Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Crystal Rig Wind Farm Cranshaws Duns Scottish Borders
Last published check: 22 Sept 2026, 04:03. Check the council record for more recent changes.
Crystal Rig Wind Farm Cranshaws Duns Scottish Borders
This record has no verified map location.
View council mapConstruction and operation of a repower of Crystal Rig I wind farm. Consisting of up to 10 wind turbines including six turbines with a maximum overall height (to blade tip) of up to 230 m and the remaining four turbines with a maximum overall height (to blade tip) of up to 200 m.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| SBC RESPONSE TO ECU (NO OBJECTION)Correspondence · PDF | 10 Aug 2026 | View |
| SBC RESPONSE TO ECU (NO OBJECTION)Correspondence · PDF | 10 Aug 2026 | View |
| COMMITTEE REPORT(10.08.2026)Report · PDF | 3 Aug 2026 | View |
| APPLICANT - OFFICER RE GRID CONNECTIONCorrespondence | 24 Jul 2026 | View |
| TIP HEIGHT REDUCTION APPRAISALReport · PDF | 14 Jul 2026 | View |
| SBC / ECU PPAProcessing Agreement · PDF | 24 Jun 2026 | View |
| ENVIRONMENTAL HEALTHConsultee Comment · PDF | 24 Jun 2026 | View |
| ENVIRONMENTAL HEALTHConsultee Comment · PDF | 24 Jun 2026 | View |
| CONSULTEE COMMENT RE; GRID CONNECTIONConsultee Comment · PDF | 24 Jun 2026 | View |
| CONSULTEE COMMENT RE; GRID CONNECTIONConsultee Comment · PDF | 24 Jun 2026 | View |
| CONSULTEE COMMENT RE; GRID CONNECTIONConsultee Comment · PDF | 24 Jun 2026 | View |
| APPLICANT RE; GRID CONNECTIONCorrespondence · PDF | 2 Jun 2026 | View |
| APPLICANT RE; GRID CONNECTIONCorrespondence · PDF | 2 Jun 2026 | View |
| LANDSCAPE ARCHITECTAdverts | 23 Dec 2025 | View |
| VIEWPOINT 2 - PEAT LAWOther · PDF | 18 Dec 2025 | View |
| VIEWPOINT 1 - MINOR ROAD NORTH WEST STEELOther · PDF | 17 Dec 2025 | View |
| ROADS PLANNINGConsultation Reply · PDF | 31 Oct 2025 | View |
| OUTDOOR ACCESS OFFICERConsultation Reply · PDF | 22 Oct 2025 | View |
| CONSULTATION FROM SCOTTISH GOVERNMENTCorrespondence · PDF | 13 Oct 2025 | View |
| VOLUME 4 - APPENDIX 9.4 - PEAT SLIDE RISK ASSESSMENT STAGE 2.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 4.2 - DECOMMISSIONING, RESTORATION AND AFTERCARE STATEMENT .Other · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 4.2 - DECOMMISSIONING, RESTORATION AND AFTERCARE STATEMENT (Other · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 2.4 - GATECHECK RESPONSES.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 2.3 - GATECHECK REPORT.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 2.2 - SCOPING OPINION.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 2.1 - SCOPING REPORT (REDACTED).PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 11.4 - EDINBURGH AIRPORT RESPONSE TO INSTRUMENT FLIGHT PROCEOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 11.3 - INSTRUMENT FLIGHT PROCEDURES ASSESSMENT REPORT FOR EDOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 11.2 - CIVIL AVIATION AUTHORITY RESPONSE TO AVIATION LIGHTINOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 11.1 - AVIATION LIGHTING REPORT.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 6.9 - CULTURAL HERITAGE VIEWPOINT 6 - DOON HILL, FORTS (SCHEDUOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 6.8 - CULTURAL HERITAGE VIEWPOINT 5 - EWIESIDE FORT (SCHEDULEDOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 6.7 - CULTURAL HERITAGE VIEWPOINT 4 - SHANNABANK HILL FORT (SCOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 6.7 - CULTURAL HERITAGE VIEWPOINT 4 - SHANNABANK HILL FORT (SCOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 6.6 - CULTURAL HERITAGE VIEWPOINT 3 - KINGSIDE HILL, STONE CIROther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 6.6 - CULTURAL HERITAGE VIEWPOINT 3 - KINGSIDE HILL, STONE CIROther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 6.5 - CULTURAL HERITAGE VIEWPOINT 2 - JOHNSCLEUGH, STONE SETTIOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 6.4 - CULTURAL HERITAGE VIEWPOINT 1 - YADLEE, STONE CIRCLE 250Other · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 6.15 - CULTURAL HERITAGE VIEWPOINT 12 - COCKBURN LAW, FORT (SCOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 6.14 - CULTURAL HERITAGE VIEWPOINT 11 - TRAPRAIN LAW, FORT (SCOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 6.13 - CULTURAL HERITAGE VIEWPOINT 10 - DIRRINGTON GREAT LAW,Other · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 6.12 - CULTURAL HERITAGE VIEWPOINT 9 - HOPETOUN MONUMENT (LISTOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 6.11 - CULTURAL HERITAGE VIEWPOINT 8 - SPOTT DOD, FORT (SCHEDUOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 6.10 - CULTURAL HERITAGE VIEWPOINT 7 - THE CHESTERS, FORT (SCHOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.43 - VIEWPOINT 30 - SPARTLETON HILL.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.42 - VIEWPOINT 29 - NORTH BERWICK LAW.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.41 - VIEWPOINT 28 - B6461 EAST OF SWINTON.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.40 - VIEWPOINT 27 - B6370 NORTH OF PITCOX.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.39 - VIEWPOINT 26 - DUNS LAW.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.38 - VIEWPOINT 25 - SOUTHERN UPLAND WAY NEAR WATCH WATER RESOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 8.2B - CRYSTAL RIG II OPERATIONAL SURVEY AREAS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.8C - TURBINE LIGHTING COMPARATIVE ZONE OF THEORETICAL VISIBIOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.6A - BLADE TIP ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINTOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.4A - DESIGNATIONS 45 KILOMETRES.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13O - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH FALLAGOOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.11A - PRINCIPAL VISUAL RECEPTORS WITH BLADE TIP ZONE OF THEOOther · PDF | 24 Sept 2025 | View |
| CRYSTAL RIG REPOWER_S36 COVER LETTER V3.0 (1) (002)_REDACTED.PDFOther · PDF | 24 Sept 2025 | View |
| CRYSTAL RIG I REPOWER - MARINE DIRECTORATE ENVIRONMENTAL IMPACT ASSESSMENT CHECKOther · PDF | 24 Sept 2025 | View |
| CRYSTAL RIG I REPOWER - CONTENTS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 9.5 - BORROW PIT ASSESSMENT.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 9.3 - GROUNDWATER DEPENDENT TERRESTRIAL ECOSYSTEM ASSESSMENTOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 9.2 - OUTLINE PEAT MANAGEMENT PLAN.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 9.1 - WATERCOURSE CROSSING ASSESSMENT.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 8.1 - ORNITHOLOGY.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 7.2 - OUTLINE BIODIVERSITY ENHANCEMENT MANAGEMENT PLAN.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 6.3 - DESIGNATED ASSETS IN THE OUTER STUDY AREA WITH NO VISIOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 6.2 - DESIGNATED HERITAGE ASSETS IN THE OUTER STUDY AREA WITOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 6.1 - CULTURAL HERITAGE ASSETS IN THE INNER STUDY AREA.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 5.2 - RESIDENTIAL VISUAL AMENITY ASSESSMENT.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 5.1 - LANDSCAPE AND VISUAL IMPACT ASSESSMENT METHODOLOGY.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 4.1 - OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 12.2 - NOISE MODELLING AND CALCULATIONS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 4 - APPENDIX 12.1 - LEGISLATION, POLICY AND GUIDANCE.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 4.7A - SWITCH ROOM ELEVATION.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 4.6 - INDICATIVE ACCESS TRACK CROSS-SECTIONS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 4.5 - INDICATIVE TURBINE HARDSTANDING.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 4.4 - INDICATIVE TURBINE FOUNDATIONS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 4.3B - INDICATIVE TURBINE ELEVATION.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 4.3A - INDICATIVE TURBINE ELEVATION.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 4.3A - INDICATIVE TURBINE ELEVATION (1).PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 4.2 - ON-SITE ENVIRONMENTAL CONSTRAINTS.PDOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 3.3 - DESIGN ITERATION LAYOUTS E-F.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 3.2 - DESIGN ITERATION LAYOUTS C-D.PDOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 3.1 - DESIGN ITERATION LAYOUTS A-B.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 1.3 - CRYSTAL RIG COMPLEX.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 1.2 - SITE LAYOUT.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 1.1 - SITE LOCATION.PDFOther · PDF | 24 Sept 2025 | View |
| CRYSTAL RIG I REPOWER - SOCIO-ECONOMICS AND TOURISM REPORT.PDFOther · PDF | 24 Sept 2025 | View |
| CRYSTAL RIG I REPOWER - PRE-APPLICATION CONSULTATION REPORT PART 3.PDFOther · PDF | 24 Sept 2025 | View |
| CRYSTAL RIG I REPOWER - PRE-APPLICATION CONSULTATION REPORT PART 2.PDFOther · PDF | 24 Sept 2025 | View |
| CRYSTAL RIG I REPOWER - PRE-APPLICATION CONSULTATION REPORT PART 1.PDFOther · PDF | 24 Sept 2025 | View |
| CRYSTAL RIG I REPOWER - PLANNING STATEMENT.PDFOther · PDF | 24 Sept 2025 | View |
| CRYSTAL RIG I REPOWER - NON-TECHNICAL SUMMARY.PDFOther · PDF | 24 Sept 2025 | View |
| CRYSTAL RIG I REPOWER - DESIGN AND ACCESS STATEMENT.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.7D - HUB HEIGHT ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.7C - HUB HEIGHT ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.7B - HUB HEIGHT ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.7A - HUB HEIGHT ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.6D - BLADE TIP ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINTOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.6C - BLADE TIP ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINTOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.6B - BLADE TIP ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINTOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.5B - PRINCIPAL VISUAL RECEPTORS 20 KILOMETRES.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.5A - PRINCIPAL VISUAL RECEPTORS 45 KILOMETRES.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.4C - DESIGNATIONS LEGEND.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.4B - DESIGNATIONS 20 KILOMETRES.PDOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.3C - LANDSCAPE CHARACTER LEGEND.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.3B - LANDSCAPE CHARACTER 20 KILOMETRES.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.3A - LANDSCAPE CHARACTER 45 KILOMETRES.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.2 - LANDFORM.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.1 - SITE LOCATION AND STUDY AREA.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 4.8 - TEMPORARY CONSTRUCTION COMPOUND.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 4.7B - SWITCH ROOM FLOOR PLAN.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 8.5 - CRYSTAL RIG II OPERATIONAL MONITORING SURVEY RESULTS 201Other · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 8.4 - CRYSTAL RIG I OPERATIONAL MONITORING SURVEY RESULTS 2022Other · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 8.3 - CRYSTAL RIG IV SURVEY RESULTS (MARCH 2014 - FEBRUARY 201Other · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 8.2F - CRYSTAL RIG IV VANTAGE POINTS AND VIEWSHEDS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 8.2E - CRYSTAL RIG IV ORNITHOLOGY SURVEYS AREAS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 8.2D - CRYSTAL RIG III OPERATIONAL SURVEY AREAS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 8.2C - CRYSTAL RIG III BASELINE ORNITHOLOGY SURVEY AREAS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 8.2A CRYSTAL RIG I OPERATIONAL ORNITHOLOGY SURVEY AREAS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 8.1 - DESIGNATED SITES OF ORNITHOLOGICAL INTEREST.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 7.8 - OUTLINE ENHANCEMENT AREAS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 7.7 - FATALITY SURVEY AREA AND RESULTS 2024.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 7.6A-B - PROTECTED MAMMAL SURVEY RESULTS 2024.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 7.5A-D - NATIONAL VEGETATION CLASSIFICATION SURVEY RESULTS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 7.4 - PHASE 1 HABITAT SURVEY RESULTS 2023.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 7.3 - NON-STATUTORY DESIGNATED SITES OF ECOLOGICAL INTEREST.PDOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 7.2 - STATUTORY DESIGNATED SITES OF ECOLOGICAL INTEREST.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 6.3 - CUMULATIVE DEVELOPMENTS AND VISUALISATION LOCATIONS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 6.2B - OUTER STUDY AREA.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 6.2A - OUTER STUDY AREA.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 6.1B - CULTURAL HERITAGE INNER STUDY AREA.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 6.1A - CULTURAL HERITAGE INNER STUDY AREA.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.9B - LANDSCAPE CHARACTER WITH BLADE TIP ZONE OF THEORETICALOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.9A - LANDSCAPE CHARACTER WITH BLADE TIP ZONE OF THEORETICALOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.8D - LIGHTING INTENSITY ZONE OF THEORETICAL VISIBILITY 20 KIOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.8B - TURBINE LIGHTING ZONE OF THEORETICAL VISIBILITY 20 KILOOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.8A - BASELINE LIGHT POLLUTION 20 KILOMETRES.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13X - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH OPERATIOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13W - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH QUIXWOOOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13V - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH NEWLANDOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13U - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH NEUK FAOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13T - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH LONGCROOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13S - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH LEES HIOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13R - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH KEITH HOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13Q - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH HOPRIGSOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13P - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH FERNEYLOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13N - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH DUNSIDEOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13M - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH DUN LAWOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13L - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH DRONE HOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13K - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH DITCHEROther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13J - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH CRYSTALOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13I - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH CRYSTALOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13H - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH CRYSTALOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13G - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH CRYSTALOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13F - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH BROCKHOOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13E - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH BLACK HOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13C - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH AIKENGAOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13B - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH AIKENGAOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.13A - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH AIKENGAOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.12 - CUMULATIVE WIND FARMS 20 KILOMETRES.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.11B - PRINCIPAL VISUAL RECEPTORS WITH BLADE TIP ZONE OF THEOOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.10B - DESIGNATIONS WITH BLADE TIP ZONE OF THEORETICAL VISIBIOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 5.10A - DESIGNATIONS WITH BLADE TIP ZONE OF THEORETICAL VISIBIOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.37 - VIEWPOINT 24 - B6355 CRANSHAWS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.36 - VIEWPOINT 23 - COCKBURN LAW HILL FORT.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.35 - VIEWPOINT 22 - BERWICKSHIRE COASTAL PATH NEAR PEASE BAYOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.34 - VIEWPOINT 21 - JOHN MUIR LINK NEAR BARNS NESS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.33 - VIEWPOINT 20 - A6093 NISBET LOANHEAD.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.32 - VIEWPOINT 19 - B6471 HADDINGTON.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.31 - VIEWPOINT 18 - B6355 B6371 SOUTHEN EDGE OF TRANENT.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 1 - CHAPTER 9 - GEOLOGY, HYDROLOGY AND GEOHYDROLOGY.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 1 - CHAPTER 8 - ORNITHOLOGY.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 1 - CHAPTER 7 - ECOLOGY.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 1 - CHAPTER 6 - CULTURAL HERITAGE.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 1 - CHAPTER 5 - LANDSCAPE AND VISUAL IMPACT ASSESSMENT.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 1 - CHAPTER 4 - PROJECT DESCRIPTION.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 1 - CHAPTER 3 - SITE SELECTION AND DESIGN ITERATION.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 1 - CHAPTER 2 - APPROACH TO ENVIRONMENTAL IMPACT ASSESSMENT .PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 1 - CHAPTER 14 - SUMMARY OF MITIGATION, ENHANCEMENT AND RESIDUAL EFFECTS.Other · PDF | 24 Sept 2025 | View |
| VOLUME 1 - CHAPTER 13 - OTHER ISSUES.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 1 - CHAPTER 12 - NOISE.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 1 - CHAPTER 11 - AVIATION AND EXISTING INFRASTRUCTURE.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 1 - CHAPTER 10 - TRAFFIC AND TRANSPORT.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 1 - CHAPTER 1 - INTRODUCTION.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.30 - VIEWPOINT 17 - A138 DIRLETON JUNCTION.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.29 - VIEWPOINT 16 - LAMMER LAW.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.29 - VIEWPOINT 16 - LAMMER LAW (1).PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.28 - VIEWPOINT 15 - ST BALDRED'S CRADLE, JOHN MUIR COUNTRY POther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.27 - VIEWPOINT 14 - TWIN LAW.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.26 - VIEWPOINT 13 - BLACKCASTLE HILL.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.25 - VIEWPOINT 12 - SOUTHERN UPLAND WAY NORTH OF BLACK HILL.Other · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.24 - VIEWPOINT 11 - FOOTPATH, KILPALLET FARM.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.23 - VIEWPOINT 10 - MINOR ROAD SOUTH OF SPOTT.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.22 - VIEWPOINT 9 - DUNBAR COMMON.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.21 - VIEWPOINT 8 - TRAPRAIN LAW.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.20 - VIEWPOINT 7 - A6112 NORTH OF PRESTON.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.19 - VIEWPOINT 6 - MINOR ROAD NEAR DIRRINGTON GREAT LAW.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.18 - VIEWPOINT 5 - B6355 AT MOSS LAW.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.18 - VIEWPOINT 5 - B6355 AT MOSS LAW (1).PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.17 - VIEWPOINT 4 - MINOR ROAD RIGHT OF WAY AT WRUNK LAW.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.16 - VIEWPOINT 3 - MINOR ROAD TO NORTH OF BOTHWELL.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 3 - FIGURE 5.14 - VIEWPOINT 1 - MINOR ROAD NORTH OF WEST STEEL.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 9.7 - HYDROLOGICAL CONSTRAINTS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 9.6 - BEDROCK GEOLOGY.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 9.5 - SUPERFICIAL GEOLOGY.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 9.4 - INTERPOLATED PEAT DEPTH.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 9.3 - CARBON & PEATLAND SOILS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 9.2 - PREDOMINANT SOILS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 9.1 - HYDROLOGY OVERVIEW.PDOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 13.3 - CUMULATIVE SHADOW FLICKER ASSESSMENT RESULTS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 13.3 - CUMULATIVE SHADOW FLICKER ASSESSMENT RESULTS (1).PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 13.2 - SHADOW FLICKER ASSESSMENT RESULTS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 13.1 - SHADOW FLICKER ASSESSMENT STUDY AREA.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 12.2 - PREDICTED TURBINE NOISE CONTOURS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 12.1 - SITE LAYOUT AND NOISE RECEPTORS.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 11.1 - AVIATION STUDY AREA.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 10.2 - ABNORMAL INDIVISIBLE LOAD VEHICLE ROUTE.PDFOther · PDF | 24 Sept 2025 | View |
| VOLUME 2 - FIGURE 10.1 - STUDY AREA AND TRAFFIC COUNT LOCATIONS.PDFOther · PDF | 24 Sept 2025 | View |
| ENERGY CONSENT UNITCorrespondence | 24 Sept 2025 | View |
| PROPOSED PLANNING CONDITIONS - TRACKED CHANGES.DOCXOther | 24 Sept 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceAppeal status: Blank Field · Blank Field
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.