Temporary use of land for construction-related parking, together with temporary surfacing works comprising geotextile membrane, Cellweb cellular confinement system and recycled aggregate, required in connection with and for the duration of the permitted development works at Longwood, with the land to be reinstated to grass following completion of those works.The provision of temporary construction-related parking works comprising a geotextile membrane, Cellweb cellular confinement system and removable recycled aggregate surface, required temporarily in connection with and for the duration of the permitted redevelopment operations at Longwood, with all materials to be removed and the land reinstated to grass upon completion of those works.
Land North Of One Tree Cottage Carters Hill Underriver Kent
Temporary use of land for construction-related parking, together with temporary surfacing works comprising geotextile membrane, Cellweb cellular confinement system and recycled aggregate, required in connection with and for the duration of the permitted development works at Longwood, with the land to be reinstated to grass following completion of those works.The provision of temporary construction-related parking works comprising a geotextile membrane, Cellweb cellular confinement system and removable recycled aggregate surface, required temporarily in connection with and for the duration of the permitted redevelopment operations at Longwood, with all materials to be removed and the land reinstated to grass upon completion of those works.
Reference
26/02649/LDCPR
Ward
Seal & Weald
Parish
Seal
Agent
Dames A+P
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.