Council planning record

Construction and operation of a repower of Crystal Rig I wind farm. Consisting of up to 10 wind turbines including six turbines with a maximum overall height (to blade tip) of up to 230 m and the remaining four turbines with a maximum overall height (to blade tip) of up to 200 m.

Crystal Rig Wind Farm Cranshaws Duns Scottish Borders

DecidedReference: 25/01333/S36Scottish Borders

Last published check: 22 Sept 2026, 04:03. Check the council record for more recent changes.

Application location

Crystal Rig Wind Farm Cranshaws Duns Scottish Borders

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Section 36 Application
Received
24 Sept 2025
Validated
24 Sept 2025
Determination deadline
Not published
Local authority
Scottish Borders

Application overview

Construction and operation of a repower of Crystal Rig I wind farm. Consisting of up to 10 wind turbines including six turbines with a maximum overall height (to blade tip) of up to 230 m and the remaining four turbines with a maximum overall height (to blade tip) of up to 200 m.

Proposal details

Reference
25/01333/S36
Alternative references
ECU00005089
Ward
Mid Berwickshire
Agent
Blank Field

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 221 of 221

DocumentPublishedAction
SBC RESPONSE TO ECU (NO OBJECTION)Correspondence · PDF10 Aug 2026View
SBC RESPONSE TO ECU (NO OBJECTION)Correspondence · PDF10 Aug 2026View
COMMITTEE REPORT(10.08.2026)Report · PDF3 Aug 2026View
APPLICANT - OFFICER RE GRID CONNECTIONCorrespondence24 Jul 2026View
TIP HEIGHT REDUCTION APPRAISALReport · PDF14 Jul 2026View
SBC / ECU PPAProcessing Agreement · PDF24 Jun 2026View
ENVIRONMENTAL HEALTHConsultee Comment · PDF24 Jun 2026View
ENVIRONMENTAL HEALTHConsultee Comment · PDF24 Jun 2026View
CONSULTEE COMMENT RE; GRID CONNECTIONConsultee Comment · PDF24 Jun 2026View
CONSULTEE COMMENT RE; GRID CONNECTIONConsultee Comment · PDF24 Jun 2026View
CONSULTEE COMMENT RE; GRID CONNECTIONConsultee Comment · PDF24 Jun 2026View
APPLICANT RE; GRID CONNECTIONCorrespondence · PDF2 Jun 2026View
APPLICANT RE; GRID CONNECTIONCorrespondence · PDF2 Jun 2026View
LANDSCAPE ARCHITECTAdverts23 Dec 2025View
VIEWPOINT 2 - PEAT LAWOther · PDF18 Dec 2025View
VIEWPOINT 1 - MINOR ROAD NORTH WEST STEELOther · PDF17 Dec 2025View
ROADS PLANNINGConsultation Reply · PDF31 Oct 2025View
OUTDOOR ACCESS OFFICERConsultation Reply · PDF22 Oct 2025View
CONSULTATION FROM SCOTTISH GOVERNMENTCorrespondence · PDF13 Oct 2025View
VOLUME 4 - APPENDIX 9.4 - PEAT SLIDE RISK ASSESSMENT STAGE 2.PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 4.2 - DECOMMISSIONING, RESTORATION AND AFTERCARE STATEMENT .Other · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 4.2 - DECOMMISSIONING, RESTORATION AND AFTERCARE STATEMENT (Other · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 2.4 - GATECHECK RESPONSES.PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 2.3 - GATECHECK REPORT.PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 2.2 - SCOPING OPINION.PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 2.1 - SCOPING REPORT (REDACTED).PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 11.4 - EDINBURGH AIRPORT RESPONSE TO INSTRUMENT FLIGHT PROCEOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 11.3 - INSTRUMENT FLIGHT PROCEDURES ASSESSMENT REPORT FOR EDOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 11.2 - CIVIL AVIATION AUTHORITY RESPONSE TO AVIATION LIGHTINOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 11.1 - AVIATION LIGHTING REPORT.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 6.9 - CULTURAL HERITAGE VIEWPOINT 6 - DOON HILL, FORTS (SCHEDUOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 6.8 - CULTURAL HERITAGE VIEWPOINT 5 - EWIESIDE FORT (SCHEDULEDOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 6.7 - CULTURAL HERITAGE VIEWPOINT 4 - SHANNABANK HILL FORT (SCOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 6.7 - CULTURAL HERITAGE VIEWPOINT 4 - SHANNABANK HILL FORT (SCOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 6.6 - CULTURAL HERITAGE VIEWPOINT 3 - KINGSIDE HILL, STONE CIROther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 6.6 - CULTURAL HERITAGE VIEWPOINT 3 - KINGSIDE HILL, STONE CIROther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 6.5 - CULTURAL HERITAGE VIEWPOINT 2 - JOHNSCLEUGH, STONE SETTIOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 6.4 - CULTURAL HERITAGE VIEWPOINT 1 - YADLEE, STONE CIRCLE 250Other · PDF24 Sept 2025View
VOLUME 3 - FIGURE 6.15 - CULTURAL HERITAGE VIEWPOINT 12 - COCKBURN LAW, FORT (SCOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 6.14 - CULTURAL HERITAGE VIEWPOINT 11 - TRAPRAIN LAW, FORT (SCOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 6.13 - CULTURAL HERITAGE VIEWPOINT 10 - DIRRINGTON GREAT LAW,Other · PDF24 Sept 2025View
VOLUME 3 - FIGURE 6.12 - CULTURAL HERITAGE VIEWPOINT 9 - HOPETOUN MONUMENT (LISTOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 6.11 - CULTURAL HERITAGE VIEWPOINT 8 - SPOTT DOD, FORT (SCHEDUOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 6.10 - CULTURAL HERITAGE VIEWPOINT 7 - THE CHESTERS, FORT (SCHOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.43 - VIEWPOINT 30 - SPARTLETON HILL.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.42 - VIEWPOINT 29 - NORTH BERWICK LAW.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.41 - VIEWPOINT 28 - B6461 EAST OF SWINTON.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.40 - VIEWPOINT 27 - B6370 NORTH OF PITCOX.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.39 - VIEWPOINT 26 - DUNS LAW.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.38 - VIEWPOINT 25 - SOUTHERN UPLAND WAY NEAR WATCH WATER RESOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 8.2B - CRYSTAL RIG II OPERATIONAL SURVEY AREAS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.8C - TURBINE LIGHTING COMPARATIVE ZONE OF THEORETICAL VISIBIOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.6A - BLADE TIP ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINTOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.4A - DESIGNATIONS 45 KILOMETRES.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13O - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH FALLAGOOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.11A - PRINCIPAL VISUAL RECEPTORS WITH BLADE TIP ZONE OF THEOOther · PDF24 Sept 2025View
CRYSTAL RIG REPOWER_S36 COVER LETTER V3.0 (1) (002)_REDACTED.PDFOther · PDF24 Sept 2025View
CRYSTAL RIG I REPOWER - MARINE DIRECTORATE ENVIRONMENTAL IMPACT ASSESSMENT CHECKOther · PDF24 Sept 2025View
CRYSTAL RIG I REPOWER - CONTENTS.PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 9.5 - BORROW PIT ASSESSMENT.PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 9.3 - GROUNDWATER DEPENDENT TERRESTRIAL ECOSYSTEM ASSESSMENTOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 9.2 - OUTLINE PEAT MANAGEMENT PLAN.PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 9.1 - WATERCOURSE CROSSING ASSESSMENT.PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 8.1 - ORNITHOLOGY.PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 7.2 - OUTLINE BIODIVERSITY ENHANCEMENT MANAGEMENT PLAN.PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 6.3 - DESIGNATED ASSETS IN THE OUTER STUDY AREA WITH NO VISIOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 6.2 - DESIGNATED HERITAGE ASSETS IN THE OUTER STUDY AREA WITOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 6.1 - CULTURAL HERITAGE ASSETS IN THE INNER STUDY AREA.PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 5.2 - RESIDENTIAL VISUAL AMENITY ASSESSMENT.PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 5.1 - LANDSCAPE AND VISUAL IMPACT ASSESSMENT METHODOLOGY.PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 4.1 - OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN.PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 12.2 - NOISE MODELLING AND CALCULATIONS.PDFOther · PDF24 Sept 2025View
VOLUME 4 - APPENDIX 12.1 - LEGISLATION, POLICY AND GUIDANCE.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 4.7A - SWITCH ROOM ELEVATION.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 4.6 - INDICATIVE ACCESS TRACK CROSS-SECTIONS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 4.5 - INDICATIVE TURBINE HARDSTANDING.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 4.4 - INDICATIVE TURBINE FOUNDATIONS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 4.3B - INDICATIVE TURBINE ELEVATION.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 4.3A - INDICATIVE TURBINE ELEVATION.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 4.3A - INDICATIVE TURBINE ELEVATION (1).PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 4.2 - ON-SITE ENVIRONMENTAL CONSTRAINTS.PDOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 3.3 - DESIGN ITERATION LAYOUTS E-F.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 3.2 - DESIGN ITERATION LAYOUTS C-D.PDOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 3.1 - DESIGN ITERATION LAYOUTS A-B.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 1.3 - CRYSTAL RIG COMPLEX.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 1.2 - SITE LAYOUT.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 1.1 - SITE LOCATION.PDFOther · PDF24 Sept 2025View
CRYSTAL RIG I REPOWER - SOCIO-ECONOMICS AND TOURISM REPORT.PDFOther · PDF24 Sept 2025View
CRYSTAL RIG I REPOWER - PRE-APPLICATION CONSULTATION REPORT PART 3.PDFOther · PDF24 Sept 2025View
CRYSTAL RIG I REPOWER - PRE-APPLICATION CONSULTATION REPORT PART 2.PDFOther · PDF24 Sept 2025View
CRYSTAL RIG I REPOWER - PRE-APPLICATION CONSULTATION REPORT PART 1.PDFOther · PDF24 Sept 2025View
CRYSTAL RIG I REPOWER - PLANNING STATEMENT.PDFOther · PDF24 Sept 2025View
CRYSTAL RIG I REPOWER - NON-TECHNICAL SUMMARY.PDFOther · PDF24 Sept 2025View
CRYSTAL RIG I REPOWER - DESIGN AND ACCESS STATEMENT.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.7D - HUB HEIGHT ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.7C - HUB HEIGHT ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.7B - HUB HEIGHT ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.7A - HUB HEIGHT ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.6D - BLADE TIP ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINTOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.6C - BLADE TIP ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINTOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.6B - BLADE TIP ZONE OF THEORETICAL VISIBILITY WITH VIEWPOINTOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.5B - PRINCIPAL VISUAL RECEPTORS 20 KILOMETRES.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.5A - PRINCIPAL VISUAL RECEPTORS 45 KILOMETRES.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.4C - DESIGNATIONS LEGEND.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.4B - DESIGNATIONS 20 KILOMETRES.PDOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.3C - LANDSCAPE CHARACTER LEGEND.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.3B - LANDSCAPE CHARACTER 20 KILOMETRES.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.3A - LANDSCAPE CHARACTER 45 KILOMETRES.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.2 - LANDFORM.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.1 - SITE LOCATION AND STUDY AREA.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 4.8 - TEMPORARY CONSTRUCTION COMPOUND.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 4.7B - SWITCH ROOM FLOOR PLAN.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 8.5 - CRYSTAL RIG II OPERATIONAL MONITORING SURVEY RESULTS 201Other · PDF24 Sept 2025View
VOLUME 2 - FIGURE 8.4 - CRYSTAL RIG I OPERATIONAL MONITORING SURVEY RESULTS 2022Other · PDF24 Sept 2025View
VOLUME 2 - FIGURE 8.3 - CRYSTAL RIG IV SURVEY RESULTS (MARCH 2014 - FEBRUARY 201Other · PDF24 Sept 2025View
VOLUME 2 - FIGURE 8.2F - CRYSTAL RIG IV VANTAGE POINTS AND VIEWSHEDS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 8.2E - CRYSTAL RIG IV ORNITHOLOGY SURVEYS AREAS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 8.2D - CRYSTAL RIG III OPERATIONAL SURVEY AREAS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 8.2C - CRYSTAL RIG III BASELINE ORNITHOLOGY SURVEY AREAS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 8.2A CRYSTAL RIG I OPERATIONAL ORNITHOLOGY SURVEY AREAS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 8.1 - DESIGNATED SITES OF ORNITHOLOGICAL INTEREST.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 7.8 - OUTLINE ENHANCEMENT AREAS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 7.7 - FATALITY SURVEY AREA AND RESULTS 2024.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 7.6A-B - PROTECTED MAMMAL SURVEY RESULTS 2024.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 7.5A-D - NATIONAL VEGETATION CLASSIFICATION SURVEY RESULTS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 7.4 - PHASE 1 HABITAT SURVEY RESULTS 2023.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 7.3 - NON-STATUTORY DESIGNATED SITES OF ECOLOGICAL INTEREST.PDOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 7.2 - STATUTORY DESIGNATED SITES OF ECOLOGICAL INTEREST.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 6.3 - CUMULATIVE DEVELOPMENTS AND VISUALISATION LOCATIONS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 6.2B - OUTER STUDY AREA.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 6.2A - OUTER STUDY AREA.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 6.1B - CULTURAL HERITAGE INNER STUDY AREA.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 6.1A - CULTURAL HERITAGE INNER STUDY AREA.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.9B - LANDSCAPE CHARACTER WITH BLADE TIP ZONE OF THEORETICALOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.9A - LANDSCAPE CHARACTER WITH BLADE TIP ZONE OF THEORETICALOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.8D - LIGHTING INTENSITY ZONE OF THEORETICAL VISIBILITY 20 KIOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.8B - TURBINE LIGHTING ZONE OF THEORETICAL VISIBILITY 20 KILOOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.8A - BASELINE LIGHT POLLUTION 20 KILOMETRES.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13X - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH OPERATIOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13W - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH QUIXWOOOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13V - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH NEWLANDOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13U - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH NEUK FAOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13T - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH LONGCROOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13S - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH LEES HIOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13R - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH KEITH HOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13Q - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH HOPRIGSOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13P - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH FERNEYLOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13N - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH DUNSIDEOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13M - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH DUN LAWOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13L - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH DRONE HOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13K - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH DITCHEROther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13J - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH CRYSTALOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13I - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH CRYSTALOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13H - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH CRYSTALOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13G - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH CRYSTALOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13F - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH BROCKHOOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13E - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH BLACK HOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13C - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH AIKENGAOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13B - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH AIKENGAOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.13A - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH AIKENGAOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.12 - CUMULATIVE WIND FARMS 20 KILOMETRES.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.11B - PRINCIPAL VISUAL RECEPTORS WITH BLADE TIP ZONE OF THEOOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.10B - DESIGNATIONS WITH BLADE TIP ZONE OF THEORETICAL VISIBIOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 5.10A - DESIGNATIONS WITH BLADE TIP ZONE OF THEORETICAL VISIBIOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.37 - VIEWPOINT 24 - B6355 CRANSHAWS.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.36 - VIEWPOINT 23 - COCKBURN LAW HILL FORT.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.35 - VIEWPOINT 22 - BERWICKSHIRE COASTAL PATH NEAR PEASE BAYOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.34 - VIEWPOINT 21 - JOHN MUIR LINK NEAR BARNS NESS.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.33 - VIEWPOINT 20 - A6093 NISBET LOANHEAD.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.32 - VIEWPOINT 19 - B6471 HADDINGTON.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.31 - VIEWPOINT 18 - B6355 B6371 SOUTHEN EDGE OF TRANENT.PDFOther · PDF24 Sept 2025View
VOLUME 1 - CHAPTER 9 - GEOLOGY, HYDROLOGY AND GEOHYDROLOGY.PDFOther · PDF24 Sept 2025View
VOLUME 1 - CHAPTER 8 - ORNITHOLOGY.PDFOther · PDF24 Sept 2025View
VOLUME 1 - CHAPTER 7 - ECOLOGY.PDFOther · PDF24 Sept 2025View
VOLUME 1 - CHAPTER 6 - CULTURAL HERITAGE.PDFOther · PDF24 Sept 2025View
VOLUME 1 - CHAPTER 5 - LANDSCAPE AND VISUAL IMPACT ASSESSMENT.PDFOther · PDF24 Sept 2025View
VOLUME 1 - CHAPTER 4 - PROJECT DESCRIPTION.PDFOther · PDF24 Sept 2025View
VOLUME 1 - CHAPTER 3 - SITE SELECTION AND DESIGN ITERATION.PDFOther · PDF24 Sept 2025View
VOLUME 1 - CHAPTER 2 - APPROACH TO ENVIRONMENTAL IMPACT ASSESSMENT .PDFOther · PDF24 Sept 2025View
VOLUME 1 - CHAPTER 14 - SUMMARY OF MITIGATION, ENHANCEMENT AND RESIDUAL EFFECTS.Other · PDF24 Sept 2025View
VOLUME 1 - CHAPTER 13 - OTHER ISSUES.PDFOther · PDF24 Sept 2025View
VOLUME 1 - CHAPTER 12 - NOISE.PDFOther · PDF24 Sept 2025View
VOLUME 1 - CHAPTER 11 - AVIATION AND EXISTING INFRASTRUCTURE.PDFOther · PDF24 Sept 2025View
VOLUME 1 - CHAPTER 10 - TRAFFIC AND TRANSPORT.PDFOther · PDF24 Sept 2025View
VOLUME 1 - CHAPTER 1 - INTRODUCTION.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.30 - VIEWPOINT 17 - A138 DIRLETON JUNCTION.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.29 - VIEWPOINT 16 - LAMMER LAW.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.29 - VIEWPOINT 16 - LAMMER LAW (1).PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.28 - VIEWPOINT 15 - ST BALDRED'S CRADLE, JOHN MUIR COUNTRY POther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.27 - VIEWPOINT 14 - TWIN LAW.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.26 - VIEWPOINT 13 - BLACKCASTLE HILL.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.25 - VIEWPOINT 12 - SOUTHERN UPLAND WAY NORTH OF BLACK HILL.Other · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.24 - VIEWPOINT 11 - FOOTPATH, KILPALLET FARM.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.23 - VIEWPOINT 10 - MINOR ROAD SOUTH OF SPOTT.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.22 - VIEWPOINT 9 - DUNBAR COMMON.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.21 - VIEWPOINT 8 - TRAPRAIN LAW.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.20 - VIEWPOINT 7 - A6112 NORTH OF PRESTON.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.19 - VIEWPOINT 6 - MINOR ROAD NEAR DIRRINGTON GREAT LAW.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.18 - VIEWPOINT 5 - B6355 AT MOSS LAW.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.18 - VIEWPOINT 5 - B6355 AT MOSS LAW (1).PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.17 - VIEWPOINT 4 - MINOR ROAD RIGHT OF WAY AT WRUNK LAW.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.16 - VIEWPOINT 3 - MINOR ROAD TO NORTH OF BOTHWELL.PDFOther · PDF24 Sept 2025View
VOLUME 3 - FIGURE 5.14 - VIEWPOINT 1 - MINOR ROAD NORTH OF WEST STEEL.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 9.7 - HYDROLOGICAL CONSTRAINTS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 9.6 - BEDROCK GEOLOGY.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 9.5 - SUPERFICIAL GEOLOGY.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 9.4 - INTERPOLATED PEAT DEPTH.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 9.3 - CARBON & PEATLAND SOILS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 9.2 - PREDOMINANT SOILS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 9.1 - HYDROLOGY OVERVIEW.PDOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 13.3 - CUMULATIVE SHADOW FLICKER ASSESSMENT RESULTS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 13.3 - CUMULATIVE SHADOW FLICKER ASSESSMENT RESULTS (1).PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 13.2 - SHADOW FLICKER ASSESSMENT RESULTS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 13.1 - SHADOW FLICKER ASSESSMENT STUDY AREA.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 12.2 - PREDICTED TURBINE NOISE CONTOURS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 12.1 - SITE LAYOUT AND NOISE RECEPTORS.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 11.1 - AVIATION STUDY AREA.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 10.2 - ABNORMAL INDIVISIBLE LOAD VEHICLE ROUTE.PDFOther · PDF24 Sept 2025View
VOLUME 2 - FIGURE 10.1 - STUDY AREA AND TRAFFIC COUNT LOCATIONS.PDFOther · PDF24 Sept 2025View
ENERGY CONSENT UNITCorrespondence24 Sept 2025View
PROPOSED PLANNING CONDITIONS - TRACKED CHANGES.DOCXOther24 Sept 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Actual Committee Date

    Published milestoneCouncil source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Decision Made Date

    Published milestoneCouncil source
  6. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decided

Appeal status: Blank Field · Blank Field

Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.