CONDITION 1: The development to which this permission relates must not be begun later than the expiration of three years from the date of this permission. REASON: To comply with Section 91 of the Town & Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act, 2004.
CONDITION 2: The development shall be carried out in accordance with the plans and documents detailed below: - Application Form - Site Location Plan Drg No. RWR81/01 Received by Local Planning Authority 23.10.2025 - Proposed Plan and Elevations Drg No. RWR81/03 Rev B - Existing and Proposed Site Plan Drg No. RWR81/04 Rev B - Proposed Sections and Levels Drg No. RWR81/06 Rev A Received by Local Planning Authority 22.01.2026 REASON: For the avoidance of doubt and to ensure that the details of the development are acceptable to the Local Planning Authority.
CONDITION 3: The facing materials to be used on the external walls and roof shall be as specified on the application form, received by the Council on 23.10.2025 and on plans outlined in Condition 2. REASON: To ensure a satisfactory external appearance and for the avoidance of doubt.
CONDITION 4: When carrying out work as part of this development herby permitted, in the event that contamination is found it shall be reported in writing immediately to the local planning authority. Each of the following subsections a) to c) shall then be subject to approval in writing by the local planning authority. a) An investigation and risk assessment shall be undertaken in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. b) Where remediation is necessary a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment shall be prepared. c) Following completion of measures identified in the approved remediation scheme, a verification report that demonstrates the effectiveness of the remediation carried out shall be prepared and which shall be subject to approval in writing by the local planning authority. REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, ecological systems, property and residential amenity and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
INFORMATIVE 1: Environmental Services advise that in order to reduce the likelihood of local residents being subjected to adverse levels of noise annoyance during construction, work on site should not occur outside the following hours: - Monday - Friday - 7.30 a.m. - 6.00 p.m. Saturday - 8.30 a.m. - 1.00 p.m. No work on Sundays & Bank Holidays.
INFORMATIVE 2: Prior to any demolition, redevelopment or refurbishment works taking place an appropriate Asbestos Survey should be undertaken by an asbestos licensed/authorised company/person and any recommendations implemented. For pre-demolition assessment the asbestos survey is fully intrusive and will involve a destructive inspection, as necessary, to gain access to all areas. Where presence of asbestos is suspected the Health and Safety Executive (HSE) and Environment Agency must be notified and special waste regulations complied with; asbestos removal activities fall under the remit of the HSE.
INFORMATIVE 3: The applicant is encouraged to incorporate measures to assist in reducing their impact upon the Air Quality Management Area as part of this development. Initiatives could include the installation of an ultra-low emission boiler (<40mg/kWh), increased tree planting/landscaping, solar thermal panels, and the incorporation of electric vehicle charging points on any car parking. More information on plants that can be incorporated into landscaping for green walls and roofs can be found here: https://www.museumoflondon.org.uk/application/files/4915/2604/2216/2018-05-11-phytosensor-final-web-ok-compressed_1.pdf Such measures contribute towards improving air quality. Should you require any further advice on ensuring your development has a positive contribution on air quality, further information can be obtained from the Commercial Regulation team through 01788 533533 or email ehcs@rugby.gov.uk Should an Air Source Heat Pump be proposed for installation, it should be ensured that the noise from such plant will not adversely affect residential amenity in the area. These units can create noticeable noise levels which may affect neighbouring dwellings so noise mitigation may be necessary to avoid complaints or possible formal action under other legislation.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.