Council planning record

Erection of 7-storey office building (Use Class B1a) and formation of parking area within railway arches and pedestrian link between New Bailey and Gore Street, means of access, landscaping, together with ancillary facilities, servicing and public realm, associated localised repair and redecoration of the Southern Railway Viaduct (Grade II* Listed)

Plot 1 New Bailey / Plots B2/B3 Salford Central Masterplan At Land Southwest New Bailey Street And Southeast Salford Central Station

Decision MadeReference: 18/71824/LBCSalford City Council

Last published check: 11 Oct 2026, 01:10. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid Date

    Published milestoneCouncil source
  2. Decision date

    Published milestoneCouncil source

Application summary

Status
Decision Made
Application type
Listed Building Consent
Received
Not published
Validated
23 May 2018
Determination deadline
Not published
Local authority
Salford City Council

Application overview

Erection of 7-storey office building (Use Class B1a) and formation of parking area within railway arches and pedestrian link between New Bailey and Gore Street, means of access, landscaping, together with ancillary facilities, servicing and public realm, associated localised repair and redecoration of the Southern Railway Viaduct (Grade II* Listed)

Proposal details

Reference
18/71824/LBC
Ward
Ordsall Ward
Agent
Ms Tamara Ettenfield

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Plot 1 New Bailey / Plots B2/B3 Salford Central Masterplan At Land Southwest New Bailey Street And Southeast Salford Central Station

This record has no verified map location.

Documents 62 of 62

DocumentPublishedAction
* PLN4 – PROPOSED ELEVATIONS - Proposed North West PA2200 ElevationPlans · PDF25 May 2018View
* PLN6 – PROPOSED PLANS - Proposed Section AA PA2300Plans · PDF25 May 2018View
* CONS - PL Consultation Response - Network Rail ConsultationConsultation response · PDF14 Jun 2018View
* PLAN - PL Plans And Drawings - HED.1319.203.Levels Strategy-for PlanningPlans · PDF25 May 2018View
* DAAS - PL Design and Access Statement - B2-B3-Design-and-Access-Statement-MAKE-pages-12-20Design and Access Statement · PDF25 May 2018View
* PLN4 – PROPOSED ELEVATIONS - Proposed South West Elevation PA2203Plans · PDF25 May 2018View
* PLAN - PL Plans And Drawings - North East Elevation Contextual PA2101Plans · PDF25 May 2018View
* DAAS - PL Design and Access Statement - B2-B3-Design-and-Access-Statement-MAKE-pages-21-34Design and Access Statement · PDF25 May 2018View
* TR10 - PL Heritage Assessment - B2-B3 Planning and Heritage Statement R001m v2Technical assessment · PDF25 May 2018View
* TECH - PL Technical Reports - B2-B3 Phase 1 Geo-Environmental Investigation Report (Oct 2016) No AppendicesTechnical assessment · PDF25 May 2018View
* DAAS - PL Design and Access Statement - B2-B3-Design-and-Access-Statement-MAKE-pages-67-78Design and Access Statement · PDF25 May 2018View
* CONS - PL Consultation Response - GMAU ConsultationConsultation response · PDF19 Jun 2018View
* PLN6 – PROPOSED PLANS - P1NB-CUN-ZZ-XX-DR-C-0010 Proposed Drainage LayoutPlans · PDF25 May 2018View
* DECI - PL Decision Notice -Decision Notice20 Jul 2018View
* PLN6 – PROPOSED PLANS - P1NB-CUN-ZZ-XX-DR-C-0040 Proposed External Works LayoutPlans · PDF25 May 2018View
* DAAS - PL Design and Access Statement - B2-B3-Design-and-Access-Statement-MAKE-pages-35-66Design and Access Statement · PDF25 May 2018View
* PLN10 - Landscaping Plans - HED.1319.102.Illustrative Landscape Plan-For Planning - A3Plans · PDF25 May 2018View
* PLN2 – PROPOSED FLOOR PLANS - Proposed Ground Floor PA2000Plans · PDF25 May 2018View
* CONS - PL Consultation Response -Consultation response15 Jun 2018View
* TECH - PL Technical Reports - CPA-TCIG-Tower-Cranes-Alongside-Railways-Published-DocumentTechnical assessment · PDF14 Jun 2018View
* TR10 - PL Heritage Assessment - B2-B3 Planning and Heritage Statement R001m v2(1)Technical assessment · PDF25 May 2018View
* TECH - PL Technical Reports - B2-B3 Archaeology Written Scheme of Investigation 2018 WSIv 2.0Technical assessment · PDF25 May 2018View
* TECH - PL Technical Reports - B2-B3 Submitted Drawing Schedule v1Technical assessment · PDF25 May 2018View
* TR03 - PL Biodiversity Survey/Report - B2-B3 Preliminary Ecological AssessmentTechnical assessment · PDF25 May 2018View
* REPT - Officer Report -Officer report22 Jun 2018View
* TR28 - PL Travel Plan - B2-B3 ITP Travel Plan-compressedTechnical assessment · PDF25 May 2018View
* TECH - PL Technical Reports - B2-B3 Ground Gas Risk Assessment (Jan 2017)Technical assessment · PDF25 May 2018View
* PLAN - PL Plans And Drawings - Typical Floor Plan level PA2002Plans · PDF25 May 2018View
* PLN2 – PROPOSED FLOOR PLANS - Proposed Ground Floor PA2000Plans · PDF25 May 2018View
* DAAS - PL Design and Access Statement - B2-B3-Design-and-Access-Statement-MAKE-pages 1-11Design and Access Statement · PDF25 May 2018View
* TR27 - PL Transport Assessment - B2-B3 TS Transport Statement-compressedTechnical assessment · PDF25 May 2018View
* LOCP - PL Location Plan - Location Plan PA0100 (2)Plans · PDF25 May 2018View
* TR07 - PL Environmental Impact Assessment - B2-B3 ES Environmental Statement Review May 2018 R002m V2Environmental Impact Assessment · PDF25 May 2018View
* TR08 - PL Flood Risk Assessment - B2-B3 Flood Risk Assessment-compressedTechnical assessment · PDF25 May 2018View
* DAAS - PL Design and Access Statement - B2-B3-Design-and-Access-Statement-MAKE-pages-79-86Design and Access Statement · PDF25 May 2018View
* PLAN - PL Plans And Drawings - South East Elevation Contextual PA2102Plans · PDF25 May 2018View
* PLAN - PL Plans And Drawings - Existing and Proposed Elevation Gore PA2121Plans · PDF25 May 2018View
* PLAN - PL Plans And Drawings - Roof Plan PA2010Plans · PDF25 May 2018View
* PLAN - PL Plans And Drawings - Arches Section and Plan PA2120Plans · PDF25 May 2018View
* LOCP - PL Location Plan - Location Plan PA0100Plans · PDF25 May 2018View
* PLAN - PL Plans And Drawings - South West Elevation Contextual PA2103Plans · PDF25 May 2018View
* TECH - PL Technical Reports - B2-B3 Phase 2 Environmental Ground Investigation Report (Dec 2016) No AppendicesTechnical assessment · PDF25 May 2018View
* PLN2 – PROPOSED FLOOR PLANS - Proposed First Floor PA2001Plans · PDF25 May 2018View
* PLN6 – PROPOSED PLANS - Proposed Site Plan PA0300Plans · PDF25 May 2018View
* TR24 - PL Sustainability Checklist - B2-B3 Energy and Sustainability StatementTechnical assessment · PDF25 May 2018View
* TECH - PL Technical Reports - B2-B3 Wind AssessmentTechnical assessment · PDF25 May 2018View
* PLN6 – PROPOSED PLANS - P1NB-CUN-ZZ-XX-DR-C-0030 Proposed External Works DetailsPlans · PDF25 May 2018View
* PLAN - PL Plans And Drawings - HED.1319.204.Edges and Boundaries-for PlanningPlans · PDF25 May 2018View
* PLN10 - Landscaping Plans - HED.1319.202.Planting Plan-for PlanningPlans · PDF25 May 2018View
* TR04 - PL Crime Prevention Plan - B2-B3 Crime Impact Statement 18-0251 New Bailey StreetTechnical assessment · PDF25 May 2018View
* CONS - PL Consultation Response - DrainageConsultation response12 Jun 2018View
* PLN4 – PROPOSED ELEVATIONS - Proposed South East Elevation PA2202Plans · PDF25 May 2018View
* PLAN - PL Plans And Drawings - North West Elevation Contextual PA2100Plans · PDF25 May 2018View
* PLAN - PL Plans And Drawings - Sewer Records OS Sheet SJ8398SW 22.11.17Plans · PDF25 May 2018View
* PLN6 – PROPOSED PLANS - Proposed Section BB PA2301Plans · PDF25 May 2018View
* TECH - PL Technical Reports - Development Questionnaire - Asset Protection LNWTechnical assessment14 Jun 2018View
* PLAN - PL Plans And Drawings - Masterplan PA0200Plans · PDF25 May 2018View
* APPL - PL Application Form - Application Form No Personal DataApplication form · PDF25 May 2018View
* TECH - PL Technical Reports - B2-B3 Geotechnical Ground Investigation Report (Dec 2016)Technical assessment · PDF25 May 2018View
* DAAS - PL Design and Access Statement - B2-B3-Landscape Design and Access HEDDesign and Access Statement · PDF25 May 2018View
* TECH - PL Technical Reports - CPA-TCIG-Tower-Cranes-Alongside-Railways-Published-DocumentTechnical assessment · PDF14 Jun 2018View
* PLAN - PL Plans And Drawings - HED.1319.201.General Arrangement-for PlanningPlans · PDF25 May 2018View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
* DECI - PL Decision Notice -
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.