Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land Bound By Greengate And Trinity Way And Collier Street And Intersected By Boond Street And Caygill Street, M3 7BN
Last published check: 2 Oct 2026, 14:46. Check the council record for more recent changes.
Land Bound By Greengate And Trinity Way And Collier Street And Intersected By Boond Street And Caygill Street, M3 7BN
This record has no verified map location.
Application for approval of Reserved Matters (Access, Appearance, Landscaping, Layout and Scale) pursuant to Outline Planning Permission 21/78473/HYBEIA for Plot C, comprising the demolition of existing buildings and a residential-led development of a 42-storey (plus ground) building containing 444 apartments together with associated residents' amenities, ground floor commercial floorspace, basement parking, public realm improvements including the delivery of Boulevard West, Collier Square and Collier Street, and other associated infrastructure works. (EIA Development Application accompanied by an Environmental Statement Addendum)
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| * PLAN - PL Plans And Drawings - TOWER LEVEL 42 FLOOR PLAN rev. P03Plans · PDF | 21 Oct 2021 | View |
| * TECH - PL Technical Reports - EIA Addendum IntroductionTechnical assessment · PDF | 22 Sept 2021 | View |
| * TECH - PL Technical Reports - Daylight EIA Addendum ChapterTechnical assessment · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - General Arrangement Podium Elevation The BoulevardPlans · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - Tower Level 02 Floor Plan rev. P05Plans · PDF | 28 Oct 2021 | View |
| * TECH - PL Technical Reports - Tonscape and Visual Impact Assessment 6a2Technical assessment · PDF | 22 Sept 2021 | View |
| * SUPL - Superseded Plan - BASEMENT 2 FLOOR PLAN rev. P03Plans · PDF | 21 Oct 2021 | View |
| * SUPL - Superseded Plan - Basement 2 Floor Plan rev. P06Plans · PDF | 26 Nov 2021 | View |
| * TECH - PL Technical Reports - Appendix 11a.1 Wind Microclimate Technical ReportTechnical assessment · PDF | 22 Sept 2021 | View |
| * CONS - PL Consultation Response - HSE (Fire Statement)Consultation response · PDF | 3 Nov 2021 | View |
| * PLAN - PL Plans And Drawings - Plot C Greengate 3D View existing consented vs proposedPlans · PDF | 22 Sept 2021 | View |
| * TR10 - PL Heritage Assessment - Heritage Statement AppendixTechnical assessment · PDF | 22 Sept 2021 | View |
| * SUPL - Superseded Plan - PODIUM LEVEL 01 FLOOR PLAN rev. P03Plans · PDF | 21 Oct 2021 | View |
| * CONS - PL Consultation Response - NATSConsultation response · PDF | 11 Oct 2021 | View |
| * PLAN - PL Plans And Drawings - South ElevationPlans · PDF | 22 Sept 2021 | View |
| * CONS - PL Consultation Response - LandscapeConsultation response · PDF | 15 Oct 2021 | View |
| * CONS - PL Consultation Response - SCC RegenerationConsultation response | 12 Oct 2021 | View |
| * CONS - PL Consultation Response - AQNCLConsultation response | 2 Dec 2021 | View |
| * PLAN - PL Plans And Drawings - Basement 2 Floor Plan rev. P05 (Final)Plans · PDF | 7 Dec 2021 | View |
| * CONS - PL Consultation Response - Natural England - further info requestedConsultation response · PDF | 6 Oct 2021 | View |
| * CONS - PL Consultation Response -Consultation response · PDF | 29 Nov 2021 | View |
| * SUPL - Superseded Plan - Greengate Two Typical facade bay tower facade bay study 03Plans · PDF | 22 Sept 2021 | View |
| * SUPL - Superseded Plan - Greengate Phase 2 Plot C Basement 2 Floor PlanPlans · PDF | 22 Sept 2021 | View |
| * TR04 - PL Crime Prevention Plan - Crime Impact StatementTechnical assessment · PDF | 22 Sept 2021 | View |
| * SUPL - Superseded Plan - Basement 1 Floor Plan rev. P04Plans · PDF | 16 Nov 2021 | View |
| * PLAN - PL Plans And Drawings - Podium Level 01 Floor Plan rev. P04Plans · PDF | 28 Oct 2021 | View |
| * PLN10 - Landscaping Plans - Landscape Planting Plan rev. P2Plans · PDF | 2 Nov 2021 | View |
| * PLAN - PL Plans And Drawings - Plot C Greengate 3D View existing consented vs proposedPlans · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - Greengate Two Typical facade bay tower facade bay study 02Plans · PDF | 22 Sept 2021 | View |
| * SUPL - Superseded Plan - BASEMENT 1 FLOOR PLAN rev. P03Plans · PDF | 21 Oct 2021 | View |
| * SUPL - Superseded Plan - Public Realm Proposals rev. P7Plans · PDF | 2 Nov 2021 | View |
| * TECH - PL Technical Reports - Wind AddendumTechnical assessment · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - Greengate Phase 2 Plot C Existing Site PlanPlans · PDF | 22 Sept 2021 | View |
| * CONS - PL Consultation Response - LandscapeConsultation response | 18 Nov 2021 | View |
| * SUPL - Superseded Plan - Greengate Phase 2 Plot C Basement 3 Floor PlanPlans · PDF | 22 Sept 2021 | View |
| * TECH - PL Technical Reports - Presentation with Summary of RevisionsTechnical assessment · PDF | 21 Oct 2021 | View |
| * PLAN - PL Plans And Drawings - TYPICAL TOWER PLAN - TYPE 1 rev. P04Plans · PDF | 21 Oct 2021 | View |
| * SUPL - Superseded Plan - Greengate Phase 2 Plot C Typical Tower Plan Type 1Plans · PDF | 22 Sept 2021 | View |
| * TECH - PL Technical Reports - Events StrategyTechnical assessment · PDF | 22 Sept 2021 | View |
| * SUPL - Superseded Plan - Greengate Phase 2 Plot C Tower Level 42 PlanPlans · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - Section BBPlans · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - General Arrangement Podium Elevation Collier StreetPlans · PDF | 22 Sept 2021 | View |
| * LOCP - PL Location Plan - Greengate Phase 2 Plot C Location PlanPlans · PDF | 22 Sept 2021 | View |
| * TECH - PL Technical Reports - Daylight and Sunlight Existing Vs ProposedTechnical assessment · PDF | 22 Sept 2021 | View |
| * PLN10 - Landscaping Plans - Landscape Managment PlansPlans · PDF | 22 Sept 2021 | View |
| * CONS - PL Consultation Response - HighwaysConsultation response | 8 Nov 2021 | View |
| * SUPL - Superseded Plan - North ElevationPlans · PDF | 22 Sept 2021 | View |
| * SUPL - Superseded Plan - Greengate Phase 2 Plot C Typical Tower Plan Type 2Plans · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - PODIUM GROUND FLOOR PLAN rev. P05Plans · PDF | 21 Oct 2021 | View |
| * SUPL - Superseded Plan - Indicative Levels Falls & Drainage rev. P1Plans · PDF | 2 Nov 2021 | View |
| * PLN10 - Landscaping Plans - Indicative Levels Falls & Drainage rev. P2Plans · PDF | 23 Nov 2021 | View |
| * PLAN - PL Plans And Drawings - Tower Roof PlanPlans · PDF | 22 Sept 2021 | View |
| * SUPL - Superseded Plan - Basement 2 Floor Plan rev. P04Plans · PDF | 16 Nov 2021 | View |
| * SUPL - Superseded Plan - Greengate Phase 2 Plot C Basement 1 Floor PlanPlans · PDF | 22 Sept 2021 | View |
| * PLN10 - Landscaping Plans - Public Realm Proposals: TOPO Overlay rev. P2Plans · PDF | 23 Nov 2021 | View |
| * CONS - PL Consultation Response - Natural EnglandConsultation response · PDF | 12 Oct 2021 | View |
| * CONS - PL Consultation Response - GMAASConsultation response | 4 Oct 2021 | View |
| * PLAN - PL Plans And Drawings - Basement 1 Cycle Store Floor PlanPlans · PDF | 16 Nov 2021 | View |
| * DAAS - PL Design and Access Statement - Design and Access StatementDesign and Access Statement · PDF | 22 Sept 2021 | View |
| * SUPL - Superseded Plan - Greengate Phase 2 Plot C Ground Floor Plan Existing and Proposed LevelsPlans · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - Greengate Two C Typical Facade Bay Podium Facade Bay Study 01Plans · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - General Arrangement Podium Elevation Greengate StreetPlans · PDF | 22 Sept 2021 | View |
| * TECH - PL Technical Reports - Ventilation StrategyTechnical assessment · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - Section AAPlans · PDF | 22 Sept 2021 | View |
| * TR17 - Planning Statement - Application Revisions Cover LetterPlanning statement · PDF | 21 Oct 2021 | View |
| * SUPL - Superseded Plan - BASEMENT 3 FLOOR PLAN rev. P03Plans · PDF | 21 Oct 2021 | View |
| * PLAN - PL Plans And Drawings - Basement 3 Floor Plan rev. P04 (Final)Plans · PDF | 7 Dec 2021 | View |
| * PLAN - PL Plans And Drawings - Ground Floor Plan Existing and Proposed Levels rev. P02Plans · PDF | 7 Dec 2021 | View |
| * CONS - PL Consultation Response -Consultation response · PDF | 12 Nov 2021 | View |
| * PLAN - PL Plans And Drawings - General Arrangement Podium Elevation Bond Street and New Bond StreetPlans · PDF | 22 Sept 2021 | View |
| * CONS - PL Consultation Response - Environment AgencyConsultation response · PDF | 27 Oct 2021 | View |
| * CONS - PL Consultation Response - Design for SecurityConsultation response · PDF | 4 Oct 2021 | View |
| * PLAN - PL Plans And Drawings - NSL Contours existing consented vs proposedPlans · PDF | 22 Sept 2021 | View |
| * CONS - PL Consultation Response - HSEConsultation response | 26 Oct 2021 | View |
| * DAAS - PL Design and Access Statement - Design and Access Statement rev. 01Design and Access Statement · PDF | 26 Nov 2021 | View |
| * PLAN - PL Plans And Drawings - Greengate Phase 2 Plot C Refuse Strategy PlanPlans · PDF | 22 Sept 2021 | View |
| * CONS - PL Consultation Response - Historic EnglandConsultation response · PDF | 12 Oct 2021 | View |
| * APPL - PL Application Form - Covering LetterApplication form · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - Greengate Two C Typical Facade Bay Tower Facade Bay Study 01Plans · PDF | 22 Sept 2021 | View |
| * CONS - PL Consultation Response -Consultation response | 12 Nov 2021 | View |
| * TR07 - PL Environmental Impact Assessment - EIA TVIA ChapterEnvironmental Impact Assessment · PDF | 3 Dec 2021 | View |
| * SUPL - Superseded Plan - Basement 1 Floor Plan rev. P06Plans · PDF | 26 Nov 2021 | View |
| * SUPL - Superseded Plan - Greengate Phase 2 Plot C Podium Ground Floor PlanPlans · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - TYPICAL TOWER PLAN - TYPE 2 rev. P04Plans · PDF | 21 Oct 2021 | View |
| * SUPL - Superseded Plan - Greengate Plot C Public Realm ProposalsPlans · PDF | 22 Sept 2021 | View |
| * SUPL - Superseded Plan - Public Realm Proposals: TOPO Overlay rev. P1Plans · PDF | 2 Nov 2021 | View |
| * PLAN - PL Plans And Drawings - Greengate Two C Typical Facade Bay Podium Facade Bay Study 02Plans · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - General Arrangement Podium Elevation Collier Street GreengatePlans · PDF | 22 Sept 2021 | View |
| * TECH - PL Technical Reports - Tonscape and Visual Impact Assessment 6a1Technical assessment · PDF | 22 Sept 2021 | View |
| * TECH - PL Technical Reports - Air Quality EIA Technical NoteTechnical assessment · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - Basement 1 Floor Plan rev. P05 (Final)Plans · PDF | 7 Dec 2021 | View |
| * SUPL - Superseded Plan - Basement 3 Floor Plan rev. P05Plans · PDF | 26 Nov 2021 | View |
| * PLN9 - Site Plan - Greengate Phase 2 Plot C Greengate Development Site PlanPlans · PDF | 22 Sept 2021 | View |
| * TECH - PL Technical Reports - Residential Management StrategyTechnical assessment · PDF | 22 Sept 2021 | View |
| * TECH - PL Technical Reports - Sustainability and Energy StatementTechnical assessment · PDF | 22 Sept 2021 | View |
| * PLN9 - Site Plan - Greengate Phase 2 Plot C Greengate Development Site PlanPlans · PDF | 22 Sept 2021 | View |
| * CONS - PL Consultation Response - LandscapeConsultation response | 30 Nov 2021 | View |
| * PLAN - PL Plans And Drawings - West ElevationPlans · PDF | 22 Sept 2021 | View |
| * CONS - PL Consultation Response - Natural England (Request for info)Consultation response · PDF | 4 Oct 2021 | View |
| * TECH - PL Technical Reports - Transport EIA Technical NoteTechnical assessment · PDF | 22 Sept 2021 | View |
| * TECH - PL Technical Reports - Historic EIA Chapter updateTechnical assessment · PDF | 22 Sept 2021 | View |
| * REPT - Officer Report -Officer report | 3 Dec 2021 | View |
| * LOCP - PL Location Plan - Greengate Phase 2 Plot C Location PlanPlans · PDF | 22 Sept 2021 | View |
| * DECI - PL Decision Notice -Decision Notice · PDF | 2 Mar 2022 | View |
| * PLAN - PL Plans And Drawings - East ElevationPlans · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - Typical Facade Bay Tower Facade - Bay Study 03 rev. P02Plans · PDF | 27 Oct 2021 | View |
| * TECH - PL Technical Reports - Television Baseline Survey ReportTechnical assessment · PDF | 22 Sept 2021 | View |
| * TECH - PL Technical Reports - Noise and Vibration EIATechnical assessment · PDF | 22 Sept 2021 | View |
| * PLN10 - Landscaping Plans - Public Realm Proposals rev. P8Plans · PDF | 23 Nov 2021 | View |
| * PLAN - PL Plans And Drawings - Plot C Greengate 3D View existing consented vs proposedPlans · PDF | 22 Sept 2021 | View |
| * TR17 - Planning Statement - Planning StatementPlanning statement · PDF | 22 Sept 2021 | View |
| * TECH - PL Technical Reports - Construction Management and PhasingTechnical assessment · PDF | 22 Sept 2021 | View |
| * TECH - PL Technical Reports - Landscape Design StatementTechnical assessment · PDF | 22 Sept 2021 | View |
| * CONS - PL Consultation Response - SCC Flood Risk and DrainageConsultation response · PDF | 14 Oct 2021 | View |
| * TECH - PL Technical Reports - Gateway One Fire StatementTechnical assessment · PDF | 22 Sept 2021 | View |
| * SUPL - Superseded Plan - Tower Level 02 Floor PlanPlans · PDF | 22 Sept 2021 | View |
| * TECH - PL Technical Reports - Appendix 1a .1 Scoping ReportTechnical assessment · PDF | 22 Sept 2021 | View |
| * SUPL - Superseded Plan - Greengate Phase 2 Plot C Podium Level 01 Floor PlanPlans · PDF | 22 Sept 2021 | View |
| * SUPL - Superseded Plan - TOWER LEVEL 02 FLOOR PLAN rev. P04Plans · PDF | 21 Oct 2021 | View |
| * CONS - PL Consultation Response - Highways - Final CommentsConsultation response | 2 Dec 2021 | View |
| * APPL - PL Application Form - Application Form redactedApplication form · PDF | 22 Sept 2021 | View |
| * SUPL - Superseded Plan - Plot C Greengate Planting PlanPlans · PDF | 22 Sept 2021 | View |
| * PLAN - PL Plans And Drawings - North Elevation rev. P03Plans · PDF | 21 Oct 2021 | View |
| * CONS - PL Consultation Response - Manchester AirportConsultation response · PDF | 15 Oct 2021 | View |
| * PLAN - PL Plans And Drawings - Plot C Greengate 3D View existing consented vs proposedPlans · PDF | 22 Sept 2021 | View |
| * CONS - PL Consultation Response - Highways - Car Parking IncreaseConsultation response | 2 Dec 2021 | View |
| * TECH - PL Technical Reports - Solarglare AssessmentTechnical assessment · PDF | 22 Sept 2021 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.