Council planning record

Prior approval for proposed demolition of existing structure.

LANDSCAPE VIEW, MAIN STREET, WILLEY, RUGBY, CV23 0SH

Decision MadeReference: R26/0149Rugby Borough Council

Last published check: 1 Oct 2026, 00:02. Check the council record for more recent changes.

Application location

LANDSCAPE VIEW, MAIN STREET, WILLEY, RUGBY, CV23 0SH

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Demolition Prior Approval
Received
16 Feb 2026
Validated
18 Feb 2026
Determination deadline
15 Mar 2026
Local authority
Rugby Borough Council

Application overview

Prior approval for proposed demolition of existing structure.

Proposal details

Reference
R26/0149
Alternative references
PP-14702332
Ward
Revel & Binley Woods
Parish
Willey
Agent
Patrick Thirlwall
UPRN
100071239438

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 6 of 6

DocumentPublishedAction
Site/Block Plan - Existing R'cd 16.02.2026Block PlanNot publishedView
The location plan R'cd 16.02.2026Site Location PlanNot publishedView
Application Form - Without Personal Data R'cd 16.02.2026Application FormNot publishedView
Site Notice Statement R'cd 16.02.2026Site Notice17 Feb 2026View
Officer ReportOfficer Report13 Mar 2026View
Decision NoticeDecision Notice13 Mar 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Valid date

    Published milestoneCouncil source
  6. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Not Required
Decision Notice
Planning conditions
  1. CONDITION: The Application Form Site Location Plan - 202603-PJT-DR-001 - REV. P01 Site Block Plan - 202603-PJT-DR-002 - REV. P01 Received by the Local Planning Authority on the 16th February 2026
  2. INFORMATIVE 1: Demolition and Construction, Installation, Refurbishment etc: 1. Permitted hours for building work. Demolition works and associated activities at the development, audible beyond the boundary of the site should not be carried out other than between the hours of 0800 - 1800hrs Mondays to Fridays and 0800 - 1300hrs on Saturdays and at no other times, including Sundays and Public/Bank Holidays, unless otherwise agreed with the Environmental Health Officer. 2. Notification to neighbours of demolition/ building works. At least 21 days prior to the commencement of any site works, all occupiers surrounding the site should be notified in writing of the nature and duration of works to be undertaken. The name and contact details of a person responsible for the site works should be made available for enquiries and complaints for the entire duration of the works and updates of work should be provided regularly. Any complaints should be properly addressed as quickly as possible. 3. Dust. Best Practicable Means (BPM) should be used in controlling dust emissions, in accordance with the Supplementary Planning Guidance issued by the GLA 2014 for The Control of Dust and Emissions from Construction and Demolition. 4. Dark smoke and nuisance. No waste materials should be burnt on site of the development hereby approved. 5. Noise and Vibration from demolition, piling, concrete crushing, drilling, excavating, etc. Best Practicable Means (BPM) should be used, including low vibration methods and silenced equipment and machinery, in accordance with the Approved Codes of Practice of BS5228:2009 for noise and vibration control on construction and open sites. 6. Waste management and disposal All waste materials and rubbish associated with demolition and/or construction should be contained on site in appropriate containers which, when full, should be promptly removed to a licensed disposal site.
  3. INFORMATIVE 2: Asbestos Prior to any demolition works taking place an appropriate Asbestos Survey should be undertaken by an asbestos licensed/authorised company/person and any recommendations implemented. For pre-demolition assessment the asbestos survey is fully intrusive and will involve a destructive inspection, as necessary, to gain access to all areas. Where presence of asbestos is suspected the Health and Safety Executive (HSE) and Environment Agency must be notified and special waste regulations complied with; asbestos removal activities fall under the remit of the HSE.
  4. INFORMATIVE 3: Buildings of all ages and trees with suitable features (i.e. rot-holes, cracks, fissures) are frequently used by roosting bats. Bats and roosts are protected under the 1981 Wildlife and Countryside Act, the Countryside and Rights of Way Act 2000, and The Conservation of Habitat and Species Regulations 2017 (as amended). It is a criminal offence to disturb, obstruct or destroy a bat roost, even if the roost is only occasionally used. Where a bat roost is present a licence may be necessary to carry out any works. Further information about species licensing and legislation can be obtained from the Species Licensing Service on 02080 261089. The applicant is advised that to ensure no bats are endangered during destructive works, the roof tiles should be removed carefully by hand. If evidence of bats is found during works, work should stop immediately and Natural England must be contacted on 02080 261089 for advice on the best way to proceed.
  5. INFORMATIVE 4: Work should avoid disturbance to nesting birds. Birds can nest in many places including buildings, trees, shrubs, dense ivy, and bramble/rose scrub. Nesting birds are protected under the Wildlife and Countryside Act 1981 (as amended). The main nesting season lasts approximately from March to September inclusive, so work should ideally take place outside these dates if at all possible. N.B birds can nest at any time, and the site should ideally be checked by a suitably qualified ecologist for their presence immediately before work starts, especially if during the breeding season.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.