Council planning record

New 33kV tee off, The Ferry Terminal Colintraive

Address not published

ConsentedReference: ECU00006460Scottish Ministers

Application location

Address not published

This record has no verified map location.

Application summary

Status
Consented
Application type
Development
Received
14 Aug 2026
Validated
Not published
Determination deadline
Not published
Local authority
Scottish Ministers

Application overview

SSEN proposes the construction of a new 33kV overhead line to increase the capacity required to facilitate electric ferry chargers at Colintraive Ferry Terminal. The new 33kV overhead line spur will come from pole 143 of the Clachaig Village circuit. The overhead line will consist of 2 single poles, 2 double poles and 3 span of 33kV conductor. The total length of the overhead line will be 30m. The poles will house our plant equipment and a number of these will also have stay wires attached. The poles will be 11m in height.

Proposal details

Reference
ECU00006460
Alternative references
FBS 754
Development type
Overhead Power Line (Non-EIA)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 14 of 14

DocumentPublishedAction
Application - Historic Environment Scotland Consultation Response - 28 September 2026 - The Ferry Terminal ColintriaveConsultation Responses6 Oct 2026View
Decision LetterDeterminations6 Oct 2026View
Ecology SurveyApplication Documents31 Aug 2026View
Email from APP to confirm question 3 of simplified notificationApplication Documents31 Aug 2026View
Form 1Application Documents31 Aug 2026View
MOD Consultation ResponseConsultation Responses6 Oct 2026View
NatureScot ConsultationApplication Documents31 Aug 2026View
OS MapApplication Documents31 Aug 2026View
Plan of Works MapApplication Documents31 Aug 2026View
Point of Connection MapApplication Documents31 Aug 2026View
Prestwick Airport ConsultationApplication Documents31 Aug 2026View
Screening DeterminationApplication Documents31 Aug 2026View
Site Location MapApplication Documents31 Aug 2026View
WoSAS ConsultationApplication Documents31 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application received

    Published milestoneCouncil source
  2. Application determined

    Published milestoneCouncil source

Decision & conditions

Consented
Decision Letter Screening Determination
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.