Council planning record

Request for confirmation of compliance of conditions 6 (surface water drainage),7 (Radar Mitigation Scheme), 8 (Construction Method Statement),10 (noise mitigation scheme),17 (Metrolink Hazard Zone),18 (Metrolink noise and vibration) and 20 (Metrolink overhead infrastructure) attached to planning permission 19/74069/OUT

Gateway Building , 5 Anchorage Quay, Salford, M50 3XE

Decision MadeReference: 20/76589/DISCONSalford City Council

Last published check: 3 Oct 2026, 18:37. Check the council record for more recent changes.

Application location

Gateway Building , 5 Anchorage Quay, Salford, M50 3XE

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Approval of details reserved by a condition
Received
Not published
Validated
11 Dec 2020
Determination deadline
Not published
Local authority
Salford City Council

Application overview

Request for confirmation of compliance of conditions 6 (surface water drainage),7 (Radar Mitigation Scheme), 8 (Construction Method Statement),10 (noise mitigation scheme),17 (Metrolink Hazard Zone),18 (Metrolink noise and vibration) and 20 (Metrolink overhead infrastructure) attached to planning permission 19/74069/OUT

Proposal details

Reference
20/76589/DISCON
Ward
Ordsall Ward

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 23 of 23

DocumentPublishedAction
* CONS - PL Consultation Response - AQNCL Air Quality Noise Contaminated LandConsultation response · PDF15 Jan 2021View
* CONS - PL Consultation Response -Consultation response29 Jan 2021View
* PLAN - PL Plans And Drawings - 1808-05-SK-201102-01 Metrolink Posts General ArrangementPlans · PDF21 Dec 2020View
* APPL - PL Application Form - 25948-PTM3-MFH-R0 Planning Condition Discharge MemoApplication form · PDF21 Dec 2020View
* CONS - PL Consultation Response - BCDRA DrainageConsultation response · PDF11 Jan 2021View
* TECH - PL Technical Reports - Full Construction Management Plan Rev 2(1).Technical assessment · PDF21 Dec 2020View
* APPL - PL Application Form - Application Form RedactedApplication form · PDF21 Dec 2020View
* TECH - PL Technical Reports - Full Construction Management Plan Rev 2Technical assessment · PDF21 Dec 2020View
* TECH - PL Technical Reports - Appendix C - 14-0275 Working Safely with Metrolink Leaflet_WEBTechnical assessment · PDF21 Dec 2020View
* CONS - PL Consultation Response - uuConsultation response · PDF16 Feb 2021View
* TECH - PL Technical Reports - Full Construction Management Plan Rev 2(1)Technical assessment · PDF21 Dec 2020View
* TECH - PL Technical Reports - Full Construction Management Plan Rev 2Technical assessment · PDF21 Dec 2020View
* PLAN - PL Plans And Drawings - 1808-05-SK-201102-01 Metrolink Posts General ArrangementPlans · PDF21 Dec 2020View
* CONS - PL Consultation Response -Consultation response29 Jan 2021View
* TECH - PL Technical Reports - Appendix C - 14-0275 Working Safely with Metrolink Leaflet_WEBTechnical assessment · PDF21 Dec 2020View
* CONS - PL Consultation Response -Consultation response29 Jan 2021View
* DECI - PL Decision Notice -Decision Notice29 Jan 2021View
* CONS - PL Consultation Response - 76589 UU United Utilities DC-21-41Consultation response · PDF25 Jan 2021View
* CONS - PL Consultation Response -Consultation response29 Jan 2021View
* TR08 - PL Flood Risk Assessment - 1808-05 Anchorage Gateway Outline Drainage Strategy Rev 00Technical assessment · PDF21 Dec 2020View
* APPL - PL Application Form - Metrolink Letter - Condition 17 and 20Application form · PDF21 Dec 2020View
* TR08 - PL Flood Risk Assessment - 1808-05 Anchorage Gateway Outline Drainage Strategy Rev 00Technical assessment · PDF21 Dec 2020View
* APPL - PL Application Form - Covering Letter_Nov 2020_Package 1 OUTApplication form · PDF21 Dec 2020View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid Date

    Published milestoneCouncil source
  2. Decision date

    Published milestoneCouncil source

Decision & conditions

Condition Request determined
* DECI - PL Decision Notice -
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.