Council planning record

Charleston Energy Park

Address not published

ApplicationReference: ECU00005190Scottish Ministers

We couldn’t update every section. Some information is from an earlier collection.

Application location

Address not published

This record has no verified map location.

Application summary

Status
Application
Application type
Development
Received
29 Sept 2026
Validated
Not published
Determination deadline
Not published
Local authority
Scottish Ministers

Application overview

The Proposed Development will consist of five wind turbines (up to 180 m tip height), battery energy storage, access tracks, and associated infrastructure.

Proposal details

Reference
ECU00005190
Alternative references
73203
Development type
Wind Farm (Generating station of >50 < 100 MW Capacity )
Agent
Atmos Consulting

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 200 of 200

DocumentPublishedAction
73203 Charleston Energy Park - Scoping Report FinalScoping Documents4 Sept 2024View
73203_Figure 1_SL_011b_Site LocationScoping Documents23 Aug 2024View
73203_Figure 10_AV_036a Aviation and Telecommunication ConstraintsScoping Documents23 Aug 2024View
73203_Figure 2_CP_037a_Designated Sites within 20kmScoping Documents23 Aug 2024View
73203_Figure 3_SL_005f_Site LayoutScoping Documents23 Aug 2024View
73203_Figure 4_LS_016c_Cumulative Sites within 45kmScoping Documents23 Aug 2024View
73203_Figure 5_ZV_013c_Blade Tip ZTV and Landscape Designations - 45kmScoping Documents23 Aug 2024View
73203_Figure 6_LS_038a_Landscape CharacterScoping Documents23 Aug 2024View
73203_Figure 7_CP_033a_Designated Heritage Assets within the 10km Study AreaScoping Documents23 Aug 2024View
73203_Figure 8_CP_035a_Bare Earth Zone of Theoretical Visibility to 10km with Heritage AssetsScoping Documents3 Sept 2024View
73203_Figure 9_GY_024a_Interpolated Peat DepthScoping Documents23 Aug 2024View
Application - Aberdeen Airport Consultation ResponseConsultation Responses8 Oct 2026View
Application - Edinburgh Airport Consultation Response - 09 October 2026 - Charleston Energy ParkConsultation Responses9 Oct 2026View
Application - Energy Connect Consultation Response - 05 October 2026 - Charleston Energy ParkConsultation Responses6 Oct 2026View
Application - Fisheries Management Scotland Consultation ResponseConsultation Responses9 Oct 2026View
Application - Glasgow Prestwick Airport Consultation Response - 02nd October 2026Consultation Responses6 Oct 2026View
Application - Health and Safety Executive Consultation Response - 09th October 2026Consultation Responses9 Oct 2026View
Application - NATS Consultation Response - 02nd October 2026Consultation Responses6 Oct 2026View
Application - The Coal Authority Consultation Response - 01 October 2026 - Charleston Energy ParkConsultation Responses6 Oct 2026View
Application - The Met Office Consultation Response - 06th October 2026Consultation Responses6 Oct 2026View
Charleston Energy Park - Cover LetterApplication Documents1 Oct 2026View
Charleston Energy Park - Scoping OpinionScoping20 Dec 2024View
Formal request for Scoping OpinionScoping Documents4 Sept 2024View
Supporting Document - Design and Access StatementApplication Documents1 Oct 2026View
Supporting Document - Grid Connection AppraisalApplication Documents1 Oct 2026View
Supporting Document - Planning StatementApplication Documents1 Oct 2026View
Supporting Document - Pre-Application Consultation Report - Part 1Application Documents1 Oct 2026View
Supporting Document - Pre-Application Consultation Report - Part 2Application Documents1 Oct 2026View
Supporting Document - Pre-Application Consultation Report - Part 3Application Documents1 Oct 2026View
Supporting Document - Socio-Economic, Tourism and Recreation StatementApplication Documents1 Oct 2026View
Volume 1 - Non-Technical SummaryApplication Documents1 Oct 2026View
Volume 2 - Cover and ContentsApplication Documents1 Oct 2026View
Volume 2 Chapter 1 - IntroductionApplication Documents1 Oct 2026View
Volume 2 Chapter 10 - Transport and AccessApplication Documents1 Oct 2026View
Volume 2 Chapter 11 - Climate change and Carbon BalanceApplication Documents1 Oct 2026View
Volume 2 Chapter 12 - Other ConsiderationsApplication Documents1 Oct 2026View
Volume 2 Chapter 13 - Schedule of Mitigations and Summary Residual EffectsApplication Documents1 Oct 2026View
Volume 2 Chapter 2 - Description of Proposed DevelopmentApplication Documents1 Oct 2026View
Volume 2 Chapter 3 - Design Evolution and AlternativesApplication Documents1 Oct 2026View
Volume 2 Chapter 4 - Landscape and Visual AssessmentApplication Documents1 Oct 2026View
Volume 2 Chapter 5 - EcologyApplication Documents1 Oct 2026View
Volume 2 Chapter 6 - OrnithologyApplication Documents1 Oct 2026View
Volume 2 Chapter 7 - Hydrology, Geology and HydrogeologyApplication Documents1 Oct 2026View
Volume 2 Chapter 8 - NoiseApplication Documents1 Oct 2026View
Volume 2 Chapter 9 - Cultural HeritageApplication Documents1 Oct 2026View
Volume 3 - Cover and ContentsApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 10-1 - Abnormal Loads AssessmentApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 1-1 - Scoping OpinionApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 11-1 - New Carbon CalculatorApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 12-1 - Aviation Impact AssessmentApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 12-2 - Aviation Lighting SchemeApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 12-3 - Forestry AssessmentApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 13-1 - Outline Construction Environmental Management PlanApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 2-1 - Borrow Pit AssessmentApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 4-1 - Landscape and Visual Impact Assessment MethodologyApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 4-2 - Visualisation MethodologyApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 4-3 - Extracts from Onshore Wind Energy Supplementary Guidance (OWESG)Application Documents1 Oct 2026View
Volume 3 Technical Appendix 4-4 - Effects on Landscape CharacterApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 4-5 - Effects on ViewpointsApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 4-6 - Effects on Landscape DesignationsApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 4-7 - Residential Visual Amenity Assessment - Part 1Application Documents1 Oct 2026View
Volume 3 Technical Appendix 4-7 - Residential Visual Amenity Assessment - Part 2Application Documents1 Oct 2026View
Volume 3 Technical Appendix 4-7 - Residential Visual Amenity Assessment - Part 3Application Documents1 Oct 2026View
Volume 3 Technical Appendix 4-8 - Aviation Lighting Impact AssessmentApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 4-9 - Cumulative Effects on ViewpointsApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 5-1 - HabitatsApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 5-2 - BatsApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 5-3 - Protected SpeciesApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 5-4 - Fish HabitatApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 5-5 - Biodiversity Net Gain ReportApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 5-6 - Outline Habitat Management PlanApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 5-7 - Marine Directorate ChecklistApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 6-1 - Ornithological Surveys 2023 - 2025 Part 1Application Documents1 Oct 2026View
Volume 3 Technical Appendix 6-1 - Ornithological Surveys 2023 - 2025 Part 2Application Documents1 Oct 2026View
Volume 3 Technical Appendix 6-1 - Ornithological Surveys 2023 - 2025 Part 3Application Documents1 Oct 2026View
Volume 3 Technical Appendix 6-2 - Shadow Habitats Regulations AppraisalApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 6-3 - Confidential Appendix_redactedApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 7-1 - Peat Landslide Hazard Risk Assessment Part 1Application Documents1 Oct 2026View
Volume 3 Technical Appendix 7-1 - Peat Landslide Hazard Risk Assessment Part 2Application Documents1 Oct 2026View
Volume 3 Technical Appendix 7-2 - Outline Peat Management PlanApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 7-3 - Watercourse Crossing AssessmentApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 7-4 Private Water Supply Risk AssessmentApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 7-5 - Ground Water Dependent Terrestrial Ecosystem AssessmentApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 7-6 - Flood Risk Assessment - Part 1Application Documents1 Oct 2026View
Volume 3 Technical Appendix 7-6 - Flood Risk Assessment - Part 2Application Documents1 Oct 2026View
Volume 3 Technical Appendix 7-6 - Flood Risk Assessment - Part 3Application Documents1 Oct 2026View
Volume 3 Technical Appendix 7-6 - Flood Risk Assessment - Part 4Application Documents1 Oct 2026View
Volume 3 Technical Appendix 7-6 - Flood Risk Assessment - Part 5Application Documents1 Oct 2026View
Volume 3 Technical Appendix 7-6 - Flood Risk Assessment - Part 6Application Documents1 Oct 2026View
Volume 3 Technical Appendix 7-6 - Flood Risk Assessment - Part 7Application Documents1 Oct 2026View
Volume 3 Technical Appendix 7-6 - Flood Risk Assessment - Part 8Application Documents1 Oct 2026View
Volume 3 Technical Appendix 7-7 - Battery Energy Storage System Drainage Impact AssessmentApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 7-8 - Fire Water Management PlanApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 8-1 - Assessment Methodology and ConsultationApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 8-2 - Baseline Noise SurveyApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 8-3 - Noise Calculations and PredictionsApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 8-4 - Noise Curtailment StrategyApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 9-1 - Assessment of receptors within 1 km study areaApplication Documents1 Oct 2026View
Volume 3 Technical Appendix 9-2 - Assessment of receptors within 10 km study areaApplication Documents1 Oct 2026View
Volume 4a - Cover and ContentsApplication Documents1 Oct 2026View
Volume 4a Figure 10-1 - Study AreaApplication Documents1 Oct 2026View
Volume 4a Figure 10-2 - Traffic Counter LocationsApplication Documents1 Oct 2026View
Volume 4a Figure 10-3 - Abnormal Loads RouteApplication Documents1 Oct 2026View
Volume 4a Figure 1-1 - Site LocationApplication Documents1 Oct 2026View
Volume 4a Figure 12-1 - Shadow FlickerApplication Documents1 Oct 2026View
Volume 4a Figure 12-2 - Aviation and Telecom ConstraintsApplication Documents1 Oct 2026View
Volume 4a Figure 2-1 - Site LayoutApplication Documents1 Oct 2026View
Volume 4a Figure 2-10 - Indicative Watercourse CrossingsApplication Documents1 Oct 2026View
Volume 4a Figure 2-2 - Site ContextApplication Documents1 Oct 2026View
Volume 4a Figure 2-3 - Cumulative SitesApplication Documents1 Oct 2026View
Volume 4a Figure 2-4 - Indicative TurbineApplication Documents1 Oct 2026View
Volume 4a Figure 2-5 - Indicative Turbine FoundationApplication Documents1 Oct 2026View
Volume 4a Figure 2-6 - Indicative Turbine HardstandingApplication Documents1 Oct 2026View
Volume 4a Figure 2-7 - Indicative Construction Compound and SubstationApplication Documents1 Oct 2026View
Volume 4a Figure 2-8 - Indicative Battery Storage LayoutApplication Documents1 Oct 2026View
Volume 4a Figure 2-9 - Indicative Access Track and Cable TrenchApplication Documents1 Oct 2026View
Volume 4a Figure 3-1 - Detailed Site LayoutApplication Documents1 Oct 2026View
Volume 4a Figure 3-2 - Design EvolutionApplication Documents1 Oct 2026View
Volume 4a Figure 4-1 - Landscape DesignationsApplication Documents1 Oct 2026View
Volume 4a Figure 4-10 - Cumulative Zone of Theoretical Visibility - Operational, Consented, Planning and ScopingApplication Documents1 Oct 2026View
Volume 4a Figure 4-2a - Landscape Character to 45kmApplication Documents1 Oct 2026View
Volume 4a Figure 4-2b - Landscape Character to 15kmApplication Documents1 Oct 2026View
Volume 4a Figure 4-3a - Hub Height Zone of Theoretical Visibility to 45kmApplication Documents1 Oct 2026View
Volume 4a Figure 4-3b - Hub Height Zone of Theoretical Visibility to 20kmApplication Documents1 Oct 2026View
Volume 4a Figure 4-3c - Hub Height Zone of Theoretical Visibility to 10kmApplication Documents1 Oct 2026View
Volume 4a Figure 4-4a - Blade Tip Zone of Theoretical Visibility to 45kmApplication Documents1 Oct 2026View
Volume 4a Figure 4-4b - Blade Tip Zone of Theoretical Visibility to 20kmApplication Documents1 Oct 2026View
Volume 4a Figure 4-4c - Blade Tip Zone of Theoretical Visibility to 10kmApplication Documents1 Oct 2026View
Volume 4a Figure 4-5 - Cumulative Sites within 45kmApplication Documents1 Oct 2026View
Volume 4a Figure 4-6 - Cumulative Sites within 10kmApplication Documents1 Oct 2026View
Volume 4a Figure 4-7 - Cumulative Zone of Theoretical Visibility - OperationalApplication Documents1 Oct 2026View
Volume 4a Figure 4-8 - Cumulative Zone of Theoretical Visibility - Operational and ConsentedApplication Documents1 Oct 2026View
Volume 4a Figure 4-9 - Cumulative Zone of Theoretical Visibility - Operational, Consented and PlanningApplication Documents1 Oct 2026View
Volume 4a Figure 5-1 - Environmental designations to 5kmApplication Documents1 Oct 2026View
Volume 4a Figure 5-2 - Baseline and Future National Vegetation Classification Habitats in Vegetation Assessment AreaApplication Documents1 Oct 2026View
Volume 4a Figure 7-1 - Hydrological OverviewApplication Documents1 Oct 2026View
Volume 4a Figure 7-10 - Potential Ground Water Dependent Terrestrial EcosystemsApplication Documents1 Oct 2026View
Volume 4a Figure 7-11 - Private Water Supply AssessmentApplication Documents1 Oct 2026View
Volume 4a Figure 7-2 - Superficial GeologyApplication Documents1 Oct 2026View
Volume 4a Figure 7-3 - Bedrock GeologyApplication Documents1 Oct 2026View
Volume 4a Figure 7-4 - SoilsApplication Documents1 Oct 2026View
Volume 4a Figure 7-5 - Carbon and Peatland MapApplication Documents1 Oct 2026View
Volume 4a Figure 7-6 - Peat Depth SurveyApplication Documents1 Oct 2026View
Volume 4a Figure 7-7 - Peat Depth InterpolationApplication Documents1 Oct 2026View
Volume 4a Figure 7-8 - Peatland ConditionApplication Documents1 Oct 2026View
Volume 4a Figure 7-9 - HydrogeologyApplication Documents1 Oct 2026View
Volume 4a Figure 8-1 - Site Layout, Receptors and Measurement LocationsApplication Documents1 Oct 2026View
Volume 4a Figure 8-2 - Proposed Development Predicted Noise ContoursApplication Documents1 Oct 2026View
Volume 4a Figure 8-3 - Cumulative Noise ContoursApplication Documents1 Oct 2026View
Volume 4a Figure 9-1 - Site Overview Showing Designated Receptors within 10 km Study AreaApplication Documents1 Oct 2026View
Volume 4a Figure 9-10 - Non-Designated Receptors within 5 km Study AreaApplication Documents1 Oct 2026View
Volume 4a Figure 9-11 - Non-Designated Receptors within 5 km Study AreaApplication Documents1 Oct 2026View
Volume 4a Figure 9-12 - Site Overview with Historic Land-Use Assessment MappingApplication Documents1 Oct 2026View
Volume 4a Figure 9-13 - Site Overview Showing Proposed Development with 1st Edition 6-inch Ordnance Survey MapApplication Documents1 Oct 2026View
Volume 4a Figure 9-14 - Site Overview Showing Proposed Development with 1st Edition 6-inch Ordnance Survey MapApplication Documents1 Oct 2026View
Volume 4a Figure 9-15 - Site Overview Showing Designated Receptors and Zone of Theoretical Visibility MappingApplication Documents1 Oct 2026View
Volume 4a Figure 9-2 - Designated Receptors within 10 km Study AreaApplication Documents1 Oct 2026View
Volume 4a Figure 9-3 - Designated Receptors within 10 km Study AreaApplication Documents1 Oct 2026View
Volume 4a Figure 9-4 - Site Overview Showing non-Designated Receptors within 5 km Study AreaApplication Documents1 Oct 2026View
Volume 4a Figure 9-5 - Non-Designated Receptors within 5 km Study AreaApplication Documents1 Oct 2026View
Volume 4a Figure 9-6 - Non-Designated Receptors within 5 km Study AreaApplication Documents1 Oct 2026View
Volume 4a Figure 9-7 - Non-Designated Receptors within 5 km Study AreaApplication Documents1 Oct 2026View
Volume 4a Figure 9-8 - Non-Designated Receptors within 5 km Study AreaApplication Documents1 Oct 2026View
Volume 4a Figure 9-9 - Non-Designated Receptors within 5 km Study AreaApplication Documents1 Oct 2026View
Volume 4b - Cover and ContentsApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-1 - Viewpoint 1 - Castle of MeyApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-10 - Viewpoint 10 - BarrockApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-11 - Viewpoint 11 - A836, MeyApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-12 - Viewpoint 12 - A836, west of ThursoApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-13 - Viewpoint 13 - BowerApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-14 - Viewpoint 14 - KeissApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-15 - Viewpoint 15 - Ben DorreyApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-16 - Viewpoint 16 - WattenApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-17 - Viewpoint 17 - Noss HeadApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-18 - Viewpoint 18 - John o' GroatsApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-19 - Viewpoint 19 - DunnetApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-2 - Viewpoint 2 - Duncansby HeadApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-20 - Viewpoint 20 - CanisbayApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-21 - Viewpoint 21 - Gills Bay FerryApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-22 - Viewpoint 22 - Burwick, South RonaldsayApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-3 - Viewpoint 3 - A99, Warth HillApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-4 - Viewpoint 4 - BrabsterApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-5 - Viewpoint 5 - LythApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-6 - Viewpoint 6 - LochendApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-7 - Viewpoint 7 - A836, CastletownApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-8 - Viewpoint 8 - A836, Dunnet DunesApplication Documents1 Oct 2026View
Volume 4b Figure 4-11-9 - Viewpoint 9 - Dunnet HeadApplication Documents1 Oct 2026View
Volume 4b Figure 9-16 - Viewpoint CH1a - Castle of Mey (Doorway)Application Documents1 Oct 2026View
Volume 4b Figure 9-17 - Viewpoint CH1b - Castle of Mey (Kitchen Maid's Room)Application Documents1 Oct 2026View
Volume 4b Figure 9-18 - Viewpoint CH1c - Castle of Mey (Tower Top)Application Documents1 Oct 2026View
Volume 4b Figure 9-19 - Viewpoint CH2 - Dunnet Parish Church (LB1888)Application Documents1 Oct 2026View
Volume 4b Figure 9-20 - Viewpoint CH3 - Thompsonfield_ Broch (SM588)Application Documents1 Oct 2026View
Volume 4b Figure 9-21 - Viewpoint CH4 - Freswick Links Viking Settlement (SM2535)Application Documents1 Oct 2026View
Volume 4b Figure 9-22 - Viewpoint CH5 - St Johns Point (SM2689)Application Documents1 Oct 2026View
Volume 4b Figure 9-23 - Viewpoint CH6 - Ham Cairn (SM454)Application Documents1 Oct 2026View
Volume 4b Figure 9-24 - Viewpoint CH7 - Earl's CairnApplication Documents1 Oct 2026View
Volume 4b Figure 9-25 - Viewpoint CH8 - Ring Hillock Cairn (SM474)Application Documents1 Oct 2026View
Volume 4b Figure 9-26 - Viewpoint CH9 - Dunnet Cairns (SM448)Application Documents1 Oct 2026View
Volume 4b Figure 9-27 - Viewpoint CH10 - Earney Hillock Cairn (SM439)Application Documents1 Oct 2026View
Volume 4b Figure 9-28 - Viewpoint CH11 - Canisbay Parish Church (LB1795)Application Documents1 Oct 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application received

    Published milestoneCouncil source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.