Council planning record

Discharge of condition 6 (Highway construction details), 12 (Foul and surface water drainage scheme), 13 (Environmental Noise Assessment), 26 (Electric Vehicle Charging Points) from planning application 18/02806/OUT

Land North Of Nottingham Road Radcliffe On Trent Nottinghamshire

Not publishedReference: 26/00248/DISCONRushcliffe Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Not published
Application type
Discharge of Condition(s)
Received
9 Feb 2026
Validated
10 Feb 2026
Determination deadline
7 Apr 2026
Local authority
Rushcliffe Borough Council

Application overview

Discharge of condition 6 (Highway construction details), 12 (Foul and surface water drainage scheme), 13 (Environmental Noise Assessment), 26 (Electric Vehicle Charging Points) from planning application 18/02806/OUT

Proposal details

Reference
26/00248/DISCON
Ward
Radcliffe On Trent
Parish
Radcliffe On Trent

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land North Of Nottingham Road Radcliffe On Trent Nottinghamshire

This record has no verified map location.

View council map

Documents 52 of 52

DocumentPublishedAction
ENVIRONMENTAL HEALTHConsultee Comment · PDF8 Sept 2026View
NCC HIGHWAYSConsultee Responses5 Aug 2026View
RBC ECOLOGYConsultee Responses · PDF18 May 2026View
NCC FLOOD RISKConsultee Comment · PDF11 May 2026View
PHASE 1 GEO ENVIRONMENTAL REPORTOther · PDF7 Apr 2026View
HEALTH AND SAFETYApplication File Papers · PDF7 Apr 2026View
COMMERCIAL AREA QBARPlans · PDF7 Apr 2026View
PH2 QBARPlans · PDF7 Apr 2026View
STORM NET1 2YRApplication File Papers · PDF7 Apr 2026View
STORM NET1 30YRApplication File Papers · PDF7 Apr 2026View
STORM NET1 100YR + CCApplication File Papers · PDF7 Apr 2026View
PH2 ENGINEERING LAYOUTPlans · PDF7 Apr 2026View
PH2 ROAD AND SEWER SECTIONSPlans · PDF7 Apr 2026View
PH2 SECTION 104 LAYOUTPlans · PDF7 Apr 2026View
PH2 SECTION 104 LAYOUTPlans · PDF7 Apr 2026View
EXTERNAL WORKS AND DRAINAGE PLOTS 147-171Plans · PDF7 Apr 2026View
EXTERNAL WORKS AND DRAINAGE PLOTS 172-182 195-200Plans · PDF7 Apr 2026View
EXTERNAL WORKS AND DRAINAGE PLOTS 183-194Plans · PDF7 Apr 2026View
EXTERNAL WORKS AND DRAINAGE PLOTS 201-212Plans · PDF7 Apr 2026View
EXTERNAL WORKS AND DRAINAGE PLOTS 103-124 137-146Plans · PDF7 Apr 2026View
EXTERNAL WORKS AND DRAINAGE PLOTS 125-136Plans · PDF7 Apr 2026View
LOCATION PLANPlans · PDF7 Apr 2026View
PH2 OVERLAND FLOW ROUTE (EXCEEDANCE)Plans · PDF7 Apr 2026View
FLOOD RISK ASSESSMENT JUNE 2020Flood Risk Assessment · PDF7 Apr 2026View
DESIGN DRAWINGPlans · PDF7 Apr 2026View
HACKETT GRANGE - WELCOME PACKApplication File Papers · PDF7 Apr 2026View
NCC FLOOD RISKConsultee Responses · PDF16 Feb 2026View
NATIONAL HIGHWAYSConsultee Responses · PDF12 Feb 2026View
ENVIRONMENT AGENCYConsultee Responses · PDF12 Feb 2026View
APPLICATIONFORMREDACTEDApplication Form · PDF6 Feb 2026View
ENGINEERING LAYOUTPlans · PDF6 Feb 2026View
HIGHWAY STANDARD DETAILS (SHEET 1 OF 2)Plans · PDF6 Feb 2026View
HIGHWAY STANDARD DETAILS (SHEET 2OF2)Plans · PDF6 Feb 2026View
PAVEMENTS AND KERBINGPlans · PDF6 Feb 2026View
STANDARD SEWER DETAILSPlans · PDF6 Feb 2026View
POND OUTLET HEADWALL S214 S222 SFA11B HEADWALLPlans · PDF6 Feb 2026View
EXTERNAL WORKS AND BUILDING DRAINAGE PLOTS 147-171Plans · PDF6 Feb 2026View
EXTERNAL WORKS AND BUILDING DRAINAGE PLOTS 172-182 PLUS 195-200Plans · PDF6 Feb 2026View
EXTERNAL WORKS AND BUILDING DRAINAGE PLOTS 183-194Plans · PDF6 Feb 2026View
EXTERNAL WORKS AND BUILDING DRAINAGE PLOTS 201-212Plans · PDF6 Feb 2026View
EXTERNAL WORKS AND BUILDING DRAINAGE PLOTS 103-124 PLUS 137-146Plans · PDF6 Feb 2026View
EXTERNAL WORKS AND BUILDING DRAINAGE PLOTS 125-136Plans · PDF6 Feb 2026View
DRAINAGE AREA PLANPlans · PDF6 Feb 2026View
GULLY AREA PLANPlans · PDF6 Feb 2026View
ROAD AND SEWER SECTIONSPlans · PDF6 Feb 2026View
ROAD AND SEWER SECTIONSPlans · PDF6 Feb 2026View
ROAD AND SEWER SECTIONSPlans · PDF6 Feb 2026View
STORM MANHOLE SCHEDULEPlans · PDF6 Feb 2026View
FOUL MANHOLE SCHEDULEPlans · PDF6 Feb 2026View
ENVIRONMENT NOISE STUDYNoise Report · PDF6 Feb 2026View
SITE LAYOUT PHASE 2Plans · PDF6 Feb 2026View
CLOVER LETTERCovering Letter · PDF6 Feb 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Not published
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.