Council planning record

Proposed ground floor rear extension

20, ALMOND GROVE, RUGBY, CV21 1HP

Decision MadeReference: R26/0151Rugby Borough Council

Last published check: 3 Oct 2026, 23:57. Check the council record for more recent changes.

Application location

20, ALMOND GROVE, RUGBY, CV21 1HP

This record has no verified map location.

Application summary

Status
Decision Made
Application type
8 Weeks PA
Received
16 Feb 2026
Validated
20 Mar 2026
Determination deadline
13 May 2026
Local authority
Rugby Borough Council

Application overview

Proposed ground floor rear extension

Proposal details

Reference
R26/0151
Alternative references
PP-14672814
Ward
Newbold & Brownsover
Parish
Unparished
Agent
Dhiran Vagdia
UPRN
100070176321

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
Application Form Redacted R'cd 16.02.2026Application FormNot publishedView
Block Plan R'cd 10.03.2026Block Plan11 Mar 2026View
Proposed Floor Plans R'cd 10.03.2026Floor Plans11 Mar 2026View
Proposed Elevations R'cd 10.03.2026Proposed Plans11 Mar 2026View
Existing Floor Plans R'cd 11.03.2026Existing Plans17 Mar 2026View
Existing Elevations R'cd 11.03.2026Existing Plans17 Mar 2026View
Site Location Plan R'cd 18.03.2026Site Location Plan19 Mar 2026View
752387Decision_Approval_Planning_Permission_8189.pdfDecision Notice12 May 2026View
ApasTemplate_8807.pdfOfficer Report12 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Valid date

    Published milestoneCouncil source
  6. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approval
752387Decision_Approval_Planning_Permission_8189.pdf
Planning conditions
  1. CONDITION 1: The development to which this permission relates must not be begun later than the expiration of three years from the date of this permission. REASON: To comply with Section 91 of the Town & Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act, 2004.
  2. CONDITION 2: The development shall be carried out in accordance with the plans and documents detailed below: - Proposed Floor Plans Drg No. 2112-SK-003D - Proposed Elevations Drg No. 2112-SK-004C - Proposed Block Plan Drg No. 2112-BP-006 Received by the Local Planning Authority 10.03.2026 - Site Location Plan Drg No. 2112-LP-001A Received by the Local Planning Authority 18.03.2026 REASON: For the avoidance of doubt and to ensure that the details of the development are acceptable to the Local Planning Authority.
  3. CONDITION 3: The facing materials to be used on the external walls and roof shall be as specified on the application form, received by the Local Planning Authority on 16.02.2026 and on plans outlined in Condition 2. REASON: To ensure a satisfactory external appearance, for the avoidance of doubt and to ensure that the scheme is in compliance with adopted Local plan policy SDC1.
  4. INFORMATIVE 1: Buildings of all ages and trees with suitable features (i.e. rot-holes, cracks, fissures) are frequently used by roosting bats. Bats and their ‘roost’ sites are fully protected under the Wildlife and Countryside Act 1981 (as amended) and the Conservation of Habitats and Species Regulations 2017 (as amended), making them a Protected Species. It is a criminal offence to recklessly disturb or destroy a known or suspected bat ‘roost’, even if the roost is only occasionally used. Where a bat ‘roost’ is present a license may be necessary to carry out any works. Further information about species licensing and legislation can be obtained from the Species Licensing Service on 02080 261089. If evidence of bats is found during works, work should stop immediately, and the National Bat Helpline must be contacted on 0345 1300 228 for advice on the best way to proceed.
  5. INFORMATIVE 2: Work should avoid disturbance to nesting birds. Birds can nest in many places including buildings, trees, shrubs dense ivy, and bramble/rose scrub. Nesting birds are protected under the Wildlife and Countryside Act 1981 (as amended). The main nesting season, lasts approximately from March to September, so work should ideally take place outside these dates if at all possible. N.B birds can nest at any time, and the site should ideally be checked for their presence immediately before work starts, especially if during the breeding season.
  6. INFORMATIVE 3: Consideration should be given to the provision of suitable bat and bird boxes within the new build or adjacent trees in order to increase opportunities for wildlife. Many bat and bird populations have declined dramatically in recent years due to loss of roost, nest and foraging sites as a result of development. However, a variety of bat and bird species use boxes and they can be particularly useful in the built environment, where natural nesting places can be scarce. Please ensure that the boxes are appropriately sited and not lit at night in the case of bat boxes. Further advice and information can be obtained from the Bat Conservation Trust (BCT), and the Royal Society for the Protection of Birds (RSPB).
  7. INFORMATIVE 4: The applicant is encouraged to incorporate measures to assist in reducing their impact upon the Air Quality Management Area as part of this development. Initiatives could include the installation of an ultra-low emission boiler (<40mg/kWh), increased tree planting/landscaping, solar thermal panels, and the incorporation of electric vehicle charging points on any car parking. More information on plants that can be incorporated into landscaping for green walls and roofs can be found here: https://www.museumoflondon.org.uk/application/files/4915/2604/2216/2018-05-11-phytosensor-final-web-ok-compressed_1.pdf Such measures contribute towards improving air quality. Further information can be obtained from Environmental Health on 01788 533857 or email ehcs@rugby.gov.uk
  8. INFORMATIVE 5: Environmental Services advise that in order to reduce the likelihood of local residents being subjected to adverse levels of noise annoyance during construction, work on site should not occur outside the following hours: - Monday - Friday - 7.30 a.m. - 6.00 p.m. Saturday - 8.30 a.m. - 1.00 p.m. No work on Sundays & Bank Holidays.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.