Council planning record

Hybrid planning application for land East of Boothstown for a multi-phased, severable development comprising: - Full planning application comprising 65 dwellings (Use Class C3), located on the northern part of the site, together with vehicular access from Occupation Road, public open space, children's play space, the provision of new and enhancements to existing footpaths and cycleways, and associated engineering operations; and - Outline planning application, with all matters reserved for up to 285 dwellings (Use Class C3) with access point off Occupation Road together with public open space, children's play space, the provision of new and enhancements to existing footpaths and cycle ways, and associated engineering operations.

Land East Of Boothstown, Salford

ClosedReference: 23/81742/HYBEIASalford City Council

Last published check: 29 Sept 2026, 06:45. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid Date

    Published milestoneCouncil source
  2. Decision date

    Published milestoneCouncil source

Application summary

Status
Closed
Application type
Hybrid with Environmental Impact Assessment
Received
Not published
Validated
15 Aug 2023
Determination deadline
Not published
Local authority
Salford City Council

Application overview

Hybrid planning application for land East of Boothstown for a multi-phased, severable development comprising: - Full planning application comprising 65 dwellings (Use Class C3), located on the northern part of the site, together with vehicular access from Occupation Road, public open space, children's play space, the provision of new and enhancements to existing footpaths and cycleways, and associated engineering operations; and - Outline planning application, with all matters reserved for up to 285 dwellings (Use Class C3) with access point off Occupation Road together with public open space, children's play space, the provision of new and enhancements to existing footpaths and cycle ways, and associated engineering operations.

Proposal details

Reference
23/81742/HYBEIA
Ward
Boothstown and Ellenbrook Ward
Agent
Paul Forshaw

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land East Of Boothstown, Salford

This record has no verified map location.

Documents 101 of 101

DocumentPublishedAction
* PLN6 û PROPOSED PLANS - Phase 1 Boundary Treatments PlanPlans · PDF5 Jul 2023View
* TR08 - PL Flood Risk Assessment - Drainage cross sectionsTechnical assessment · PDF12 Jun 2023View
* TR29 - PL Tree Assessment - Arboricultural Impact AssessmentTechnical assessment · PDF31 Jul 2023View
* TECH - PL Technical Reports - Utility Feasibility ReportTechnical assessment · PDF31 Jul 2023View
* PLAN - PL Plans And Drawings - Phase 1 Coloured LayoutPlans · PDF17 May 2023View
* TECH - PL Technical Reports - Covering letterTechnical assessment · PDF31 Jul 2023View
* TR03 - PL Biodiversity Survey/Report - Biodiversity net gain design stage reportTechnical assessment · PDF31 Jul 2023View
* TECH - PL Technical Reports - Social Value StrategyTechnical assessment · PDF31 Jul 2023View
* TR03 - PL Biodiversity Survey/Report - CIEEM Assessment of EffectsTechnical assessment · PDF17 May 2023View
* PLN6 û PROPOSED PLANS - Boundary Treatment DetailsPlans · PDF5 Jul 2023View
Consultee response - School ServicesConsultation response9 Oct 2023View
* TR03 - PL Biodiversity Survey/Report - Breeding Bird SurveyTechnical assessment · PDF17 May 2023View
* TR03 - PL Biodiversity Survey/Report - Ecology Desk StudyTechnical assessment · PDF17 May 2023View
* TR10 - PL Heritage Assessment - Heritage StatementTechnical assessment · PDF31 Jul 2023View
Consultee response - National HighwaysConsultation response · PDF21 Nov 2023View
Consultee Response - TFGMConsultation response · PDF29 Sept 2023View
* TR13 - PL Noise Impact Assessment - Noise Assessment - Phase 1Technical assessment · PDF31 Jul 2023View
Consultee Response - National Highways - holding responseConsultation response · PDF28 Sept 2023View
Consultee response - Ramblers AssociationConsultation response10 Oct 2023View
Consultee response - GMAASConsultation response25 Sept 2023View
* TR07 - PL Environmental Impact Assessment - Environmental Statement Volume 1 (Primary reporting and graphics)Environmental Impact Assessment · PDF31 Jul 2023View
* TR17 - Planning Statement - Planning & Affordable Housing StatementPlanning statement · PDF31 Jul 2023View
Consultee response - Barton AerodromeConsultation response12 Sept 2023View
Consultee response - Peak and Northern Footpaths SocietyConsultation response · PDF14 Oct 2023View
Consultee Response - Active Travel EnglandConsultation response · PDF27 Sept 2023View
* PLAN - PL Plans And Drawings - Phase 1 Surface Materials PlanPlans · PDF17 May 2023View
* TR16 - PL S106 Terms of Reference - Draft S106 Heads of TermsTechnical assessment · PDF31 Jul 2023View
* TR08 - PL Flood Risk Assessment - Phase 1 Drainage StrategyTechnical assessment · PDF17 May 2023View
Consultee Response - Historic EnglandConsultation response28 Sept 2023View
* PLAN - PL Plans And Drawings - Phase 1 Refuse Storage PlanPlans · PDF17 May 2023View
Proposed house types plan packPlans · PDF17 May 2023View
* TR10 - PL Heritage Assessment - Archaeological AssessmentTechnical assessment · PDF17 May 2023View
* PLAN - PL Plans And Drawings - Phase 1 Site LayoutPlans · PDF17 May 2023View
* TECH - PL Technical Reports - Lighting AssessmentTechnical assessment · PDF17 May 2023View
* TR07 - PL Environmental Impact Assessment -Environmental Impact Assessment · PDF31 Jul 2023View
Consultee response - GM Fire and RescueConsultation response · PDF10 Oct 2023View
Consultee response - Air quality, Noise and Contaminated landConsultation response11 Oct 2023View
* TR03 - PL Biodiversity Survey/Report - Badger SurveysTechnical assessment · PDF31 Jul 2023View
* PLN6 û PROPOSED PLANS - Site sectionsPlans · PDF24 Jul 2023View
* PLAN - PL Plans And Drawings - Phase 1 Rendered LayoutPlans · PDF17 May 2023View
* TECH - PL Technical Reports - Masterplan documentTechnical assessment · PDF31 Jul 2023View
Consultee response - Open Space SocietyConsultation response9 Oct 2023View
* TR03 - PL Biodiversity Survey/Report - Biodiversity Metric 3.0 - Phase 1 AreaTechnical assessment17 May 2023View
Consultee response - design for securityConsultation response4 Oct 2023View
* PLN6 û PROPOSED PLANS - Parameters planPlans · PDF12 Jul 2023View
* TR08 - PL Flood Risk Assessment - NW-SuDS-Pro-formaTechnical assessment · PDF13 Jun 2023View
* PLAN - PL Plans And Drawings - Street Scenes 1Plans · PDF17 May 2023View
* TR11 - PL Land Contamination Assessment - Land contamination assessment Phase 1Technical assessment · PDF11 Sept 2023View
* TR07 - PL Environmental Impact Assessment - Environmental Statement Volume 3 (Environmental Management Plan)Environmental Impact Assessment · PDF17 May 2023View
* TR07 - PL Environmental Impact Assessment - Environmental Statement Volume 2 (Technical Appendices)Environmental Impact Assessment · PDF31 Jul 2023View
Consultee response - GM Fire and RescueConsultation response · PDF10 Oct 2023View
* TECH - PL Technical Reports - Statement of Community InvolvementTechnical assessment · PDF17 May 2023View
* TECH - PL Technical Reports - Agricultural Land QualityTechnical assessment · PDF17 May 2023View
Consultation Response - Sport England objection - 26/9/23Consultation response26 Sept 2023View
* TECH - PL Technical Reports - Education AssessmentTechnical assessment · PDF31 Jul 2023View
* TR03 - PL Biodiversity Survey/Report - Water vole surveyTechnical assessment · PDF31 Jul 2023View
Consultee response - Natural England ResponseConsultation response · PDF12 Oct 2023View
* TECH - PL Technical Reports - Health Impact StatementTechnical assessment · PDF31 Jul 2023View
* TR11 - PL Land Contamination Assessment - Ground Gas AddendumTechnical assessment · PDF17 May 2023View
* TR03 - PL Biodiversity Survey/Report - Bat Activity ReportTechnical assessment · PDF17 May 2023View
* LOCP - PL Location Plan - Phase 1 boundary planPlans · PDF17 May 2023View
* TR08 - PL Flood Risk Assessment - Flood risk assessment and site wide drainage strategyTechnical assessment · PDF31 Jul 2023View
* TECH - PL Technical Reports - Design CodeTechnical assessment · PDF31 Jul 2023View
* TR04 - PL Crime Prevention Plan - Crime Impact Statement Phase 1Technical assessment · PDF31 Jul 2023View
Consultee response - United UtilitiesConsultation response · PDF13 Oct 2023View
* LOCP - PL Location Plan - Location PlanPlans · PDF17 May 2023View
* TR27 - PL Transport Assessment - Transport AssessmentTechnical assessment · PDF31 Jul 2023View
* PLAN - PL Plans And Drawings - Street Scenes 2Plans · PDF17 May 2023View
Consultee response - coal authorityConsultation response · PDF8 Sept 2023View
Minerals and waste - 26/9/23Consultation response · PDF26 Sept 2023View
* TR28 - PL Travel Plan - Framework Travel PlanTechnical assessment · PDF17 May 2023View
* APPL - PL Application Form -Application form · PDF16 Aug 2023View
Consultee Response - National HighwaysConsultation response · PDF28 Sept 2023View
* TR03 - PL Biodiversity Survey/Report - Biodiversity Metric 3.0 - Outline AreaTechnical assessment17 May 2023View
Consultee response - GMEUConsultation response · PDF18 Mar 2024View
* TECH - PL Technical Reports - Mineral Safeguarding Assessment.Technical assessment · PDF17 May 2023View
* TR11 - PL Land Contamination Assessment - Land contamination assessment Phase 2Technical assessment · PDF11 Sept 2023View
* DAAS - PL Design and Access Statement - Design and Access StatementDesign and Access Statement · PDF31 Jul 2023View
* TECH - PL Technical Reports - Natural Capital Assessment Summary ReportTechnical assessment · PDF31 Jul 2023View
* PLN5 û EXISTING PLANS - Existing topo survey pages 1-10Plans · PDF12 Jun 2023View
* TR03 - PL Biodiversity Survey/Report - Bat AssessmentTechnical assessment · PDF31 Jul 2023View
Consultee response - Cadent GasConsultation response9 Oct 2023View
* TR08 - PL Flood Risk Assessment - Hydraulic Modelling ReportTechnical assessment · PDF17 May 2023View
* TR04 - PL Crime Prevention Plan - Crime Impact Statement Outline PhaseTechnical assessment · PDF31 Jul 2023View
* TR29 - PL Tree Assessment - Tree Survey Data SheetsTechnical assessment · PDF17 May 2023View
Consultee response - National Highways 16 February 2024Consultation response · PDF16 Feb 2024View
* PLAN - PL Plans And Drawings - Illustrative MasterplanPlans · PDF17 May 2023View
Plans And Drawings - Phase 1 Parking Space PlanPlans · PDF17 May 2023View
* PLAN - PL Plans And Drawings - Phase 1 Coloured Layout - Overall SitePlans · PDF17 May 2023View
Consultation Response - Environment AgencyConsultation response · PDF28 Sept 2023View
Consultation Response - flood risk & drainageConsultation response16 Oct 2023View
Consultee response - Canal and River Trust 7.9.23Consultation response7 Sept 2023View
Consultee response - National HighwaysConsultation response · PDF30 May 2024View
* TR03 - PL Biodiversity Survey/Report - Phase 1 habitat survey planTechnical assessment · PDF17 May 2023View
* PLAN - PL Plans And Drawings - Phase 1 S38 Boundary PlanPlans · PDF17 May 2023View
Consultee response - Electricity NWCorrespondence9 Oct 2023View
* TR37 - Landscaping - Soft Landscaping StrategyTechnical assessment · PDF17 May 2023View
* TR07 - PL Environmental Impact Assessment - Environmental Statement Volume 4 (Non technical summary)Environmental Impact Assessment · PDF17 May 2023View
Consultee response - LandscapesConsultation response · PDF29 Sept 2023View
* PLAN - PL Plans And Drawings - Phase 1 Building Heights PlanPlans · PDF17 May 2023View
* TR03 - PL Biodiversity Survey/Report - Extended phase 1 habitat survey reportTechnical assessment · PDF31 Jul 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Withdrawn
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.