Council planning record

Prior approval Under schedule 2 Part 1 Class AA of the General Permitted Development Order for a proposed additional storey to dwelling, maximum height externally from ground floor level to highest part of the roof 7.4m.

CANAL VIEW, TUCKEYS FARM, CATHIRON LANE, HARBOROUGH MAGNA, RUGBY, CV23 0JH

Decision MadeReference: R26/0335Rugby Borough Council

Last published check: 3 Oct 2026, 17:15. Check the council record for more recent changes.

Application location

CANAL VIEW, TUCKEYS FARM, CATHIRON LANE, HARBOROUGH MAGNA, RUGBY, CV23 0JH

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Not published
Received
7 Apr 2026
Validated
14 Apr 2026
Determination deadline
19 May 2026
Local authority
Rugby Borough Council

Application overview

Prior approval Under schedule 2 Part 1 Class AA of the General Permitted Development Order for a proposed additional storey to dwelling, maximum height externally from ground floor level to highest part of the roof 7.4m.

Proposal details

Reference
R26/0335
Alternative references
PP-14839685
Ward
Revel & Binley Woods
Parish
Harborough Magna
Agent
NEIL BREAKWELL
UPRN
200002448750

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
Existing Plans and Elevations R'cd 07.04.2026Existing Plans9 Apr 2026View
Proposed Block Plan R'cd 07.04.2026Block Plan9 Apr 2026View
Proposed Plans R'cd 07.04.2026Proposed Plans9 Apr 2026View
Proposed Elevations R'cd 07.04.2026Proposed Plans9 Apr 2026View
Redacted Application Form R'cd 07.04.2026Application Form9 Apr 2026View
Planning Supporting Statement R'cd 07.04.2026Planning Statement9 Apr 2026View
Environmental HealthConsultee Comment29 Apr 2026View
Ecology - No objectionConsultee Comment30 Apr 2026View
Decision NoticeDecision Notice15 May 2026View
Officer reportOfficer Report15 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Registration date

    Published milestoneCouncil source
  3. Press notice start date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Dispatch date

    Published milestoneCouncil source
  9. Decision date

    Published milestoneCouncil source
  10. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Required and Approved
Decision Notice
Planning conditions
  1. INFORMATIVE 1: PLEASE NOTE - The applicant's attention is drawn to the condition under sub paragraph 2(d) of section AA.2 of Class AA Part 1 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Following the development, the dwellinghouse must be used as a dwellinghouse within the meaning of Class C3 of the Schedule to the Use Classes Order and for no other purpose, except to the extent that the other purpose is ancillary to the primary use as a dwellinghouse. - The applicant's attention is drawn to the condition under sub paragraph 3(b) of section AA.2 of Class AA Part 1 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Before beginning the development, the developer must provide the local planning authority with a report for the management of the construction of the development, which sets out the proposed development hours of operation and how any adverse impact of noise, dust, vibration and traffic on adjoining owners or occupiers will be mitigated. - The applicant's attention is drawn to the condition under sub paragraph 3(c) of section AA.2 of Class AA Part 1 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). The development must be completed within a period of 3 years starting with the date prior approval is granted. - The applicant's attention is drawn to the condition under sub paragraph 3(d) of section AA.2 of Class AA Part 1 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). The developer must notify the local planning authority of the completion of the development as soon as reasonably practicable after completion.
  2. INFORMATIVE 2: Permitted hours for building work. Construction and demolition works and associated activities at the development, audible beyond the boundary of the site should not be carried out other than between the hours of 0800 - 1800hrs Mondays to Fridays and 0800 - 1300hrs on Saturdays and at no other times, including Sundays and Public/Bank Holidays, unless otherwise agreed with the Environmental Health Officer.
  3. INFORMATIVE 3: Notification to neighbours of demolition/ building works. At least 21 days prior to the commencement of any site works, all occupiers surrounding the site should be notified in writing of the nature and duration of works to be undertaken. The name and contact details of a person responsible for the site works should be made available for enquiries and complaints for the entire duration of the works and updates of work should be provided regularly. Any complaints should be properly addressed as quickly as possible.
  4. INFORMATIVE 4: Dust. Best Practicable Means (BPM) should be used in controlling dust emissions, in accordance with the Supplementary Planning Guidance issued by the GLA 2014 for The Control of Dust and Emissions from Construction and Demolition.
  5. INFORMATIVE 5: Dark smoke and nuisance. No waste materials should be burnt on site of the development hereby approved.
  6. INFORMATIVE 6: Noise and Vibration from demolition, piling, concrete crushing, drilling, excavating, etc. Best Practicable Means (BPM) should be used, including low vibration methods and silenced equipment and machinery, in accordance with the Approved Codes of Practice of BS5228:2009 for noise and vibration control on construction and open sites.
  7. INFORMATIVE 7: Waste management and disposal All waste materials and rubbish associated with demolition and/or construction should be contained on site in appropriate containers which, when full, should be promptly removed to a licensed disposal site.
  8. INFORMATIVE 8: Many buildings contain wildlife such as bats and nesting birds that are protected by law. Works carried out under Permitted Development Rights do not override the protection afforded to these species and their habitats. You must take steps to ensure that the work you are carrying out will not harm any protected species, and if it may do so you must also obtain permission from Natural England prior to carrying out the work. WCC Ecological Services have suggested that the proposed works may impact bats and advise that a bat survey should be carried out. For more information on protected species please see https://www.bats.org.uk/advice/im-working-on-a-building-with-bats
  9. CONDITION: Existing Plans & Elevations – 8601 – 01 Proposed Site Block Plan – 8601 – 02 Proposed Plans – 8601 - 03A Proposed Elevations – 8601 - 04A Received by the Local Planning Authority on the 9th April 2026
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.