CONDITION 1: Contaminated land No development other than that required to be carried out as part of an approved scheme of remediation shall commence, in any phase of the development, until condition (a) to (d) below have been complied with [for that phase]. If unexpected contamination is found after development has begun, development shall be halted on that part of the site affected by the unexpected contamination to the extent specified in writing by the local planning authority until condition (d) below has been complied with in relation to that contamination. (a) An investigation and risk assessment shall be completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme shall be subject to approval in writing by the local planning authority. The investigation and risk assessment shall be undertaken by competent persons and a written report of the findings shall be produced. The written report shall be subject to approval in writing by the local planning authority. The report of the findings shall include: (i) a survey of the extent, scale and nature of contamination; (ii) an assessment of the potential risks to human health, existing or proposed property and buildings, crops, livestock, pets, woodland and service lines and pipes, adjoining land, groundwaters and surface waters, ecological systems, archaeological sites and ancient monuments; and (iii) an appraisal of remedial options, and proposal of the preferred option(s) to be conducted in accordance with UK Government and the Environment Agency's Land Contamination Risk Management (LCRM) 8th October 2020. (b) A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment shall be prepared and subject to approval in writing by the local planning authority. The scheme shall include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme shall ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. (c) The approved remediation scheme shall be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation. The local planning authority shall be given two weeks written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a verification report that demonstrates the effectiveness of the remediation carried out shall be prepared and subject to approval in writing by the local planning authority. (d) In the event that contamination is found at any time when carrying out the development hereby permitted that was not previously identified it shall be reported in writing immediately to the local planning authority. An investigation and risk assessment shall be undertaken in accordance with the requirements of condition (a) and where remediation is necessary a remediation scheme shall be prepared in accordance with the requirements of condition (b) which shall be subject to approval in writing by the local planning authority. Following completion of measures identified in the approved remediation scheme a verification report shall be prepared, which shall be subject to approval in writing by the local planning authority in accordance with condition (c). REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, ecological systems, property and residential amenity and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
CONDITION 2: Noise assessment Prior to commencement of works a noise assessment shall be undertaken by a suitably qualified person and be submitted in writing to and approved by the Local Planning Authority. It shall assess the existing noise levels that could adversely affect the proposed development. Regard shall be had to noise from the stables. menage and any other existing farming activities and general residual noise from other existing operations in the area. Regard may be had to BS8233:2014 and BS4142:2014+A1: 2019 and the World Health Organisation (WHO) - Guidelines for Community Noise and the ProPG: Planning & Noise guidance May 2017. The report shall include recommendations for any necessary acoustic mitigation works, to protect the occupants both inside the dwelling and the external amenity spaces, having regard to current guidance for the residential development. Any recommended works shall be completed prior to occupation of the development and should be maintained thereafter. REASON: in the interests of residential amenity and to ensure the details are acceptable to the Local Planning Authority
INFORMATIVE 1: Many buildings contain wildlife such as bats and nesting birds that are protected by law. Works carried out under Permitted Development Rights do not override the protection afforded to these species and their habitats. You must take steps to ensure that the work you are carrying out will not harm any protected species, and if it may do so you must also obtain permission from Natural England prior to carrying out the work. WCC Ecological Services have suggested that the proposed works may impact bats and advise that a bat survey should be carried out. For more information on protected species please see https://www.bats.org.uk/advice/im working-on-a-building-with-bats
INFORMATIVE 2: The applicant is advised barn owls have been recorded in the area. The barn owl is a protected species which is declining in number. This is partly due to a lack of breeding sites. Many types of building can be adapted so that barn owls can use them. For example, most barn conversions can have a suitable access hole and nesting platform for barn owls incorporated into the design. The barn owl is listed under Schedule 1 of the Wildlife and Countryside act 1981. The birds, their young, nests and eggs are protected. A fine or custodial sentence may be applied to an offence against barn owls. It is also an offence to disturb barn owls on an active nest with eggs, young or before the eggs have hatched, or to disturb parent dependant young. Further information is available from the Barn Owl Trust at www.barnowltrust.org.uk.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.