Council planning record

Variation of condition 2 of R25/0645 to alter the design and update plans. (Two storey extension with glass link and alterations including the demolition of existing extensions and outbuildings).

FIELD VIEW, FRANKTON ROAD, BOURTON-ON-DUNSMORE, RUGBY, CV23 9QT

Decision MadeReference: R26/0154Rugby Borough Council

Last published check: 30 Sept 2026, 23:44. Check the council record for more recent changes.

Application location

FIELD VIEW, FRANKTON ROAD, BOURTON-ON-DUNSMORE, RUGBY, CV23 9QT

This record has no verified map location.

Application summary

Status
Decision Made
Application type
8 Weeks PA
Received
16 Feb 2026
Validated
19 Feb 2026
Determination deadline
13 Apr 2026
Local authority
Rugby Borough Council

Application overview

Variation of condition 2 of R25/0645 to alter the design and update plans. (Two storey extension with glass link and alterations including the demolition of existing extensions and outbuildings).

Proposal details

Reference
R26/0154
Alternative references
PP-14709154
Ward
Dunsmore
Parish
Bourton & Draycote
Agent
Ed Whiting
UPRN
100071503523

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
Sustainability Checklist R'cd 16.02.2026Sustainability ChecklistNot publishedView
Planning statement R'cd 16.02.2026Planning StatementNot publishedView
Site Plan R'cd 16.02.2026Block PlanNot publishedView
Proposed Plans and Elevations R'cd 16.02.2026Proposed PlansNot publishedView
Site Levels Plan - Proposed R'cd 16.02.2026Site PlanNot publishedView
Site Location and Block Plan R'cd 16.02.2026Site, Location or Block PlanNot publishedView
Application Form - Without Personal Data 'cd 16.02.2026Application FormNot publishedView
EcologyConsultee Comment13 Mar 2026View
Ecology13 Mar 2026View
Extension of timeExtension of Time27 Apr 2026View
Decision NoticeDecision Notice6 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Valid date

    Published milestoneCouncil source
  6. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approval
Decision Notice
Planning conditions
  1. CONDITION 1: The development to which this permission relates must not be begun later than the 30th November 2028 REASON: To comply with Section 91 of the Town & Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act, 2004.
  2. CONDITION 2: The development shall be carried out in accordance with the plans and documents detailed below: The Application Form Design and Access Statement - 1770-PWP-E1-DAS-RLB-03 Ridgeway Ecology - Phase 1 & 2 Bat Survey Arboricultural Impact Assessment & Method Statement - Ref: jwmb/rpt2/fieldview/AIAAMS Date: 16th July 2025 Received by the Local Planning Authority on the 23rd July 2025 Proposed Site Plan - 1770-0521-01 Proposed Plans and Elevations - 1770-0522-01 Site Location and Block Plan - 1770-0520-01 Proposed Site Plan with TRPZ - 1770-0523-01 Received by the Local Planning Authority on the 16/02/2026 REASON: For the avoidance of doubt and to ensure that the details of the development are acceptable to the Local Planning Authority.
  3. CONDITION 3: The facing materials to be used on the external walls and roof shall be of the same type, colour and texture as those used on the existing building or as specified within the application form and proposed plans - Proposed Plans and Elevations - 1770-0522-01. REASON: To ensure a satisfactory external appearance and for the avoidance of doubt.
  4. CONDITION 4: The development shall be timetabled and carried out to wholly accord with the measures for the safeguarding of bats within the site as set out in section 5 of the document Phase 1 & 2 Bat Survey prepared by Ridgeway Ecology, July 2025. Thereafter, the box/es/features shall be maintained in perpetuity. REASON: To ensure that protected species are not harmed by the development.
  5. CONDITION 5: All tree protection measures and tree works identified within the Arboricultural Method Statement dated 16th July 2025 (Ref: jwmb/rpt2/fieldview/AIAAMS), relating to the approved design details (including the erection of protective fencing to create construction exclusion zones) must be implemented prior to the construction phase and to the satisfaction and written approval of the Local Planning Authority. All tree works must be carried out in accordance with BS3998:2010 (Tree work - Recommendations). Protective measures must remain in place until the completion of all construction works. Construction exclusion zones should be treated as sacrosanct with no building activity, ground disturbance or storage of building materials taking place within them. During the construction phase, no retained tree shall be cut down, uprooted or destroyed, nor shall any retained tree be pruned in any manner, be it branches, stems or roots, other than in accordance with the approved plans and particulars, without the prior written approval of the Local Planning Authority. REASON: To ensure retained trees are successfully incorporated into the design and are suitably protected from damage during the construction phase.
  6. INFORMATIVE 1: Work should avoid disturbance to nesting birds. Birds can nest in many places including buildings, trees, shrubs, dense ivy, and bramble/rose scrub. Nesting birds are protected under the Wildlife and Countryside Act 1981 (as amended). The main nesting season lasts approximately from March to September inclusive, so work should ideally take place outside these dates if at all possible. N.B birds can nest at any time, and the site should ideally be checked by a suitably qualified ecologist for their presence immediately before work starts, especially if during the breeding season.
  7. INFORMATIVE 2: Where possible enhancements should be incorporated into the development to improve the habitats and opportunities for the local wildlife and increase biodiversity. Enhancements could include bat and bird boxes which may be used by a variety of species, native species planting and enhancement of existing of hedges and wild flower planting, habitat piles of rubble, logs and earth which can be used by reptiles, amphibians and invertebrates are also welcomed. The WCC Ecological Services (tel: 01926 418060) would be pleased to advise further if required.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.