Council planning record

Proposed dropped kerb.

170, Addison Road, Rugby, CV22 7EY

Decision MadeReference: R25/1064Rugby Borough Council

Last published check: 1 Oct 2026, 23:39. Check the council record for more recent changes.

Application location

170, Addison Road, Rugby, CV22 7EY

This record has no verified map location.

Application summary

Status
Decision Made
Application type
8 Weeks PA
Received
3 Dec 2025
Validated
15 Jan 2026
Determination deadline
10 Mar 2026
Local authority
Rugby Borough Council

Application overview

Proposed dropped kerb.

Proposal details

Reference
R25/1064
Alternative references
PP-14531339
Ward
Admirals & Cawston, Bilton
Parish
Unparished
UPRN
100070176020

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
Sustainability appraisal R'cd 03.12.2025Sustainability ChecklistNot publishedView
The location plan R'cd 03.12.2025Site Location PlanNot publishedView
Dropped Kerb Elevations R'cd 11.12.2025Elevations16 Dec 2025View
Redacted Application Form R'cd 11.12.2025Application Form16 Dec 2025View
Composite Plans R'cd 18.12.2025Composite Plans18 Dec 2025View
Block Plan R'cd 13.01.2026Block Plan14 Jan 2026View
WCC Highways responseConsultee Comment3 Feb 2026View
decision noticeDecision Notice26 Feb 2026View
officer reportOfficer Report26 Feb 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Valid date

    Published milestoneCouncil source
  6. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approval
decision notice
Planning conditions
  1. CONDITION 5: No structure, tree, shrub or planting shall be erected, planted or retained within 2.4 metres of the near edge of the public highway carriageway fronting the site exceeding, or likely to exceed at maturity, a height of 0.9 metres above the level of the public highway carriageway. This condition relates solely to the retention of the visibility currently considered to be adequate and to not be reduced in the future. REASON: In the interests of highway safety.
  2. CONDITION 4: No gates, barriers or means of enclosure shall be erected aross a vehicular access within 6 metres of the highway boundary. All such features erected beyond that distance should be hung to open inward away from the highway. REASON: In the interests of highway safety
  3. CONDITION 3: The proposed vehicular access to the site shall not be used unless a public footway crossing has been laid out and constructed in accordance with the standard specifications of the highway authority. REASON: In the interest of highway safety.
  4. CONDITION 2: The development shall not be carried out other than in accordance with the following plans; Block Plan including drop kerb details received by the Council on 13th January 2026 REASON: For the avoidance of doubt.
  5. CONDITION 1: The development to which this permission relates must not be begun later than the expiration of three years from the date of this permission. REASON: To comply with Section 91 of the Town & Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act, 2004.
  6. INFORMATIVE: Condition number 3 requires works to be carried out within the limits of the public highway. Before commencing such works the applicant / developer must serve at least 28 days’ notice under the provisions of Section 184 of the Highways Act 1980 on the Highway Authority‘s Area Team. This process will inform the applicant of the procedures and requirements necessary to carry out works within the Highway and, when agreed, give consent for such works to be carried out under the provisions of S184. In addition, it should be noted that the costs incurred by the County Council in the undertaking of its duties in relation to the construction of the works will be recoverable from the applicant/developer. The Area Team may be contacted by telephone: (01926) 412515. In accordance with Traffic Management Act 2004 it is necessary for all works in the Highway to be noticed and carried out in accordance with the requirements of the New Roads and Street works Act 1991 and all relevant Codes of Practice. Before commencing any Highway works the applicant / developer must familiarise themselves with the notice requirements, failure to do so could lead to prosecution. Application should be made to the Street Works Manager, Budbrooke Depot, Old Budbrooke Road, Warwick, CV35 7DP. For works lasting ten days or less, ten days’ notice will be required. For works lasting longer than 10 days, three months’ notice will be required.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.