Council planning record

Alterations to allow use of part of the equestrian building as an internal padel court, and formation of external padel court (Application under Section 73 to vary condition no(s) 2 (approved plans) and 11 (opening hours) and remove/discharge condition no(s) 3 (Habitat Management and Monitoring Plan (HMMP)), 4 (hard/soft landscaping), 5 (external materials/finishes), and 7 (cycle parking); as imposed by planning permission 26/00635/FUL)

Moorwood Farm Long Lane Dungworth Sheffield S6 6GR

DecidedReference: 26/01581/FULSheffield City Council

Last published check: 28 Sept 2026, 16:53. Check the council record for more recent changes.

Application location

Moorwood Farm Long Lane Dungworth Sheffield S6 6GR

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Planning Application
Received
28 May 2026
Validated
28 May 2026
Determination deadline
23 Jul 2026
Local authority
Sheffield City Council

Application overview

Alterations to allow use of part of the equestrian building as an internal padel court, and formation of external padel court (Application under Section 73 to vary condition no(s) 2 (approved plans) and 11 (opening hours) and remove/discharge condition no(s) 3 (Habitat Management and Monitoring Plan (HMMP)), 4 (hard/soft landscaping), 5 (external materials/finishes), and 7 (cycle parking); as imposed by planning permission 26/00635/FUL)

Proposal details

Reference
26/01581/FUL
Alternative references
PP-14966619
Ward
Stannington
Parish
Bradfield Parish Council
Agent
Planning And Design Practice Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 21 of 21

DocumentPublishedAction
Decision NoticeDecision Notice · PDF8 Sept 2026View
Delegated Officer ReportDelegated Officer Report · PDF8 Sept 2026View
Site noticePhotographs · PDF7 Sept 2026View
Amended hmmp and bgp 24.07.26Application Other · PDF7 Sept 2026View
Agent correspondence ( planting and surfacing) 16.07.26Application Other · PDF7 Sept 2026View
Amended site plan 24.07.26Application (Amended Drawings) · PDF7 Sept 2026View
Amended agent cover letter 27.07.26Application Other · PDF7 Sept 2026View
Neighbour Notification DetailsNeighbour Notification Details · PDF4 Jun 2026View
ApplicationformredactedApplication Form · PDF28 May 2026View
Ufm33_gc_fulApplication Other · PDF28 May 2026View
5748_001_site location planLocation plan · PDF28 May 2026View
5748_005_proposed site plan - revfBlock plan · PDF28 May 2026View
5748_006_proposed floor plans - revdApplication (Drawings) · PDF28 May 2026View
5748_007_proposed elevations - reveApplication (Drawings) · PDF28 May 2026View
5748_008_proposed site plan_trees_revcBlock plan · PDF28 May 2026View
Standard padel foundationApplication (Drawings) · PDF28 May 2026View
5748_01_s73 cover letterApplication Other · PDF28 May 2026View
Tt4490-moorwood farm-r01-pea rev00Ecology documentation · PDF28 May 2026View
Tt4490-moorwood farm-r02-hmmp rev01Ecology documentation · PDF28 May 2026View
Bng0001Ecology documentation · PDF28 May 2026View
Bng metricEcology documentation28 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision Issued Date

    Published milestoneCouncil source
  9. Decision Made Date

    Published milestoneCouncil source
  10. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Grant Conditionally
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.