence · PDF | 6 Dec 2018 | View |
| NHO RESPONSE (VEWF COMMENTS)Consultee Comment · PDF | 5 Dec 2018 | View |
| RESPONSE TO RSPB COMMENTSCorrespondence · PDF | 4 Dec 2018 | View |
| EMAIL TO APPLICANT REGARDING APPARENT CHANGE IN SITE BOUNDARY - 27.11.2018 11.1Correspondence · PDF | 27 Nov 2018 | View |
| EMAIL FROM APPLICANT ADVISING SITE BOUNDARY CHANGE MADE IN ERROR - 27.11.2018 1Correspondence · PDF | 27 Nov 2018 | View |
| EMAIL FROM APPLICANT: RESPONSE TO SEPA OBJECTION - 26.11.2018 15.34Correspondence · PDF | 26 Nov 2018 | View |
| APPLICANT REPONSE TO SEPA OBJECTIONSupporting Documents · PDF | 26 Nov 2018 | View |
| PEAT MANAGEMENT PLAN NOV 2018Supporting Documents · PDF | 26 Nov 2018 | View |
| FIGURE 1 KERGORD TRACK ALIGNMENTDrawing · PDF | 26 Nov 2018 | View |
| FIGURE 2 KERGORD TRACK ALIGNMENTDrawing · PDF | 26 Nov 2018 | View |
| EXCAVATED PEAT VOLUMESDrawing · PDF | 26 Nov 2018 | View |
| EXCAVATED AND FLOATING ROAD PEAT VOLUMESDrawing · PDF | 26 Nov 2018 | View |
| PEAT CONTOUR PLAN KERGORD SSEDrawing · PDF | 26 Nov 2018 | View |
| PEAT CONTOUR PLAN KERGORD SSEDrawing · PDF | 26 Nov 2018 | View |
| SCHEMATIC RESTORATION PROFILESDrawing · PDF | 26 Nov 2018 | View |
| EMAIL TO AGENT I NOVEMBER RE INFORMATIONCorrespondence · PDF | 7 Nov 2018 | View |
| CONSULTATION RESPONSE - CCConsultee Comment · PDF | 31 Oct 2018 | View |
| CONSULTATION RESPONSE - NHOConsultee Comment | 19 Oct 2018 | View |
| CONSULTATION RESPONSE - SEPAConsultee Comment · PDF | 12 Oct 2018 | View |
| EMAIL TO APPLICANT ACKNOWLEDGIING RECEIPT OF SUPPORTING INFORMATION - 4.10.2018Correspondence · PDF | 4 Oct 2018 | View |
| EMAIL FROM APPLICANT PROVIDING FURTHER INFORMATION - 2.10.2018 16.48Correspondence · PDF | 2 Oct 2018 | View |
| SUPPORTING INFORMATION SUBMITTED BY APPLICANT IN RESPONSE TO SEPA OBJECTIONSupporting Documents · PDF | 2 Oct 2018 | View |
| CORRESPONDENCE FROM TWW COMMUNITY COUNCILCorrespondence · PDF | 26 Sept 2018 | View |
| ROADS CONSULTATION RESPONSEConsultee Comment | 11 Sept 2018 | View |
| CONSULTATION RESPONSE - RSPBConsultee Comment · PDF | 16 Aug 2018 | View |
| CONSULTATION RESPONSE - SEPAConsultee Comment · PDF | 30 Jul 2018 | View |
| CONSULTEE REQUEST - MORE TIME AND ACKCorrespondence · PDF | 20 Jul 2018 | View |
| CONSULTEE REQUEST - MORE TIME AND ACKCorrespondence · PDF | 20 Jul 2018 | View |
| REPRESENTATIONRepresentation · PDF | 18 Jul 2018 | View |
| REPRESENTATIONRepresentation · PDF | 17 Jul 2018 | View |
| CONSULTATION RESPONSE - OUTDOOR ACCESSConsultee Comment · PDF | 16 Jul 2018 | View |
| CONSULTATION RESPONSE - SCOTTISH WATERConsultee Comment · PDF | 16 Jul 2018 | View |
| CONSULTATION RESPONSE - SHETLAND ARCHAEOLOGYConsultee Comment · PDF | 12 Jul 2018 | View |
| CONSULTEE COMMENT - DRAINAGE/FLOODConsultee Comment · PDF | 11 Jul 2018 | View |
| CONSULTATION RESPONSE - SNHConsultee Comment · PDF | 11 Jul 2018 | View |
| SCREENING LETTERCorrespondence · PDF | 6 Jul 2018 | View |
| SCREENING EMAILCorrespondence · PDF | 6 Jul 2018 | View |
| LOCATION PLANSuperseded Drawing · PDF | 18 Jun 2018 | View |
| TYPICAL CROSS SECTIONSuperseded Drawing · PDF | 18 Jun 2018 | View |
| CROSS SECTIONSuperseded Drawing · PDF | 18 Jun 2018 | View |
| DRAWING ISSUE SHEETOther · PDF | 18 Jun 2018 | View |
| DRAWING ISSUE SHEETOther · PDF | 18 Jun 2018 | View |
| OVERVIEW PLANDrawing · PDF | 7 May 2018 | View |
| APPLICATION FORMApplication Form · PDF | 17 Apr 2018 | View |
| ENVIRONMENTAL APPRAISAL FIGURES PART 1 OF 2Drawing · PDF | 17 Apr 2018 | View |
| ENVIRONMENTAL APPRAISAL FIGURES PART 2 OF 2Drawing · PDF | 17 Apr 2018 | View |
| ENVIRONMENTAL APPRAISAL REPORT PART 1 OF 3Drawing · PDF | 17 Apr 2018 | View |
| APP F BASELINE BIRD SURVEYSDrawing · PDF | 17 Apr 2018 | View |
| APP K PEAT MANAGEMENT PLANDrawing · PDF | 17 Apr 2018 | View |
| PREVIOUSLY SUBMITTED APPLICATION FORM THAT SHOWS THAT THIS APPLICATION IS MATERIOther · PDF | 17 Apr 2018 | View |
| SUPPORTING OUTLINE PLANNING STATEMENTDrawing · PDF | 17 Apr 2018 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.