T1 Cherry, (current dimensions,6m height, spread 3.5-5m)prune height 1m and spread 1-2m as appropriate. Re-shape crown. Work to maintain tree at a suitable size for the space it occupies, prevent encroachment to car park and to path and rear aspect of No.12 South Rd. T2 Cherry, (current dimensions, 7.5m height, 4-5m spread), prune 2m height and 1-2m spread, to maintain tree at its current size. G4 Hawthorn group, (current height 4.5-5.5m) prune height by 2-2.5m and trim to form hedgeline. Group of 5-6 Hawthorn which have been planted to form a hedge to screen residents from the childrens play area. Trees have not been cut and have a ,leggy, form. Pruning to encourage ramification and thickening of growth to form a more effective hedgeline.
Mayo Court, South Road, Clifton Upon Dunsmore, Rugby, CV23 0EF
T1 Cherry, (current dimensions,6m height, spread 3.5-5m)prune height 1m and spread 1-2m as appropriate. Re-shape crown. Work to maintain tree at a suitable size for the space it occupies, prevent encroachment to car park and to path and rear aspect of No.12 South Rd. T2 Cherry, (current dimensions, 7.5m height, 4-5m spread), prune 2m height and 1-2m spread, to maintain tree at its current size. G4 Hawthorn group, (current height 4.5-5.5m) prune height by 2-2.5m and trim to form hedgeline. Group of 5-6 Hawthorn which have been planted to form a hedge to screen residents from the childrens play area. Trees have not been cut and have a ,leggy, form. Pruning to encourage ramification and thickening of growth to form a more effective hedgeline.
Reference
R26/0199
Alternative references
PP-14740935
Ward
Clifton, Newton & Churchover
Parish
Clifton Upon Dunsmore
Agent
Steve Carter
UPRN
10010510206
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.