CONDITION 1: The development to which this permission relates must not be begun later than the expiration of three years from the date of this permission. REASON: To comply with Section 91 of the Town & Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act, 2004.
CONDITION 2: The development shall be carried out in accordance with the plans and documents detailed below: The Application Form Site Location Plan - 4881-LP Proposed Site Plan - 4881-01 Existing Ground Floor Plan - 4881-02 Existing and Proposed Floor Plan - 4881-03 Existing and Proposed Floor Plan - 4881-04 Existing Elevations - 4881-05 Existing Elevations - 4881-06 Received by the Local Planning Authority on the 16th December 2026 REASON: For the avoidance of doubt and to ensure that the details of the development are acceptable to the Local Planning Authority.
CONDITION 3: The dwelling hereby approved shall incorporate measures to limit water use to no more than 110 litres per person per day within the home in accordance with the optional standard 36 (2b) of Approved Document G of the Building Regulations 2010 (as amended). REASON: In the interests of sustainability and water efficiency.
CONDITION 4: Prior to the first occupation of the dwelling broadband infrastructure shall be provided to allow broadband services to be provided. REASON: To provide broadband connectivity for future occupiers.
CONDITION 5: The dwelling hereby approved shall not be occupied until a noise assessment has been submitted to and approved in writing by the Local Planning Authority. The noise assessment shall assess existing noise levels that could adversely affect the proposed development including noise from road traffic, noise from commercial operations (including pubs and shops), general residual noise from existing operations in the area and noise from air handling and extraction plant. It shall consider and have regard to BS8233:2014 and BS4142:2014+A1: 2019 and the World Health Organisation (WHO) 'Guidelines for Community Noise and the ProPG: Planning & Noise guidance May 2017. If necessary, the noise assessment shall include full details of a noise attenuation scheme and noise mitigation measures to ensure that the internal noise climate for the dwelling achieves acceptable internal ambient noise levels. The dwelling hereby approved shall not be occupied until any approved noise attenuation scheme and noise mitigation measures have first been provided and implemented in full. Any approved noise attenuation scheme and noise mitigation measures shall subsequently be retained and maintained in perpetuity. REASON: In the interests of residential amenity and to ensure the details are acceptable to the Local Planning Authority.
INFORMATIVE 1: Asbestos Prior to any demolition, redevelopment or refurbishment works taking place an appropriate Asbestos Survey should be undertaken by an asbestos licensed/authorised company/person and any recommendations implemented. For pre-demolition assessment the asbestos survey is fully intrusive and will involve a destructive inspection, as necessary, to gain access to all areas. Where presence of asbestos is suspected the Health and Safety Executive (HSE) and Environment Agency must be notified and special waste regulations complied with; asbestos removal activities fall under the remit of the HSE.
INFORMATIVE 2: Construction hours - including internal refurbishment works To reduce the likelihood of local residents being subjected to adverse levels of noise annoyance during construction, work on site should not occur outside the following hours: - Monday - Friday 7.30 a.m. - 6.00 p.m. Saturday 8.30 a.m. - 1.00 p.m. NO WORK ON SUNDAYS & BANK HOLIDAYS. If work at other times is required permission should be obtained from the local planning authority
INFORMATIVE 3: It is a legal requirement that all new properties are numbered and roads named and in this respect you must apply for Street Naming and Numbering at the earliest opportunity for both new or changes to existing properties, including development revisions. Failure to do this in good time can delay the installation of services and/or prevent the sale of properties. To register the properties on a development and receive correct addressing or to amend an existing address please complete an application form for Street Naming and Numbering. The form can be accessed at: https://www.rugby.gov.uk/w/street-naming-and-numbering-1
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.