Council planning record

Hybrid planning application comprising: (1) Full planning application for a first phase of residential development for 380 dwellings with associated access from Tollerton Lane, partial demolition of the runway, drainage, open space and associated infrastructure works; and (2) Outline planning permission (all matters reserved) for a phased residential development at Tollerton Airfield comprising demolition of existing buildings and runway, development of dwellings, a primary school, neighbourhood centre (Use Classes C3, E, F2) and supporting infrastructure including accesses from Tollerton Lane and A52, an active travel bridge over the A52, open space, sports pitches, green and blue infrastructure and other supporting infrastructure including a primary substation and foul drainage works.

Land North Of Tollerton Tollerton Lane Tollerton Nottinghamshire

Not publishedReference: 24/00347/HYBRIDRushcliffe Borough Council

Last published check: 10 Oct 2026, 03:25. Check the council record for more recent changes.

Application location

Land North Of Tollerton Tollerton Lane Tollerton Nottinghamshire

This record has no verified map location.

View council map

Application summary

Status
Not published
Application type
Hybrid of two or more application types
Received
29 Feb 2024
Validated
11 Mar 2024
Determination deadline
1 Jul 2024
Local authority
Rushcliffe Borough Council

Application overview

Hybrid planning application comprising: (1) Full planning application for a first phase of residential development for 380 dwellings with associated access from Tollerton Lane, partial demolition of the runway, drainage, open space and associated infrastructure works; and (2) Outline planning permission (all matters reserved) for a phased residential development at Tollerton Airfield comprising demolition of existing buildings and runway, development of dwellings, a primary school, neighbourhood centre (Use Classes C3, E, F2) and supporting infrastructure including accesses from Tollerton Lane and A52, an active travel bridge over the A52, open space, sports pitches, green and blue infrastructure and other supporting infrastructure including a primary substation and foul drainage works.

Proposal details

Reference
24/00347/HYBRID
Ward
Tollerton
Parish
Tollerton
Agent
James Bonner

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 417 of 417

DocumentPublishedAction
ACTIVE TRAVELConsultee Comment · PDF9 Oct 2026View
ATTACHMENTS TO CITY HIGHWAYS CLARIFCATION 1Consultee Responses · PDF8 Oct 2026View
ATTACHMENTS TO CITY HIGHWAYS CLARIFICATION 2Consultee Responses · PDF8 Oct 2026View
ATTACHMENTS TO CITY HIGHWAYS CLARIFICATION 3Consultee Responses · PDF8 Oct 2026View
ATTACHMENTS TO CITY HIGHWAYS CLARIFICATION 4Consultee Responses · PDF8 Oct 2026View
NOTTINGHAM CITY HIGHWAYS CLARIFICATIONConsultee Responses · PDF8 Oct 2026View
RAMBLERSConsultee Responses5 Oct 2026View
AERODROME SAFEGUARDINGConsultee Comment · PDF1 Oct 2026View
ARCHAEOLOGICAL ADVISORConsultee Comment · PDF1 Oct 2026View
CITY HIGHWAYSConsultee Responses · PDF30 Sept 2026View
EHO COMMENTSConsultee Responses · PDF30 Sept 2026View
SPORT ENGLANDConsultee Responses · PDF30 Sept 2026View
ENVIRONMENT AGENCYConsultee Responses · PDF29 Sept 2026View
SUB-STATIONPlans (proposed) · PDF29 Sept 2026View
ENVIRONMENTAL SUSTAINABILITY OFFICERConsultee Responses · PDF28 Sept 2026View
HISTORIC ENGLAND CLARIFICATIONConsultee Responses24 Sept 2026View
PLANNING POLICY AND AFFORDABLE HOUSINGConsultee Comment · PDF24 Sept 2026View
NATURAL ENGLANDConsultee Comment · PDF23 Sept 2026View
NATURAL ENGLANDConsultee Comment · PDF23 Sept 2026View
NATURAL ENGLANDConsultee Responses · PDF23 Sept 2026View
DEBBIE TAYLORNeighbour Responses · PDF22 Sept 2026View
COUNCILLOR JONATHAN WHEELERWard Member & Parish Responses · PDF22 Sept 2026View
NATIONAL GRIDConsultee Responses · PDF21 Sept 2026View
EMERGENCY PLANNINGConsultee Comment · PDF18 Sept 2026View
HISTORIC ENGLANDConsultee Comment · PDF17 Sept 2026View
Utilities ReportUtilities Report · PDF17 Sept 2026View
CANAL AND RIVERS TRUSTConsultee Comment · PDF17 Sept 2026View
NATIONAL HIGHWAYSConsultee Responses · PDF16 Sept 2026View
NCC FLOOD RISKConsultee Responses · PDF14 Sept 2026View
ADAM MELDRUMNeighbour Responses · PDF14 Sept 2026View
LLFAConsultee Comment · PDF14 Sept 2026View
POS DETAILS SHEET 2Plans · PDF11 Sept 2026View
LANDSCAPE OFFICER COMMENTSConsultee Comment · PDF11 Sept 2026View
ARBORICULTURE ASSESSMENTRevised Plan · PDF10 Sept 2026View
CITY POLICY PLANNINGConsultee Comment7 Sept 2026View
COAL AUTHORITYConsultee Comment · PDF7 Sept 2026View
NATIONAL HIGHWAYSConsultee Comment · PDF4 Sept 2026View
COAL AUTHORITYConsultee Responses · PDF3 Sept 2026View
DRAFT IDP TABLEOther · PDF2 Sept 2026View
TOLLERTON ESS FIGURE 3.2 LAND USE AND ACCESS PARAMETER PLANApplication File Papers · PDF24 Aug 2026View
TOLLERTON ESS APPENDIX 4.1 ECOLOGY TECHNICAL NOTEApplication File Papers · PDF24 Aug 2026View
TOLLERTON ESS FIGURE 3.1 COMPOSITE SITE LAYOUT PLANApplication File Papers · PDF24 Aug 2026View
POS DETAILS SHEET 3Plans · PDF24 Aug 2026View
TOLLERTON ESS APPENDIX 13.3 CLIMATE PROJECTIONS DATAApplication File Papers · PDF24 Aug 2026View
TOLLERTON ESS FIGURE 3.4 OPEN SPACE PARAMETERS PLANPlans · PDF24 Aug 2026View
TOLLERTON ESS CHAPTER 013 CLIMATE CHANGEApplication File Papers · PDF24 Aug 2026View
TOLLERTON ESS APPENDIX 11.1A TRANSPORT ASSESSMENT ADDENDUMApplication File Papers · PDF24 Aug 2026View
COLOURED LAYOUTPlans · PDF24 Aug 2026View
POS DETAILSPlans · PDF24 Aug 2026View
TOLLERTON ESS APPENDIX 11.2 RESIDENTIAL TRAVEL PLANApplication File Papers · PDF24 Aug 2026View
IDP PHASING PLANPlans · PDF24 Aug 2026View
TOLLERTON ESS APPENDIX 13.1 CLIMATE CHANGE POLICYApplication File Papers · PDF24 Aug 2026View
FLOOD RISK ASSESSMENT (AMENDED)Flood Risk Assessment · PDF24 Aug 2026View
TOLLERTON ESS APPENDIX 4.3 ROAD TRAFFIC NOISE REVIEW TECHNICAL NOTEApplication File Papers · PDF24 Aug 2026View
STREET SCENESPlans · PDF24 Aug 2026View
TOLLERTON ESS FIGURE 3.3 BUILDING HEIGHTS PARAMETERS PLANPlans · PDF24 Aug 2026View
TOLLERTON ESS FIGURE 1.1 SITE LOCATION PLANApplication File Papers · PDF24 Aug 2026View
ENVIRONMENTAL IMPACT ASSESSMENT - ENVIRONMENTAL SUPPLEMENT REPORTApplication File Papers · PDF24 Aug 2026View
TOLLERTON ESS CHAPTER 006 POPULATION AND HUMAN HEALTHApplication File Papers · PDF24 Aug 2026View
TOLLERTON ESS APPENDIX 10.1 FLOOD RISK ASSESSMENTFlood Risk Assessment · PDF24 Aug 2026View
TOLLERTON ESS APPENDIX 4.2 ROAD TRAFFIC REVIEW TECHNICAL NOTEApplication File Papers · PDF24 Aug 2026View
HOUSE TYPE BROCHUREPlans · PDF14 Aug 2026View
COMPOSITE SITE LAYOUTPlans · PDF14 Aug 2026View
PARKING PLAN-(SHEET 1 OF 4)Plans · PDF14 Aug 2026View
-PARKING PLAN-(SHEET 2 OF 4)Plans · PDF14 Aug 2026View
PARKING PLAN-(SHEET 3 OF 4)Plans · PDF14 Aug 2026View
PARKING PLAN-(SHEET 4 OF 4)Plans · PDF14 Aug 2026View
GARDEN AREA PLANPlans · PDF14 Aug 2026View
MASSING PLAN- (2)Plans · PDF14 Aug 2026View
OCCUPANCY PLANPlans · PDF14 Aug 2026View
CHARACTER AREA PLANPlans · PDF14 Aug 2026View
TENURE PLANPlans · PDF14 Aug 2026View
ENCLOSURES PLANPlans · PDF14 Aug 2026View
CYCLE BRIDGE OP1Plans · PDF14 Aug 2026View
CYCLE BRIDGE OP2Plans · PDF14 Aug 2026View
CYCLE BRIDGE OP3Plans · PDF14 Aug 2026View
OFF-SITE ACTIVE TRAVEL - ROUTE 1 & 2 SHEET 1 OF 4.Plans · PDF14 Aug 2026View
OFF-SITE ACTIVE TRAVEL - ROUTE 1 & 2 SHEET 2 OF 4Plans · PDF14 Aug 2026View
OFF-SITE ACTIVE TRAVEL - ROUTE 1 & 2 SHEET 3 OF 4Plans · PDF14 Aug 2026View
OFF-SITE ACTIVE TRAVEL - ROUTE 1 & 2 SHEET 4 OF 4Plans · PDF14 Aug 2026View
OFF-SITE ACTIVE TRAVEL - ROUTE 3 & 4 SHEET 1 OF 5Plans · PDF14 Aug 2026View
OFF-SITE ACTIVE TRAVEL - ROUTE 3 & 4 SHEET 2 OF 5Plans · PDF14 Aug 2026View
OFF-SITE ACTIVE TRAVEL - ROUTE 3 & 4 SHEET 3 OF 5Plans · PDF14 Aug 2026View
OFF-SITE ACTIVE TRAVEL - ROUTE 3 & 4 SHEET 4 OF 5Plans · PDF14 Aug 2026View
OFF-SITE ACTIVE TRAVEL - ROUTE 3 & 4 SHEET 5 OF 5Plans · PDF14 Aug 2026View
OVERVIEW PLANPlans · PDF14 Aug 2026View
COMBINED PROPOSALSPlans · PDF14 Aug 2026View
GA JUNCTION 1Plans · PDF14 Aug 2026View
GA JUNCTION 2, 3 AND 4 ACCESSPlans · PDF14 Aug 2026View
GA JUNCTION 4 INTERIM ACCESSPlans · PDF14 Aug 2026View
TRAVEL PLANPlans · PDF14 Aug 2026View
RED LINE SITE LOCATION PLANPlans · PDF14 Aug 2026View
OPEN SPACE PARAMETERS PLANPlans · PDF14 Aug 2026View
KEY STRUCTURING ELEMENTS PLANPlans · PDF14 Aug 2026View
BUILDING HEIGHTS PARAMETERS PLANPlans · PDF14 Aug 2026View
LAND USE AND ACCESS PARAMETER PLANPlans · PDF14 Aug 2026View
RESIDENTIAL DENSITY PARAMETER PLANPlans · PDF14 Aug 2026View
PUBLIC TRANSPORT PLANPlans · PDF14 Aug 2026View
LANDSCAPE CHARACTER AREAS PLANPlans · PDF14 Aug 2026View
PHASING PLANPlans · PDF14 Aug 2026View
DEMOLITION PLANPlans · PDF14 Aug 2026View
SITE WIDE DESIGN CODEPlans · PDF14 Aug 2026View
TOLLERTON WCHAR ASSESSMENT REPORTApplication File Papers · PDF14 Aug 2026View
RESIDENTIAL TRAVEL PLAN REV A FINALTravel Plan · PDF14 Aug 2026View
GENERAL ARANGEMENTPlans · PDF14 Aug 2026View
ON-SITE GENERAL ARRANGEMENTPlans · PDF14 Aug 2026View
SWEPT PATH ANALYSIS SHEET 1 OF 6.Plans · PDF14 Aug 2026View
SWEPT PATH ANALYSIS SHEET 2 OF 6.Plans · PDF14 Aug 2026View
SWEPT PATH ANALYSIS SHEET 3 OF 6.Plans · PDF14 Aug 2026View
TOLLERTON LANE JUNCTION SWEPT PATH ANALYSISPlans · PDF14 Aug 2026View
SWEPT PATH ANALYSIS SHEET 4 OF 6.Plans · PDF14 Aug 2026View
SWEPT PATH ANALYSIS SHEET 5 OF 6Plans · PDF14 Aug 2026View
SWEPT PATH ANALYSIS SHEET 6 OF 6Plans · PDF14 Aug 2026View
INTERNAL VISIBILITY SPLAYPlans · PDF14 Aug 2026View
PROPOSED SIGNALISED JUNCTION DRAFTPlans · PDF14 Aug 2026View
PROPOSED HIGHWAY BOUNDARYPlans · PDF14 Aug 2026View
ALLOCATION LAND USE PLAN-03Plans · PDF14 Aug 2026View
FACING MATERIALSPlans · PDF14 Aug 2026View
EXTENDED PRELIMINARY GEO-ENVIRONMENTAL RISK ASSESSMENTApplication File Papers · PDF14 Aug 2026View
CUMULATIVE ADDENDUM TA AUGUST 26Application File Papers · PDF14 Aug 2026View
INDICATIVE PRIMARY SUBSTATION ELEVATION DRAWINGPlans · PDF14 Aug 2026View
OVERALL LANDSCAPE MASTERPLANPlans · PDF14 Aug 2026View
LANDSCAPE MASTERPLAN WESTPlans · PDF14 Aug 2026View
LANDSCAPE MASTERPLAN EASTPlans · PDF14 Aug 2026View
EXTRACTED LANDSCAPE DETAILS VARPlans · PDF14 Aug 2026View
TOLL TEMP ACCESSPlans · PDF14 Aug 2026View
PLANNING STATEMENT ADDENDUM 2 (AUGUST 2026) UPDATEDPlanning Statement · PDF14 Aug 2026View
NCC POLICYConsultee Responses · PDF27 Jul 2026View
EAST MIDLANDS COMBINED COUNTY AUTHORITYConsultee Responses · PDF4 Jun 2026View
MRS TOLLERTON PARISH COUNCILConsultee Comment · PDF4 Jun 2026View
CANAL AND RIVER TRUSTConsultee Comment · PDF1 Jun 2026View
HISTORIC ENGLANDConsultee Comment · PDF26 May 2026View
DR NOTTINGHAMSHIRE COUNTY COUNCIL HIGHWAYSConsultee Comment · PDF21 May 2026View
NCC ACRHAEOLOGYConsultee Responses · PDF18 May 2026View
CANAL AND RIVER TRUSTConsultee Comment · PDF18 May 2026View
MRS JULIA BARNES, PARISH CLERKConsultee Comment · PDF17 May 2026View
RESPONSE FROM NCC PLANNING STRATEGY AND GEOGRAPHIC INFORMATIONApplication Form · PDF15 May 2026View
RESPONSE FROM NCC PLANNING STRATEGY AND GEOGRAPHIC INFORMATIONApplication Form · PDF15 May 2026View
EMERGENCY PLANNERConsultee Responses · PDF15 May 2026View
MR ENVIRONMENTAL HEALTHConsultee Comment · PDF13 May 2026View
OBJECTION - MR & MRS LEECHPublic Comment · PDF12 May 2026View
ACTIVE TRAVEL ENGLAND PLANNINGConsultee Responses · PDF7 May 2026View
NATIONAL GRIDConsultee Responses · PDF7 May 2026View
SPORT ENGLANDConsultee Responses · PDF6 May 2026View
COUNCILLOR JONATHAN WHEELERWard Member & Parish Responses · PDF6 May 2026View
NOTTS POLICEConsultee Comment · PDF6 May 2026View
CANAL AND RIVERS TRUSTConsultee Comment · PDF6 May 2026View
ENVIRONMENTAL AGENCYConsultee Comment · PDF5 May 2026View
MR PUBLIC RIGHTS OF WAY NCCConsultee Comment · PDF29 Apr 2026View
NCC FLOOD RISKConsultee Comment · PDF27 Apr 2026View
COAL AUTHORITYConsultee Responses · PDF17 Apr 2026View
HIGHWAYS ENGLANDConsultee Responses · PDF17 Apr 2026View
EAST MIDLANDS AIRPORTConsultee Responses · PDF17 Apr 2026View
COLOUR LAYOUT (2)Plans · PDF10 Apr 2026View
STREET SCENES (2)Plans · PDF10 Apr 2026View
HOUSE TYPE BROCHUREPlans · PDF10 Apr 2026View
SITE LAYOUT 1-500 SCALE (SHEET 1 OF 3)Plans · PDF10 Apr 2026View
SITE LAYOUT 1-500 SCALE (SHEET 2 OF 3)Plans · PDF10 Apr 2026View
SITE LAYOUT 1-500 SCALE (SHEET 3 OF 3)Plans · PDF10 Apr 2026View
PHASE 1 LAYOUTPlans · PDF10 Apr 2026View
PARKING PLANPlans · PDF10 Apr 2026View
GARDEN AREA PLANPlans · PDF10 Apr 2026View
LOCATION PLANPlans · PDF10 Apr 2026View
MASSING PLANPlans · PDF10 Apr 2026View
OCCUPANCY PLANPlans · PDF10 Apr 2026View
CHARACTER AREA PLAN (2)Plans · PDF10 Apr 2026View
TENURE PLANPlans · PDF10 Apr 2026View
LANDSCAPE STRATEGY DOCUMENTPlans · PDF10 Apr 2026View
Design & Access StatementDesign & Access Statement · PDF10 Apr 2026View
RED LINE SITE LOCATION PLANPlans · PDF10 Apr 2026View
SITEWIDE ILLUSTRATIVE LANDSCAPE STRATEGY PLANPlans · PDF10 Apr 2026View
OPEN SPACE PARAMETERS PLANPlans · PDF10 Apr 2026View
KEY STRUCTURING ELEMENTS PLANPlans · PDF10 Apr 2026View
BUILDING HEIGHTS PARAMETERS PLANPlans · PDF10 Apr 2026View
LAND USE AND ACCESS PARAMETER PLANPlans · PDF10 Apr 2026View
RESIDENTIAL DENSITY PARAMETER PLANPlans · PDF10 Apr 2026View
PUBLIC TRANSPORT PLANPlans · PDF10 Apr 2026View
LANDSCAPE CHARACTER AREAS PLANPlans · PDF10 Apr 2026View
ILLUSTRATIVE MASTERPLANPlans · PDF10 Apr 2026View
PHASE 1 LANDSCAPE MASTERPLAN_EMAILPlans · PDF10 Apr 2026View
PHASE -1 TREE STRATEGY PLANPlans · PDF10 Apr 2026View
PHASE 1 DESIGN SPINE ROAD/INTERNAL VISIBILY PLANPlans · PDF10 Apr 2026View
GENERAL ARRANGEMENT SHEET 4 OF 4Plans · PDF10 Apr 2026View
PHASE 1 DESIGN ON-SITE SPINE ROAD GENERAL ARRANGEMENTPlans · PDF10 Apr 2026View
PHASE 1 ON-SITE SPINE ROAD AND INTERNAL LAYOUT VEHICLE SWEPT PATH ANALYSIS THROUPlans · PDF10 Apr 2026View
PHASE 1 ON-SITE SPINE ROAD AND INTERNAL LAYOUT SWEPT PATH ANALYSIS JUNCTIONS & IPlans · PDF10 Apr 2026View
PHASE 1 ON-SITE SPINE ROAD AND INTERNAL LAYOUT SWEPT PATH ANALYSIS RCV JUNCTIONSPlans · PDF10 Apr 2026View
TOLLERTON AIRFIELD PHASE 1 DESIGN SWEPT PATH ANALYSIS SITE ACCESSPlans · PDF10 Apr 2026View
PHASE 1 ON-SITE SPINE ROAD AND INTERNAL LAYOUT VEHICLE SWEPT PATH ANALYSIS WORSTPlans · PDF10 Apr 2026View
PHASE 1 ON-SITE SPINE ROAD AND INTERNAL LAYOUT VEHICLE SWEPT PATH ANALYSIS LOCATPlans · PDF10 Apr 2026View
PHASE 1 ON-SITE SPINE ROAD AND INTERNAL LAYOUT VEHICLE SWEPT PATH ANALYSIS LOCATPlans · PDF10 Apr 2026View
PHASE 1 DESIGN PROPOSED HIGHWAY BOUNDARYPlans · PDF10 Apr 2026View
ARBORICULTURAL IMPACT ASSESSMENTTree Report · PDF10 Apr 2026View
LAND AT TOLLERTON AIRPORT IN RUSHCLIFFE -SPORT FACILITY ASSESSMENT - SEPT 2025 FOther · PDF10 Apr 2026View
Flood Risk AssessmentFlood Risk Assessment · PDF10 Apr 2026View
PRELIMINARY DRAINAGE STRATEGY AND FFL'SPlans · PDF10 Apr 2026View
PRELIMINARY DRAINAGE STRATEGY AND FFL'SPlans · PDF10 Apr 2026View
DRAINAGE STRATEGYPlans · PDF10 Apr 2026View
SUDS SECTIONSPlans · PDF10 Apr 2026View
TOLLERTON PLANNING STATEMENT ADDENDUMPlanning Statement · PDF10 Apr 2026View
REVISED PROPOSALS COVER LETTERCovering Letter · PDF10 Apr 2026View
FIGURE 8.6 SITEWIDE ILLUSTRATIVE LANDSCAPE STRATEGY PLANCovering Letter · PDF10 Apr 2026View
ES SUPPLEMENT_APPENDIX 1.1 STATEMENT OF TECHNICAL COMPETENCE.Other · PDF10 Apr 2026View
ES SUPPLEMENT_APPENDIX 3.1 FLOOD RISK ASSESSMENT_PART 1Other · PDF10 Apr 2026View
ES SUPPLEMENT_APPENDIX 3.1 FLOOD RISK ASSESSMENT_PART 2Other · PDF10 Apr 2026View
ES SUPPLEMENT_FIGURE 1.1 SITE LOCATION PLANOther · PDF10 Apr 2026View
ES SUPPLEMENT_FIGURE 3.1 DETAILED PHASE 1 LAYOUT PLANOther · PDF10 Apr 2026View
ES SUPPLEMENT_FIGURE 3.2 LAND USE AND ACCESS PARAMETER PLANOther · PDF10 Apr 2026View
ES SUPPLEMENT_FIGURE 3.3 BUILDING HEIGHTS PARAMETERS PLANOther · PDF10 Apr 2026View
ES SUPPLEMENT_FIGURE 3.4 OPEN SPACE PARAMETERS PLANOther · PDF10 Apr 2026View
ES SUPPLEMENT_FINALOther · PDF10 Apr 2026View
Application FormApplication Form · PDF10 Apr 2026View
PLANNING PERFORMANCE AGREEMENTOther · PDF19 Dec 2025View
ENVIRONMENTAL HEALTH OFFICERConsultee Responses · PDF22 May 2025View
M SARLING BRAINTREE ESSEXPublic Comment · PDF14 Apr 2025View
NCC HIGHWAYS - HOLDING OBJECTIONConsultee Comment · PDF7 Apr 2025View
MR IAIN THOMAS WOLKOWSKINeighbour Responses · PDF20 Mar 2025View
SARAH DEACON - 11 WESTERHAM ROAD, RUDDINGTONConsultee Responses · PDF5 Feb 2025View
SARAH DEACON - 11 WESTERHAM ROAD, RUDDINGTONConsultee Responses · PDF5 Feb 2025View
SARAH DEACON - ADDITIONAL COMMENTSNeighbour Responses · PDF20 Dec 2024View
COMMUNITY ASSETS REGISTER FORMAL DECISION LETTEROther · PDF22 Oct 2024View
LETTER RE ASSET OF COMMUNITY VALUEOther · PDF21 Oct 2024View
NATIONAL HIGHWAYS - HOLDING OBJECTIONConsultee Responses9 Oct 2024View
EMAIL FROM MP WITH LETTER FROM MINISTER ATTACHEDOther · PDF29 Sept 2024View
LETTER FROM MINISTER ATTACHED TO EMAIL FROM MPOther · PDF29 Sept 2024View
SPORTS ENGLANDConsultee Responses · PDF17 Sept 2024View
BRITISH HORSE SOCIETYConsultee Responses · PDF22 Aug 2024View
COAL AUTHORITYConsultee Responses · PDF25 Jul 2024View
COMMUNITIES OFFICERConsultee Responses · PDF2 Jul 2024View
EMAIL FROM TURLEY REGARDING NOISECorrespondence · PDF26 Jun 2024View
RBC ENVIRONMENTAL HEALTHConsultee Responses · PDF26 Jun 2024View
T WEBSTER - 16 MOWBRAY RISE, ARNOLDPublic Comment · PDF20 Jun 2024View
DR NOTTINGHAMSHIRE COUNTY COUNCIL HIGHWAYSConsultee Comment11 Jun 2024View
NCC HIGHWAYSConsultee Responses11 Jun 2024View
LANDSCAPING OFFICERS COMMENTSConsultee Responses · PDF11 Jun 2024View
ENVIRONMENT AGENCYConsultee Responses · PDF10 Jun 2024View
POLICY RE OPEN MARKET HOUSING MIXConsultee Comment · PDF10 Jun 2024View
PLANNING POLICY OFFICERConsultee Comment · PDF3 Jun 2024View
ENVIRONMENTAL HEALTHConsultee Comment · PDF3 Jun 2024View
ENVIRONMENTAL HEALTH OFFICERConsultee Responses · PDF3 Jun 2024View
AFFORDABLE HOUSING - RBC POLICYConsultee Responses3 Jun 2024View
MISS A WILLIAMS - 17 MAORI AVENUE, HUCKNALLPublic Comment · PDF30 May 2024View
Public CommentPublic Comment · PDF30 May 2024View
Press NoticePress Notice · PDF30 May 2024View
MISS J. DAVISNeighbour Responses · PDF15 May 2024View
PETER AND ALEXANDRA ELLISNeighbour Responses · PDF15 May 2024View
MR PUBLIC RIGHTS OF WAY NCCConsultee Comment · PDF13 May 2024View
ENVIRONMENT AGENCYConsultee Responses · PDF9 May 2024View
N GOLDINGPublic Comment · PDF2 May 2024View
NCC PLANNING POLICYConsultee Responses · PDF29 Apr 2024View
HIGHWAYS ENGLANDConsultee Responses · PDF24 Apr 2024View
AVIATION HERITAGE UKConsultee Responses · PDF22 Apr 2024View
CONSERVATION OFFICERConsultee Comment · PDF19 Apr 2024View
TOLLERTON PARISH COUNCILWard Member & Parish Responses · PDF16 Apr 2024View
COUNCILLOR RICHARD BUTLERWard Member & Parish Responses · PDF16 Apr 2024View
ACTIVE TRAVEL ENGLANDConsultee Comment · PDF15 Apr 2024View
COUNCILLOR KEIR CHEWINGSWard Member & Parish Responses · PDF14 Apr 2024View
SPORT ENGLANDConsultee Responses · PDF12 Apr 2024View
MS EMILY GILLOTTConsultee Comment · PDF12 Apr 2024View
RBC ECOLOGY & SUSTAINABILITY OFFICERConsultee Responses · PDF11 Apr 2024View
NATIONAL HIGHWAYSConsultee Responses · PDF11 Apr 2024View
CANAL AND RIVERS TRUSTConsultee Responses · PDF11 Apr 2024View
COTGRAVE TOWN COUNCIL - MRS JULIE STEPHENSONWard Member & Parish Responses · PDF11 Apr 2024View
NATURAL ENGLANDConsultee Responses · PDF10 Apr 2024View
NATURAL ENGLAND - ANNEX TO STANDARD LETTERConsultee Responses · PDF10 Apr 2024View
HISTORIC ENGLANDConsultee Responses10 Apr 2024View
NHS NOTTINGHAM WEST CCGConsultee Responses · PDF9 Apr 2024View
J SAUNDERSPublic Comment · PDF9 Apr 2024View
COUNCILLOR JONATHAN WHEELERWard Member & Parish Responses · PDF7 Apr 2024View
AERODROME SAFEGUARDING AUTHConsultee Comment · PDF5 Apr 2024View
NOTTS POLICEConsultee Comment · PDF4 Apr 2024View
MS TETYANA SHEVCHENKONeighbour Responses · PDF3 Apr 2024View
MR STEWART WILLIAMNeighbour Responses · PDF2 Apr 2024View
MR SIRAJ AHMEDNeighbour Responses · PDF2 Apr 2024View
MS LINDA HIRSTNeighbour Responses · PDF2 Apr 2024View
NCC FLOOD RISKConsultee Comment · PDF2 Apr 2024View
MR ADAM SINFIELDNeighbour Responses · PDF2 Apr 2024View
MR IAN HARTSHORNENeighbour Responses · PDF1 Apr 2024View
MRS HAPPS LAURANeighbour Responses · PDF31 Mar 2024View
Press NoticePress Notice · PDF28 Mar 2024View
MS TETYANA SHEVCHENKONeighbour Responses · PDF26 Mar 2024View
COAL AUTHORITYConsultee Responses · PDF25 Mar 2024View
MISS LAURA HOWARDPublic Comment · PDF22 Mar 2024View
24/00347/HYBRIDNeighbour Responses · PDF22 Mar 2024View
MR DALE DUDLEYNeighbour Responses · PDF22 Mar 2024View
STEPHEN SLEIGHNeighbour Responses · PDF22 Mar 2024View
BECKY BROWNNeighbour Responses · PDF22 Mar 2024View
FIGURE 8.3 PHOTOSHEETSEnvironmental Statement · PDF11 Mar 2024View
CH001 INTRODUCTIONEnvironmental Statement · PDF11 Mar 2024View
CH002 EIA METHODOLOGYEnvironmental Statement · PDF11 Mar 2024View
CH003 SITE AND DEVELOPMENTEnvironmental Statement · PDF11 Mar 2024View
CH004 ALTERNATIVES CONSIDEREDEnvironmental Statement · PDF11 Mar 2024View
CH005 CONSTRUCTION PROGRAMMEEnvironmental Statement · PDF11 Mar 2024View
CH006 POPULATION AND HUMAN HEALTHEnvironmental Statement · PDF11 Mar 2024View
CH007 CULTURAL HERITAGEEnvironmental Statement · PDF11 Mar 2024View
CH008 LANDSCAPE AND VISUAL EFFECTSEnvironmental Statement · PDF11 Mar 2024View
CH009 BIODIVERSITYEnvironmental Statement · PDF11 Mar 2024View
CH010 WATEREnvironmental Statement · PDF11 Mar 2024View
CH011 TRANSPORT AND ACCESSEnvironmental Statement · PDF11 Mar 2024View
CH012 NOISEEnvironmental Statement · PDF11 Mar 2024View
CH013 CLIMATE CHANGEEnvironmental Statement · PDF11 Mar 2024View
CH014 AIR QUALITY DUSTEnvironmental Statement · PDF11 Mar 2024View
CH015 SUMMARY AND RESIDUAL EFFECTSOther · PDF11 Mar 2024View
APPENDIX 1.1 LOCATION ES INFORMATIONEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 1.2 STATEMENT OF EXPERTISEEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 2.1 EIA SCOPING REPORTEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 2.2 EIA SCOPING OPINIONEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 6.1 HIAEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 7.1 CULTURAL HERITAGE BASELINEEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 7.2 GEOPHYSICAL SURVEY PART2Environmental Statement · PDF11 Mar 2024View
APPENDIX 7.2 GEOPHYSICAL SURVEY PART3Environmental Statement · PDF11 Mar 2024View
APPENDIX 7.2 GEOPHYSICAL SURVEYEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 8.1 - NATIONAL POLICY CONTEXTEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 8.2 - CSA METHODOLOGY TABLESEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 8.3 - EXTRACTS FROM DISTRICT LCAEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 9.1 HABITATS PLANEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 9.2 LEGISLATION AND POLICYEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 9.3 BAT SURVEY REPORTEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 9.5 RIPARIAN MAMMAL SURVEY REPORTEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 9.6 BIRD SURVEY REPORTEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 9.7 REPTILE SURVEY REPORTEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 9.8 GCN SURVEY REPORTEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 9.9 INVERTEBRATE SCOPING REPORTEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 9.10 BNG ASSESSMENTEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 12.1 ACOUSTIC TERMINOLOGYEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 12.2 STANDARDS AND GUIDANCEEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 12.3 EQUIPMENT CALIBRATIONEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 12.4 TIME HISTORY GRAPHSEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 13.1 CLIMATE CHANGE POLICYEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 13.2 ENERGY AND SUSTAINABILITY STATEMENTEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 13.3 CLIMATE PROJECTIONSEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 14.1 IAQM DUST GUIDANCE (2004) APPROACHEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 14.2 EPUK IAQM GUIDANCE (2017) SCREENING APPROACHEnvironmental Statement · PDF11 Mar 2024View
APPENDIX 14.3 CONSTRUCTION DUST BUFFER AND SITE BOUNDARYEnvironmental Statement · PDF11 Mar 2024View
LAND NORTH OF TOLLERTON ES NON-TECHNICAL SUMMARYEnvironmental Statement · PDF11 Mar 2024View
DESIGN AND ACCESS STATEMENTDesign & Access Statement · PDF6 Mar 2024View
DESIGN AND ACCESS STATEMENT_CHAPTER 1-2Design & Access Statement · PDF6 Mar 2024View
DESIGN AND ACCESS STATEMENT_CHAPTER 3Design & Access Statement · PDF6 Mar 2024View
STATUTORY_BIODIVERSITY_METRIC_WHOLE SITEEcology Report6 Mar 2024View
DESIGN AND ACCESS STATEMENT_CHAPTER 4-10Design & Access Statement · PDF6 Mar 2024View
STATUTORY_BIODIVERSITY_METRIC_PHASE 1 ONLYEcology Report6 Mar 2024View
GEO-ENVIRONMENTAL ASSESSMENTGround Conditions Report · PDF5 Mar 2024View
Application FormApplication Form · PDF1 Mar 2024View
Covering LetterCovering Letter · PDF1 Mar 2024View
Site location planSite location plan · PDF1 Mar 2024View
Utilities ReportUtilities Report · PDF1 Mar 2024View
RESIDENTIAL TRAVEL PLANTravel Plan · PDF1 Mar 2024View
TA FIGURESTravel Plan · PDF1 Mar 2024View
TA APPENDIX 10.2 - FULL DEVELOPMENT JUNCTION CAPACITY ASSESSMENTTransport Assessment · PDF1 Mar 2024View
TA APPENDIX 10.1 FIRST PHASE JUNCTION CAPACITY ASSESSMENTSTransport Assessment · PDF1 Mar 2024View
TA APPENDIX 9.1 VEHICLE NETWORK FLOW DIAGRAMSTransport Assessment · PDF1 Mar 2024View
TA APPENDIX 8.1 TRICS OUTPUTTransport Assessment · PDF1 Mar 2024View
TA APPENDIX 7.5 ACTIVE TRAVEL ENGLAND TOOLKITTransport Assessment · PDF1 Mar 2024View
TA APPENDIX 7.4 WALKING AND CYCLING FLOW DIAGRAMSTransport Assessment · PDF1 Mar 2024View
TA APPENDIX 7.3 GAMSTON DEVELOPMENT ACCESS STRATEGY ? OPTION 2 A52 SOUTHERN CROSTransport Assessment · PDF1 Mar 2024View
TA APPENDIX 7.2 GAMSTON DEVELOPMENT ACCESS STRATEGY ? OPTION 1 A52 SOUTHERN CROSTransport Assessment · PDF1 Mar 2024View
TA APPENDIX 7.1 FIRST PHASE ACCESS STRATEGYTransport Assessment · PDF1 Mar 2024View
TA APPENDIX 5.1 GAMSTON FIELDS FRAMEWORK PLANTransport Assessment · PDF1 Mar 2024View
TA APPENDIX 3.3 TRAFFIC COUNT DATATransport Assessment · PDF1 Mar 2024View
TA APPENDIX 3.2 PERSONAL INJURY COLLISION DATA AND ANALYSISTransport Assessment · PDF1 Mar 2024View
TA APPENDIX 3.1 ACTIVE TRAVEL AUDITTransport Assessment · PDF1 Mar 2024View
TRANSPORT ASSESSMENT - FINAL ISSUETransport Assessment · PDF1 Mar 2024View
SUSTAINABILITY AND ENERGY STATEMENT - 27.02.2024 - REV 1.Sustainability Appraisal · PDF1 Mar 2024View
Statement of Community InvolvementStatement of Community Involvement · PDF1 Mar 2024View
Planning StatementPlanning Statement · PDF1 Mar 2024View
STREET SCENESPlans · PDF1 Mar 2024View
SITE LAYOUT SHEET 1 OF 3.Plans · PDF1 Mar 2024View
SITE LAYOUT SHEET 2 OF 3Plans · PDF1 Mar 2024View
SITE LAYOUT SHEET 3 OF 3.Plans · PDF1 Mar 2024View
PHASE 1 RED LINE BOUNDARYPlans · PDF1 Mar 2024View
COMPOSITE SITE LAYOUTPlans · PDF1 Mar 2024View
PARKING PLANPlans · PDF1 Mar 2024View
GARDEN AREA PLANPlans · PDF1 Mar 2024View
HOUSE TYPES BROCHURE- FEB 2024Plans · PDF1 Mar 2024View
PRELIMINARY DRAINAGE STRATEGY AND FFL'SPlans · PDF1 Mar 2024View
PRELIMINARY DRAINAGE STRATEGY AND FFL'SPlans · PDF1 Mar 2024View
SUDS SECTIONSPlans · PDF1 Mar 2024View
GENERAL ARRANGEMENT SHEET 1 OF 4Plans · PDF1 Mar 2024View
GENERAL ARRANGEMENT SHEET 2 OF 4Plans · PDF1 Mar 2024View
GENERAL ARRANGEMENT SHEET 3 OF 4Plans · PDF1 Mar 2024View
GENERAL ARRANGEMENT SHEET 4 OF 4Plans · PDF1 Mar 2024View
GENERAL ARRANGEMENT - PRIMARY A SECONDARY STREETS SHEET 1 OF 2Plans · PDF1 Mar 2024View
GENERAL ARRANGEMENT - PRIMARY A SECONDARY STREETS SHEET 2 OF 2Plans · PDF1 Mar 2024View
VEHICLE SWEPT PATHS SHEET 1 OF 3Plans · PDF1 Mar 2024View
VEHICLE SWEPT PATHS SHEET 2 OF 3Plans · PDF1 Mar 2024View
VEHICLE SWEPT PATHS SHEET 3 OF 3Plans · PDF1 Mar 2024View
SURFACING LAYOUT - PRIMARY A SECONDARY STREETS SHEET 1 OF 2Plans · PDF1 Mar 2024View
SURFACING LAYOUT - PRIMARY A SECONDARY STREETS SHEET 2 OF 2Plans · PDF1 Mar 2024View
_PHASE 1 LANDSCAPE MASTERPLANPlans · PDF1 Mar 2024View
DEMOLITION PLANPlans · PDF1 Mar 2024View
PHASING PLANPlans · PDF1 Mar 2024View
LANDSCAPE CHARACTER AREAS PLANPlans · PDF1 Mar 2024View
PUBLIC TRANSPORT PLANPlans · PDF1 Mar 2024View
KEY STRUCTURING ELEMENTS PLANPlans · PDF1 Mar 2024View
OPEN SPACE PARAMETERS PLANPlans · PDF1 Mar 2024View
BUILDING HEIGHTS PARAMETERS PLANPlans · PDF1 Mar 2024View
LAND USE AND ACCESS PARAMETER PLAN.Plans · PDF1 Mar 2024View
RESIDENTIAL DENSITY PARAMETER PLANPlans · PDF1 Mar 2024View
SITEWIDE ILLUSTRATIVE LANDSCAPE STRATEGY PLANPlans · PDF1 Mar 2024View
TOLLERTON AIRFIELD OUTLINE PLANNING APPLICATION GENERAL ARRANGEMENT SHEET 1 OF 2Plans · PDF1 Mar 2024View
TOLLERTON AIRFIELD OUTLINE PLANNING APPLICATION GENERAL ARRANGEMENT (OPTION 1) SPlans · PDF1 Mar 2024View
TOLLERTON AIRFIELD OUTLINE PLANNING APPLICATION GENERAL ARRANGEMENT (OPTION 2) SPlans · PDF1 Mar 2024View
LAND NORTH OF TOLLERTON - LIGHTING IMPACT ASSESSMENT_COMMENTS ADDRESSEDLighting Assessment · PDF1 Mar 2024View
LANDSCAPE STRATEGY DOCUMENTLandscape & Visual Impact Assessment · PDF1 Mar 2024View
HEALTH IMPACT ASSESSMENTOther · PDF1 Mar 2024View
DESK STUDY REPORTGround Conditions Report · PDF1 Mar 2024View
GEO-ENVIRONMENTAL DESK STUDY REPORTGround Conditions Report · PDF1 Mar 2024View
LAND AT TOLLERTON AIRFIELD - ECONOMIC BENFITS STATEMENT - FINALEconomic Statement · PDF1 Mar 2024View
DESIGN AND ACCESS STATEMENT_CHAPTER 1-2Design & Access Statement · PDF1 Mar 2024View
ARBORICULTURAL IMPACT ASSESSMENTTree Report · PDF1 Mar 2024View
FIGURE 1Air Quality Report · PDF1 Mar 2024View
FIGURE 2Air Quality Report · PDF1 Mar 2024View
FIGURE 3.1 V2Air Quality Report · PDF1 Mar 2024View
FIGURE 3.2 V2Air Quality Report · PDF1 Mar 2024View
FIGURE 4Air Quality Report · PDF1 Mar 2024View
TOLLERTON AQ DETAILED ASSESSMENT V6_FINALAir Quality Report · PDF1 Mar 2024View
Flood Risk AssessmentFlood Risk Assessment · PDF1 Mar 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Environmental Impact Assessment Received

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  7. Last Site Notice Posted Date

    Published milestoneCouncil source
  8. Last Advertised In Press Date

    Published milestoneCouncil source
  9. Standard Consultation Date

    Published milestoneCouncil source
  10. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Standard Consultation Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Not published
COMMUNITY ASSETS REGISTER FORMAL DECISION LETTER
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.