Council planning record

Removal of existing gas-fired boiler plant and installation of air source heat pump (ASHP) system

WARWICKSHIRE COUNTY COUNCIL, OAKFIELD PRIMARY SCHOOL, OAKFIELD ROAD, RUGBY, CV22 6AU

Decision MadeReference: R25/1044Rugby Borough Council

Last published check: 1 Oct 2026, 21:03. Check the council record for more recent changes.

Application location

WARWICKSHIRE COUNTY COUNCIL, OAKFIELD PRIMARY SCHOOL, OAKFIELD ROAD, RUGBY, CV22 6AU

This record has no verified map location.

Application summary

Status
Decision Made
Application type
8 Weeks PA
Received
26 Nov 2025
Validated
20 Jan 2026
Determination deadline
13 Mar 2026
Local authority
Rugby Borough Council

Application overview

Removal of existing gas-fired boiler plant and installation of air source heat pump (ASHP) system

Proposal details

Reference
R25/1044
Alternative references
PP-14427024
Ward
New Bilton
Parish
Unparished
Agent
Carlton Garratt
UPRN
100071399720

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 22 of 22

DocumentPublishedAction
Sustainability Appraisal r'cd 26.11.25SupersededNot publishedView
R'cd 26.11.25Application FormNot publishedView
Sustainability Checklist R'cd 19.12.2025Sustainability Checklist23 Dec 2025View
Sustainability Appraisal R'cd 19.12.2025Sustainability Checklist23 Dec 2025View
Site Plan R'cd 19.12.2025Superseded23 Dec 2025View
Site Location Plan R'cd 19.12.2025Superseded23 Dec 2025View
Proposed Plans R'cd 19.12.2025Superseded23 Dec 2025View
Existing Plans R'cd 16.01.2026Existing Plans16 Jan 2026View
WCC Highways- no objectionConsultee Comment2 Feb 2026View
Noise Impact AssessmentSuperseded3 Feb 2026View
EHO consultee comments 09.02.2026Consultee responses11 Feb 2026View
WCC Ecology- no objection - 03.03.2026Consultee No Objection4 Mar 2026View
block plan and revised location -001 r'cvd 16.03.2026Amended Plans17 Mar 2026View
site plan and revised location-002 r'cvd 16.03.2026Amended Plans17 Mar 2026View
elevations-003 r'cvd 16.03.2026Amended Plans17 Mar 2026View
proposed enclosure-004 r'cvd 16.03.2026Amended Plans17 Mar 2026View
Noise Impact Assessment V2 R'cvd 16.03.2026Noise Report17 Mar 2026View
Location Options AppraisalMiscellaneous Documents26 Mar 2026View
EHO comments- 2nd response -07.04.2026Consultee No Objection7 Apr 2026View
WCC Ecology response 2 no objection 09.04.2026Consultee No Objection13 Apr 2026View
R25-1044Report.pdfCommittee Report17 Jun 2026View
771833Decision_Approval_Planning_Permission_8282.pdfDecision Notice2 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Press notice start date

    Published milestoneCouncil source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Dispatch date

    Published milestoneCouncil source
  9. Decision date

    Published milestoneCouncil source
  10. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  13. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approval
771833Decision_Approval_Planning_Permission_8282.pdf
Planning conditions
  1. CONDITION 1: The development to which this permission relates must not be begun later than the expiration of three years from the date of this permission. REASON: To comply with Section 91 of the Town & Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act, 2004.
  2. CONDITION 2: The development shall be carried out in accordance with the plans and documents detailed below: OFD01-E3C-50-00G-DR-M-001/P02 - Proposed site plan; OFD01-E3C-50-00G-DR-M-002/P02 - Site location plan; OFD01-E3C-50-00G-DR-M-003/P02 - Proposed ASHP & Enclosure Elevations; OFD01-E3C-50-00G-DR-M-004/P02 - Proposed Building Elevations; Philip Dunbavin Acoustics Ltd ‘Oakfield Primary Academy, CV22 6AU New ASHP’s - Noise Impact Assessment - J005962-9335-SI-02 Received 16/03/2026 REASON: For the avoidance of doubt and to ensure that the details of the development are acceptable to the Local Planning Authority.
  3. CONDITION 3: Within 2 months of installation and commissioning of the approved Air Source Heat Pumps (ASHPs), a post-installation noise assessment shall be submitted to and approved in writing by the Local Planning Authority (LPA). The assessment shall: - Include noise measurements of the cumulative rating level (LAr,Tr) at a representative external free-field position nearest to the most noise-sensitive receptor(s). - Be undertaken in accordance with BS 4142:2014+A1:2019, with all applicable acoustic feature corrections. - Demonstrate that the rating level from the ASHP plant does not exceed 36 dB LAr,1hr (07:00- 23:00), and 30 dB LAr,15min (23:00-07:00), at the agreed receptor position. - Night-time Operating Mode: The assessment shall reflect the expected night-time operational condition described in the approved Noise Impact Assessment (PDA Ltd, ref. J005962-9335-SI-02), namely that only one ASHP operates during night-time frost-protection periods and at a reduced duty of approximately 50% (6 dB lower). If the above limits are exceeded, a scheme of additional mitigation shall be submitted to and approved in writing by the LPA, implemented in full within 2 months of approval and verified through repeat acoustic testing to demonstrate compliance. REASON: To protect the residential amenity of neighbouring occupiers from noise and disturbance in accordance with Policy SDC1 of the Rugby Borough Local Plan 2019.
  4. CONDITION 4: Prior to the first operation of the ASHP system, the existing gas-fired boiler plant hereby authorised for removal shall be fully decommissioned and removed from the site. Written confirmation of the decommissioning shall be submitted to the Local Planning Authority within 14 days of completion. REASON: To ensure the removal of the redundant fossil fuel infrastructure as proposed and to comply with the Council's climate change objectives, in accordance with Policy SDC4 of the Rugby Borough Local Plan 2019.
  5. INFORMATIVES: (I1) The applicant is advised that the installation of the ASHP units should be carried out in accordance with the Microgeneration Certification Scheme (MCS) Planning Standards (MCS 020) to help ensure compliance with the noise condition above. (I2) The decommissioning and removal of the gas supply infrastructure must be carried out in accordance with the Gas Safety (Installation and Use) Regulations 1998 and by a suitably qualified and registered engineer. This falls outside the scope of planning permission. (I3) Trees with suitable features (i.e. rot holes, cracks, fissures) are frequently used by roosting bats. Bats and roosts are protected under the 1981 Wildlife Conservation Act and the Countryside and Rights of Way Act 2000 and the Conservation of Habitat and Species Regulations 2017 (as amended). It is a criminal offence to disturb, obstruct or destroy a bat roost, even if only occasionally used. Where a bat roost is present a licence may be necessary to carry out any works. Further information about species licencing can be obtained from the Species Licencing Service on 02080261089. If evidence of bats is found during works, work should stop immediately and Natural England must be contacted on 02080261089 for advice on the best way to proceed. (I5) The Council wishes to draw the applicant's attention to the Climate Change Act 2008 and the Council's Climate Emergency Declaration. The Council strongly supports this initiative to transition from fossil fuels to low carbon heating and encourages further measures to reduce the school's overall carbon footprint.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.