England · Local authority

Sheffield planning applications

PlanningTrack collects planning applications and decisions from the public planning register of Sheffield City Council. Search an address, application reference or proposal. Official Sheffield website

Collected application statistics

Collected records · All available dates
1,917Searchable applications
714Recorded as pending
88%Approval rate · 931 approved or refused records
115Refused applications

816 approved · 115 refused · 19 withdrawn. Received dates in our records: 1 Jan 1975 to 19 Nov 2026. Most recent record check: 27 Nov 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas32 mapped area records
Article 4 direction areas1 mapped area records1 identified HMO area records; remaining records unclassified

Council maps may include boundaries missing from our collection.

Open Sheffield council Article 4 map

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Sheffield City Council HMO Article 4 boundary · checked 14 Sept 2026 · Open Government Licence v3.0.

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. Decided26/02707/CDPN

    Conversion of commercial building (Use Class E) to 73no residential apartments (Use Class C3)

    CMS South Quay 1 Wharf Street Victoria Quays Sheffield S2 5SY

    Received 11 Sept 2026
  2. Decided26/02708/FUL

    Alterations including installation of rooflights, replacement and additional windows, installation of 'airbrick' vents, erection of bin store and cycle storage and landscaping works

    CMS South Quay 1 Wharf Street Victoria Quays Sheffield S2 5SY

    Received 11 Sept 2026
  3. Awaiting decision26/02710/FUL

    Demolition of existing buildings and erection of 6 new buildings for Business (Use Class E(g)) and/or General Industrial (Use Class B2) and/or Storage/Distribution (Use Class B8) along with pedestrian and vehicular access, parking, boundary treatments, servicing areas, landscaping, attenuation pond and associated works (Application under Section 73 to vary condition numbers: 2 (Approved Plans), 3 (Tree Protection), 4 (Vehicular Ingress/Egress), 5 (Site Accommodation), 6 (Vehicle Cleaning), 7 (Construction Environmental Management Plan (CEMP)), 8 (Protection of Public Sewerage Infrastructure), 9 (Biodiversity Management Plan (BMP)), 10 (Written Scheme of Investigation (WSI)), 11 (Employment & Development Plan), 14 (Energy), 15 (Green/Biodiverse Roofs (GBR)), 18 (Boundary Fencing), 28 (Night Time Use), 30 (Drainage System), 31 (Footway/Cycle Path), 32 (Landscaping), 33 (Ecological Mitigation Measures), 36 (Industrial Processes), 38 (Audible Reversing Warning System), 39 (Waste Sorting), 40 (Commercial Deliveries) & 41 (Use of Units 6A / 6B) imposed by planning permission 23/01782/FUL)

    Land To South Of Holbrook Avenue And North Of Station Road, Halfway Sheffield S20 3GH

    Received 11 Sept 2026
  4. Decided26/02711/ADV

    Two non-illuminated fascia signs

    942 City Road Sheffield S2 1GQ

    Received 11 Sept 2026
  5. Decided26/02712/FUL

    Overcladding of existing metal roof with new insulated metal cladding system, installation of new GRP roof light cladding sheets to match existing, raising the overall ridge height, recoating of existing wall cladding to improve external appearance

    Tam Hangers (UK) Reuse Ltd Part A Unit 2 Provincial Park Nether Lane Sheffield S35 9ZX

    Received 11 Sept 2026
  6. Awaiting decision23/01782/COND3

    Application to approve details in relation to condition number(s): 3 (Tree Protection), 7 (Construction Environmental Management Plan (CEMP), 9 (Biodiversity Management Plan (BMP)), 10 (Written Scheme of Investigation) and 14 (Energy) imposed by planning permission 23/01782/FUL

    Land To South Of Holbrook Avenue And North Of Station Road, Halfway Sheffield S20 3GH

    Received 11 Sept 2026
  7. Decided26/02714/LD2

    Application for a Lawful Development Certificate for alterations to roof of dwellinghouse including erection of rear dormer extension, rooflights to front, removal of chimney and erection of flue to rear (Application under Section 192)

    47 Cliffefield Road Sheffield S8 9DJ

    Received 11 Sept 2026
  8. Decided26/02716/LD2

    Application for a Lawful Development Certificate for the erection of single-storey rear and side extensions to dwellinghouse (Application under Section 192)

    61 Mason Crescent Sheffield S13 8LJ

    Received 11 Sept 2026
  9. Decided26/02717/FUL

    Infill of carport and erection of front/side single-storey extension, demolition of existing rear extension, erection of single-storey rear extension, and rendering of dwellinghouse

    10 Thurstan Avenue Sheffield S8 7BR

    Received 14 Sept 2026
  10. Decided26/02718/FUL

    Erection of raised single-storey rear extension to dwellinghouse

    7 Kenbourne Grove Sheffield S7 1NH

    Received 14 Sept 2026
  11. Awaiting decision26/02719/FUL

    Change of use to first floor to a residential flat (Use Class C3) and demolition of existing rear extension and erection of a part two-storey part single-storey rear extension, provision of a new pedestrian gateway to highway footpath and relocation of front door

    Canton King 200 Middlewood Road Sheffield S6 1TD

    Received 14 Sept 2026
  12. Decided26/02720/FUL

    Erection of single-storey side and front extension to dwellinghouse

    6 Brook Green Sheffield S12 4NR

    Received 14 Sept 2026
  13. Decided26/00510/COND2

    Application to approve details in relation to condition number(s): 12 (Highway Improvements) imposed by planning permission 26/00510/FUL

    Land Between 7 And 11 Cowley Way Sheffield S35 1QP

    Received 14 Sept 2026
  14. Awaiting decision26/02724/FUL

    Demolition of garage, erection of single-storey front and side extension and porch to front of dwellinghouse

    312 Derbyshire Lane Sheffield S8 8SF

    Received 14 Sept 2026
  15. Decided26/02725/FUL

    Demolition of rear conservatory and erection of two/single-storey rear extension to dwellinghouse

    35 - 37 South Street Mosborough Sheffield S20 5DE

    Received 14 Sept 2026
  16. Awaiting decision26/02726/FUL

    Erection of three-storey care facility (Use Class C2) with associated parking

    Site Of Former Leo House 16A Collegiate Crescent Sheffield S10 2BA

    Received 14 Sept 2026
  17. Awaiting decision26/02727/FUL

    Erection of 9 dwellings, formation of site access, associated parking and landscaping works (Application under Section 73 to vary condition 2. (Approved Plans), 6. (Hard/Soft Landscape Scheme) and 13. (Car Parking Accommodation) imposed by planning permission 22/04181/FUL)

    Land To The East Of The Junction With School Street Station Road Mosborough Sheffield S20 5AD

    Received 14 Sept 2026
  18. Decided26/02728/TPO

    Removal of tree (tree Preservation Order No. 808/237a) (T10)

    2 James Walton Place Sheffield S20 3GP

    Received 14 Sept 2026
  19. Decided26/02729/TPO

    Pruning of tree (Tree Preservation Order TPO No. 808/269)

    14 Blue Ridge Close Sheffield S17 3JU

    Received 14 Sept 2026
  20. Decided25/00570/COND1

    Application to approve details in relation to condition numbers: 3. (Surface Water Drainage) 4. (Sewer Line) 5. (Phase I Preliminary Risk Assessment report) 6. (Phase II Intrusive Site Investigation Report ) 7. (Remediation Strategy Report) 8. (Sound Insulation) 11. (External Materials) 12. (Surface Water) & 14. (Foul/Water Drainage) relating to planning permission 25/00570/FUL

    14 Boswell Close Sheffield S35 4FD

    Received 14 Sept 2026
  21. Decided24/00463/COND2

    Application to approve details in relation to condition number 3. (surface water drainage) of planning permission 24/00463/FUL

    Land Adjacent No 36 Charnock Drive Sheffield S12 3HD

    Received 14 Sept 2026
  22. Awaiting decision26/02732/TCA

    Pruning and removal of trees (Nether Edge Conservation Area)

    32 Cavendish Road Sheffield S11 9BH

    Received 15 Sept 2026
  23. Decided26/02735/TCA

    Removal of tree (Nether Edge Conservation Area)

    120 Union Road Sheffield S11 9EN

    Received 15 Sept 2026
  24. Awaiting decision26/02736/FUL

    Installation of air source heat pump

    Abbeyfield Primary Academy Orphanage Road Sheffield S3 9AN

    Received 15 Sept 2026

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Get emailed about new planning applications in Sheffield

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in Sheffield City Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Sheffield City Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage