Council planning record

Hybrid planning application comprising: - Full planning application for the erection of one Use Class B8 (Warehousing and Distribution) unit, with ancillary Use E(G)(i) (offices) with associated infrastructure including vehicle parking and service areas (including lorry parking), sustainable drainage provision, gate house, sprinkler tanks, pump houses, gas and electricity substations. Earthworks and plateauing of the wider development site including the formation of bunds. Completion of the Sustainable Transport Corridor connection to adjacent land to the east and the creation of the Potsford Dam link to the A4701 roundabout including associated landscaping and infrastructure, bridge to Cawston Greenway and the creation of the Cawston Landscape Park. - Outline planning application for Use Class B8 (Warehousing and Distribution) units with ancillary Use Class (G)(i) (offices) with associated site infrastructure including vehicle parking and service areas (including lorry parking), energy centre, landscaping, sustainable drainage system. All matters reserved expect means of access.

Land To The North Of Symmetry Park, Western Link, Rugby

Consultation Carried OutReference: R25/0896Rugby Borough Council

Last published check: 3 Oct 2026, 02:05. Check the council record for more recent changes.

Application location

Land To The North Of Symmetry Park, Western Link, Rugby

This record has no verified map location.

Application summary

Status
Consultation Carried Out
Application type
App with EIA
Received
6 Oct 2025
Validated
21 Oct 2025
Determination deadline
3 Feb 2026
Local authority
Rugby Borough Council

Application overview

Hybrid planning application comprising: - Full planning application for the erection of one Use Class B8 (Warehousing and Distribution) unit, with ancillary Use E(G)(i) (offices) with associated infrastructure including vehicle parking and service areas (including lorry parking), sustainable drainage provision, gate house, sprinkler tanks, pump houses, gas and electricity substations. Earthworks and plateauing of the wider development site including the formation of bunds. Completion of the Sustainable Transport Corridor connection to adjacent land to the east and the creation of the Potsford Dam link to the A4701 roundabout including associated landscaping and infrastructure, bridge to Cawston Greenway and the creation of the Cawston Landscape Park. - Outline planning application for Use Class B8 (Warehousing and Distribution) units with ancillary Use Class (G)(i) (offices) with associated site infrastructure including vehicle parking and service areas (including lorry parking), energy centre, landscaping, sustainable drainage system. All matters reserved expect means of access.

Proposal details

Reference
R25/0896
Alternative references
PP-14195802
Ward
Admirals & Cawston, Dunsmore
Parish
Cawston, Dunchurch, Thurlaston
Agent
Louise Steele
UPRN
10096547057

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 334 of 334

DocumentPublishedAction
Statement of community involvement Part 5 of 6 (Apdx 5 cont) - Rcd 06.10.2025Supplementary Report6 Oct 2025View
Statement of community involvement Part 4 of 6 (Apdx 5 cont)- Rcd 06.10.2025Supplementary Report6 Oct 2025View
Statement of community involvement Part 3 of 6 (Apdx 5 cont) - Rcd 06.10.2025Supplementary Report6 Oct 2025View
Statement of community involvement Part 2 of 6 (Apdx 3-5) - Rcd 06.10.2025Supplementary Report6 Oct 2025View
Statement of community involvement Part 1 of 6 - Rcd 06.10.2025Supplementary Report6 Oct 2025View
Statement of community involvement Part 6 of 6 (Apdx 5-7) - Rcd 06.10.2025Supplementary Report6 Oct 2025View
Community Infrastructure Levy - Completed form - Rcd 06.10.2025CIL form6 Oct 2025View
Environmental Statement Non Technical Summary Part 4 of 6 - Rcd 06.10.2025Environmental Statement6 Oct 2025View
Environmental Statement Non Technical Summary Part 3 of 6 - Rcd 06.10.2025Environmental Statement6 Oct 2025View
Environmental Statement Non Technical Summary Part 2 of 6 - Rcd 06.10.2025Environmental Statement6 Oct 2025View
Environmental Statement Non Technical Summary Part 1 of 6 - Rcd 06.10.2025Environmental Statement6 Oct 2025View
Environmental Statement Non Technical Summary Part 6 of 6 - Rcd 06.10.2025Environmental Statement6 Oct 2025View
Environmental Statement Non Technical Summary Part 5 of 6 - Rcd 06.10.2025Environmental Statement6 Oct 2025View
ES V1 Environmental statement Main Report - Rcd 06.10.2025Environmental Statement6 Oct 2025View
ES V2 Landscape Strategy - Rcd 06.10.2025Landscaping6 Oct 2025View
Potford Dam Link Surface Water Drainage Strategy Part 1 of 5 - Rcd 06.10.2025Drainage6 Oct 2025View
Potford Dam Link Surface Water Drainage Strategy Part 5 of 5 - Rcd 06.10.2025Drainage6 Oct 2025View
Potford Dam Link Surface Water Drainage Strategy Part 4 of 5 - Rcd 06.10.2025Drainage6 Oct 2025View
Potford Dam Link Surface Water Drainage Strategy Part 3 of 5 - Rcd 06.10.2025Drainage6 Oct 2025View
Potford Dam Link Surface Water Drainage Strategy Part 2 of 5 - Rcd 06.10.2025Drainage6 Oct 2025View
Full - Land to be dedicated - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Potford Dam DrainageDrainage6 Oct 2025View
Full - Contours and Longsections Sheet 4 of 4 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Contours and Longsections Sheet 3 of 4 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Contours and Longsections Sheet 2 of 4 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Contours and Longsections Sheet 1 of 4 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - General Arrangement Sheet 3 of 3 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - General Arrangement Sheet 2 of 3 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - General Arrangement Sheet 1 of 3 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Design and access statement - Rcd 06.10.2025Design and Access Statement6 Oct 2025View
Ground Investigation Report Part 4 of 7 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground Investigation Report Part 3 of 7 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground Investigation Report Part 2 of 7 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground Investigation Report Part 1 of 7 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Health Impact Assessment Screening Report Part 2 of 3 - Rcd 06.10.2025Supplementary Report6 Oct 2025View
Health Impact Assessment Screening Report Part 2 of 3 - Rcd 06.10.2025Supplementary Report6 Oct 2025View
Health Impact Assessment Screening Report Part 1 of 3 - Rcd 06.10.2025Supplementary Report6 Oct 2025View
Electric Vehicle Charging Statement - Rcd 06.10.2025Supplementary Report6 Oct 2025View
Broadband Statement - Telecoms supplementary info - Rcd 06.10.2025Supplementary Report6 Oct 2025View
Potsford Dam Link - Channel Diversion Modelling Part 3 of 3 - Rcd 06.10.2025Drainage6 Oct 2025View
Potsford Dam Link - Channel Diversion Modelling Part 2 of 3 - Rcd 06.10.2025Drainage6 Oct 2025View
Potsford Dam Link - Channel Diversion Modelling Part 1 of 3 - Rcd 06.10.2025Drainage6 Oct 2025View
Site waste management strategy Part 3 of 3 - Rcd 06.10.2025Supplementary Report6 Oct 2025View
Site waste management strategy Part 2 of 3 - Rcd 06.10.2025Supplementary Report6 Oct 2025View
Site waste management strategy Part 1 of 3 - Rcd 06.10.2025Supplementary Report6 Oct 2025View
Economic Impact Assessment - Rcd 06.10.2025Supplementary Report6 Oct 2025View
Preliminary Risk Assessment Report for Eastern Parcel Part 3 of 3 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Preliminary Risk Assessment Report for Eastern Parcel Part 2 of 3 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Preliminary Risk Assessment Report for Eastern Parcel Part 1 of 3 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground IR - Technical Note Service Trenches - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground IR - Technical Note Roundabout Part 9 of 9 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground IR - Technical Note Roundabout Part 8 of 9 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground IR - Technical Note Roundabout Part 7 of 9 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground IR - Technical Note Roundabout Part 6 of 9 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground IR - Technical Note Roundabout Part 5 of 9 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground Investigation Report Part 5 of 7 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground IR - Technical Note Roundabout Part 4 of 9 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground IR - Technical Note Roundabout Part 3 of 9 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground IR - Technical Note Roundabout Part 2 of 9 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground IR - Technical Note Roundabout Part 1 of 9 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground IR -Technical Note Initial Investigation- Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Preliminary Risk Assessment Report Potford Dam Link Part 3 of 3 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Preliminary Risk Assessment Report Potford Dam Link Part 2 of 3 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Preliminary Risk Assessment Report Potford Dam Link Part 1 of 3 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground Investigation Report Part 7 of 7 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Ground Investigation Report Part 6 of 7 - Rcd 06.10.2025Environmental Statement (part)6 Oct 2025View
Both - Site Levels Plan 60 76 - Proposed - Rcd 06.10.2025Plans6 Oct 2025View
Both - Site Levels Plan 60 75 - Proposed - Rcd 06.10.2025Plans6 Oct 2025View
Both - Site Levels Plan 60 74 - Proposed - Rcd 06.10.2025Plans6 Oct 2025View
Both - Site Levels Plan 60 73 - Proposed - Rcd 06.10.2025Plans6 Oct 2025View
Both - Site Levels Plan 60 72 - Proposed - Rcd 06.10.2025Plans6 Oct 2025View
Both - Site Levels Plan 60 71 - Proposed - Rcd 06.10.2025Plans6 Oct 2025View
Both - Earthworks - Rcd 06.10.2025Plans6 Oct 2025View
Both - Cut and Fill Analysis Earthworks - Rcd 06.10.2025Plans6 Oct 2025View
Full - Roundabout Visibilties - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Roundabout Geometry - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Cawston Landscape Park detailsLandscaping6 Oct 2025View
Full - Soft Landscaping detailsSuperseded6 Oct 2025View
Full - Bridge Plan - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Street Lighting Plan - Rcd 06.10.2025Plans6 Oct 2025View
Full - Vehicle Swept Paths Sheet 2 of 2 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Vehicle Swept Paths Sheet 1 of 2 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Proposed Unit 8 Sections - Rcd 06.10.2025Plans6 Oct 2025View
Full - External Materials - Rcd 06.10.2025Plans6 Oct 2025View
Full - Area Plans - Unit 8 Rcd 06.10.2025Plans6 Oct 2025View
Full - Proposed Unit 8 Elevations - Rcd 06.10.2025Plans6 Oct 2025View
Full - Unit 8 External Works Sheet 1 - Rcd 06.10.2025Plans6 Oct 2025View
Both - Pump Station compound layout Plan - Proposed - Rcd 06.10.2025Plans6 Oct 2025View
Both - Illustrative Masterplan - Rcd 06.10.2025Plans6 Oct 2025View
Both - Parameters Plan - Rcd 06.10.2025Plans6 Oct 2025View
Both - Context Plan - Rcd 06.10.2025PlansNot publishedView
The location plan - Red line only - Rcd 06.10.2025Site Location Plan6 Oct 2025View
The location plan - Red and blue line - Rcd 06.10.2025Site Location Plan6 Oct 2025View
Full - Proposed Gatehouse - Elevation (Front) - Rcd 06.10.2025Plans6 Oct 2025View
Full - Sprinkler Tanks - Rcd 06.10.2025Plans6 Oct 2025View
Full - RMU - Rcd 06.10.2025Plans6 Oct 2025View
Full - Bin Storage - Rcd 06.10.2025Plans6 Oct 2025View
Full - Cycle Shelters - Rcd 06.10.2025Plans6 Oct 2025View
Full - Fencing Details - Rcd 06.10.2025Plans6 Oct 2025View
Full - Proposed Unit 8 Site PlanSite, Location or Block Plan6 Oct 2025View
Full - Unit 8 Roof Plan Full PV Cover - Rcd 06.10.2025Plans6 Oct 2025View
Full - Proposed U8 Area PLan - Rcd 06.10.2025Plans6 Oct 2025View
Full - Unit 8 Proposed Office Layout Plan - Rcd 06.10.2025Plans6 Oct 2025View
Full - Unit 8 Proposed Warehouse Layout Plan - Rcd 06.10.2025Plans6 Oct 2025View
Full - Unit 8 Roof Plan Partial PV - Rcd 06.10.2025Plans6 Oct 2025View
Outline - External Works Sheet 6 - Rcd 06.10.2025Plans6 Oct 2025View
Outline - External Works Sheet 5 - Rcd 06.10.2025Plans6 Oct 2025View
Outline - External Works Sheet 4 - Rcd 06.10.2025Plans6 Oct 2025View
Outline - External Works Sheet 3 - Rcd 06.10.2025Plans6 Oct 2025View
Full - Unit 8 External Works Sheet 2- Rcd 06.10.2025Plans6 Oct 2025View
ES V2 Framework Travel Plan Part 1 - Rcd 06.10.2025Transport Report6 Oct 2025View
ES V2 Framework Travel Plan Part 4 (Apdx C) - Rcd 06.10.2025Transport Report6 Oct 2025View
ES V2 Framework Travel Plan Part 3 (Apdx B) - Rcd 06.10.2025Transport Report6 Oct 2025View
ES V2 Framework Travel Plan Part 2 (Apdx A) - Rcd 06.10.2025Transport Report6 Oct 2025View
ES V2 Wirelines - Rcd 06.10.2025Landscaping6 Oct 2025View
ES V2 AIA Part 3 (Plans EDP2) - Rcd 06.10.2025Tree Report/plan6 Oct 2025View
ES V2 AIA Part 2 (Plans EDP1-EDP2) - Rcd 06.10.2025Tree Report/plan6 Oct 2025View
ES V2 AIA Part 1 (inc all Appendices) - Rcd 06.10.2025Tree Report/plan6 Oct 2025View
ES V2 Cumulative Assessment - Rcd 06.10.2025Landscaping6 Oct 2025View
ES V2 Table of Effects Visual Amenity - Rcd 06.10.2025Landscaping6 Oct 2025View
ES V2 LVIA Baseline Assessment - Rcd 06.10.2025Landscaping6 Oct 2025View
ES V2 Land at Cawston, Rugby, Warwickshire Geophysical Survey Report - Rcd 06.10.2025Archaeology Report6 Oct 2025View
ES V2 Units 1 and 2 Symmetry Park Archaeological Excavation Report Part 5 - Rcd 06.10.2025Archaeology Report6 Oct 2025View
ES V2 Units 1 and 2 Symmetry Park Archaeological Excavation Report Part 4 - Rcd 06.10.2025Archaeology Report6 Oct 2025View
ES V2 Units 1 and 2 Symmetry Park Archaeological Excavation Report Part 3 - Rcd 06.10.2025Archaeology Report6 Oct 2025View
ES V2 Figure Showing Links Comprising the Study Area - Rcd 06.10.2025Transport Report6 Oct 2025View
ES V2 Transport Nat and Local Policy and Guidance - Rcd 06.10.2025Transport Report6 Oct 2025View
ES V2 HGV Route Managment Strategy - Rcd 06.10.2025Transport Report6 Oct 2025View
ES V2 Transport Assessment Part 7 - (Apdx J-K) - Rcd 06.10.2025Transport Report6 Oct 2025View
ES V2 Transport Assessment Part 6 - (Apdx J cont) - Rcd 06.10.2025Transport Report6 Oct 2025View
ES V2 Transport Assessment Part 5 - (Apdx I-J) - Rcd 06.10.2025Transport Report6 Oct 2025View
ES V2 Transport Assessment Part 4 - (Apdx F-I) - Rcd 06.10.2025Transport Report6 Oct 2025View
ES V2 Transport Assessment Part 3 (Apdx E-F) - Rcd 06.10.2025Transport Report6 Oct 2025View
ES V2 Transport Assessment Part 2 (Apdx A-D) - Rcd 06.10.2025Transport Report6 Oct 2025View
ES V2 Transport Assessment Part 1 - Rcd 06.10.2025Transport Report6 Oct 2025View
ES V2 Economic Impact Assessment - Rcd 06.10.2025Supplementary Report6 Oct 2025View
ES V2 Sound Survey Time History Graphs - Rcd 06.10.2025Noise Report6 Oct 2025View
ES V2 Noise and Vibration Figures - Rcd 06.10.2025Noise Report6 Oct 2025View
ES V2 Sound Survey Equipment Calibration Information - Rcd 06.10.2025Noise Report6 Oct 2025View
ES V2 Noise and Vibration Policy Context Legislation Guidance - Rcd 06.10.2025Noise Report6 Oct 2025View
ES V2 Photomontages - Rcd 06.10.2025Landscaping6 Oct 2025View
ES V2 LEMP Unit 8 Part 3 (Apdx EPD2) - Rcd 06.10.2025Ecology Report6 Oct 2025View
ES V2 LEMP Unit 8 Part 2 (Apdx EPD1 cont-EPD2) - Rcd 06.10.2025Ecology Report6 Oct 2025View
ES V2 LEMP Unit 8 Part 1 - Rcd 06.10.2025Ecology Report6 Oct 2025View
ES V2 Woodland Managment Plan Part 6 (Apdx 4-6 and Plans) - Rcd 06.10.2025Tree Report/plan6 Oct 2025View
ES V2 Woodland Managment Plan Part 5 (Apdx 3-4) - Rcd 06.10.2025Tree Report/plan6 Oct 2025View
ES V2 Woodland Managment Plan Part 4 (Apdx 1-3) - Rcd 06.10.2025Tree Report/plan6 Oct 2025View
ES V2 Woodland Managment Plan Part 3 (Apdx 1 cont) - Rcd 06.10.2025Tree Report/plan6 Oct 2025View
ES V2 Woodland Managment Plan Part 2 (Apdx 1 cont) - Rcd 06.10.2025Tree Report/plan6 Oct 2025View
ES V2 Woodland Managment Plan Part 1 - Rcd 06.10.2025Tree Report/plan6 Oct 2025View
ES V2 Units 1 and 2 Symmetry Park Archaeological Excavation Report Part 2 - Rcd 06.10.2025Archaeology Report6 Oct 2025View
ES V2 Units 1 and 2 Symmetry Park Archaeological Excavation Report Part 1 - Rcd 06.10.2025Archaeology Report6 Oct 2025View
ES V2 Land N. of A45/M45 junction Rugby Archaeological Evaluation Report - Rcd 06.10.2025Archaeology Report6 Oct 2025View
ES V2 Land at Cawston Farm (Phase II) Archaeological Excavation Report - Rcd 06.10.2025Archaeology Report6 Oct 2025View
ES V2 Land at Cawston Farm Archaeological Evaluation Report - Rcd 06.10.2025Archaeology Report6 Oct 2025View
ES V2 Geophysical Survey Report G1503 Part 2 (Figs 9-16) - Rcd 06.10.2025Archaeology Report6 Oct 2025View
ES V2 Geophysical Survey Report G1503 Part 1 (Figs 1-8) - Rcd 06.10.2025Archaeology Report6 Oct 2025View
ES V2 WSI for an Archaeological Evaluation - Rcd 06.10.2025Archaeology Report6 Oct 2025View
ES V2 WSI for an Archaeological and Heritage Baseline Assessment - Rcd 06.10.2025Archaeology Report6 Oct 2025View
ES V2 Archaeological and Heritage Baseline Assessment - Rcd 06.10.2025Archaeology Report6 Oct 2025View
ES V2 Climate Projections Data and Figures - Rcd 06.10.2025Environmental Statement Appendix6 Oct 2025View
ES V2 FRA Part 2 - Rcd 06.10.2025Flood Risk Assessment6 Oct 2025View
ES V2 FRA Part 1 - Rcd 06.10.2025Flood Risk Assessment6 Oct 2025View
ES V2 Outline Energy Statement and Sustainability Checklist - Rcd 06.10.2025Sustainability Checklist6 Oct 2025View
ES V2 Climate Change Policy and Guidance - Rcd 06.10.2025Environmental Statement Appendix6 Oct 2025View
ES V2 PSMS Rcd 06.10.2025Ecology Report6 Oct 2025View
ES V2 LEMP Unit 8 Part 4 (Apdx EPD3-EPD4) - Rcd 06.10.2025Ecology Report6 Oct 2025View
ES V2 Ecological Receptor Results - Rcd 06.10.2025Air Quality Report6 Oct 2025View
ES V2 Human Receptor Results - Rcd 06.10.2025Air Quality Report6 Oct 2025View
ES V2 Road Traffic Emissions Air Quality Model Verification - Rcd 06.10.2025Air Quality Report6 Oct 2025View
ES V2 Road Traffic Emissions Air Quality Model Inputs and Results Processing - Rcd 06.10.2025Air Quality Report6 Oct 2025View
ES V2 EPUK IAQM Guidance (2017) Screening Criteria - Rcd 06.10.2025Air Quality Report6 Oct 2025View
ES V2 Construction and Dust Assessment - Rcd 06.10.2025Air Quality Report6 Oct 2025View
ES V2 Air Q Leg and Policy Context - Rcd 06.10.2025Air Quality Report6 Oct 2025View
ES V2 Committed Developments - Rcd 06.10.2025Environmental Statement Appendix6 Oct 2025View
ES V2 BNG Assessment Part 7 (Apdx EDP 4 and Plans) - Rcd 06.10.2025Ecology Report6 Oct 2025View
ES V2 BNG Assessment Part 6 (Apdx EDP3) - Rcd 06.10.2025Ecology Report6 Oct 2025View
ES V2 BNG Assessment Part 5 (Apdx EDP3) - Rcd 06.10.2025Ecology Report6 Oct 2025View
ES V2 BNG Assessment Part 4 (Apdx EDP3) - Rcd 06.10.2025Ecology Report6 Oct 2025View
ES V2 BNG Assessment Part 3 (Apdx EDP2) - Rcd 06.10.2025Ecology Report6 Oct 2025View
ES V2 BNG Assessment Part 2 (Apdx EDP1 cont-EDP2) - Rcd 06.10.2025Ecology Report6 Oct 2025View
ES V2 BNG Assessment Part 1 - Rcd 06.10.2025Ecology Report6 Oct 2025View
ES V2 Soil Sampling Map - Rcd 06.10.2025Environmental Statement Appendix6 Oct 2025View
ES V2 Site Agricultural Land Classification - Rcd 06.10.2025Environmental Statement Appendix6 Oct 2025View
ES V2 Kernon Countryside Consultants Limited Agricultural Land Classification Report - Rcd 06.10.2025Environmental Statement Appendix6 Oct 2025View
ES V2 Air Quality Figures - Rcd 06.10.2025Air Quality Report6 Oct 2025View
ES V2 Potford Dam Link Road Drawings - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - ES V2 Unit 8 Drawings Part 3 - Rcd 06.10.2025Plans6 Oct 2025View
Full - ES V2 Unit 8 Drawings Part 2 - Rcd 06.10.2025Plans6 Oct 2025View
Full - ES V2 Unit 8 Drawings Part 1 - Rcd 06.10.2025Plans6 Oct 2025View
ES V2 Parameter Plan - Rcd 06.10.2025Plans6 Oct 2025View
ES V2 Statement of Expertise - Rcd 06.10.2025Environmental Statement Appendix6 Oct 2025View
ES V2 Site Location Plan Rcd 06.10.2025Site Location Plan6 Oct 2025View
Both - ES V2 Phasing Plan - Rcd 06.10.2025Plans6 Oct 2025View
ES V2 Lighting Impact Assessment - Rcd 06.10.2025Supplementary Report6 Oct 2025View
ES V2 Surface Water Drainage Strategy Part 2 of 2 - Rcd 06.10.2025Drainage6 Oct 2025View
ES V2 Surface Water Drainage Strategy Part 1 of 2 - Rcd 06.10.2025Drainage6 Oct 2025View
ES V2 Illustrative Masterplan and Landscape Strategy - Rcd 06.10.2025Landscaping6 Oct 2025View
ES V2 Soft Landscape Proposals Part 2 of 3 - Rcd 06.10.2025Landscaping6 Oct 2025View
ES V2 Soft Landscape Proposals Part 2 of 3 - Rcd 06.10.2025Landscaping6 Oct 2025View
ES V2 Soft Landscape Proposals Part 1 of 3 - Rcd 06.10.2025Landscaping6 Oct 2025View
Full - Impermeable Areas Plan - Rcd 06.10.2025Superseded6 Oct 2025View
Both - Drainage Construction Details Sheet 2 of 2 - Rcd 06.10.2025Drainage6 Oct 2025View
Both - Drainage Construction Details Sheet 1 of 2- Rcd 06.10.2025Drainage6 Oct 2025View
Both - Proposed Foul Water Drainage Sheet 6 - Rcd 06.10.2025Superseded6 Oct 2025View
Outline - Proposed Drainage Layout Sheet 5 - Rcd 06.10.2025Superseded6 Oct 2025View
Outline - Proposed Drainage Layout Sheet 4 - Rcd 06.10.2025Superseded6 Oct 2025View
Outline - Proposed Drainage Layout Sheet 3 - Rcd 06.10.2025Superseded6 Oct 2025View
Full - Proposed Drainage Layout Sheet 2 - Rcd 06.10.2025Drainage6 Oct 2025View
Full - Proposed Drainage Layout Sheet 1 - Rcd 06.10.2025Drainage6 Oct 2025View
Full - Pond Section - Proposed - Rcd 06.10.2025Drainage6 Oct 2025View
Full - External Construction Details - Rcd 06.10.2025Drainage6 Oct 2025View
Both - 1 in 100 Roundabout Drainage documentationDrainage6 Oct 2025View
Outline - Surface Water Drainage CalcsDrainage6 Oct 2025View
Full - Surface Water Drainage CalcsDrainage6 Oct 2025View
Full - Section - ProposedDrainage6 Oct 2025View
Full - Watercourse CulvertDrainage6 Oct 2025View
Full - Drainage and Services - Rcd 06.10.2025Drainage6 Oct 2025View
Full - Foul Connection PointDrainage6 Oct 2025View
Both - SuDS Maintenance Plan supporting informationDrainage6 Oct 2025View
Both - Existing Exceedance Sheet 6 - Rcd 06.10.2025Drainage6 Oct 2025View
Both - Existing Exceedance Sheet 5 - Rcd 06.10.2025Drainage6 Oct 2025View
Both - Existing Exceedance Sheet 4 - Rcd 06.10.2025Drainage6 Oct 2025View
Both - Existing Exceedance Sheet 3 - Rcd 06.10.2025Drainage6 Oct 2025View
Both - Existing Exceedance Sheet 2 - Rcd 06.10.2025Drainage6 Oct 2025View
Both - Existing Exceedance Sheet 1 - Rcd 06.10.2025Drainage6 Oct 2025View
Both - Proposed Exceedance Sheet 6 - Rcd 06.10.2025Drainage6 Oct 2025View
Both - Proposed Exceedance Sheet 5 - Rcd 06.10.2025Drainage6 Oct 2025View
Both - Proposed Exceedance Sheet 4 - Rcd 06.10.2025Drainage6 Oct 2025View
Both - Proposed Exceedance Sheet 3 - Rcd 06.10.2025Drainage6 Oct 2025View
Both - Proposed Exceedance Sheet 2 - Rcd 06.10.2025Drainage6 Oct 2025View
Both - Proposed Exceedance Sheet 1 - Rcd 06.10.2025Drainage6 Oct 2025View
Full - Site Clearance - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 10 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 09 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 08 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 07 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 06 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 05 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 04 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 03 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 02 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Both - Units 08 to 11-Proposed Ground-Contours & Levels-Sheet 01 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - General Arrangement (SE roundabout) - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Risk Management - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Signs and Markings - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Kerbs and Footways - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Carriageway and Pavement - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 07 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 06 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 05 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 04 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 03 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 02 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 01 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Full - Complete Vehicle Tracking U08 and Roundabout-SHEET 08 - Rcd 06.10.2025Highway plans/information6 Oct 2025View
Application Form - Without Personal Data - Rcd 06.10.2025Application Form6 Oct 2025View
Amended Cover letter Dated 03/10/25Application Letter7 Oct 2025View
Redacted ES V2 Baseline Ecology Report Part 1 - Rcd 06.10.2025Ecology Report6 Oct 2025View
BNG Metric - Rcd 13.10.2025Superseded13 Oct 2025View
Amended Planning Statement - Rcd 13.10.2025Planning Statement13 Oct 2025View
Existing Levels (from FRA) - Rcd 06.10.2025Existing Plans6 Oct 2025View
Design Code Compliance Tracker - Rcd 13.10.2025Planning Statement21 Oct 2025View
Transport Assessment Addendum 332612140-003 - Rcd 04.11.2025Transport Report4 Nov 2025View
Road Safety Audit 1 - Rcd 11.11.2025Highway plans/information11 Nov 2025View
Transport Assessment Addendum Appendix A - 14/11/25Transport Report14 Nov 2025View
Transport Assessment Addendum Appendix B - 14/11/25Transport Report14 Nov 2025View
Road Safety Audit Brief - Rcd 17.11.2025Highway plans/information17 Nov 2025View
Full - Unit 8 lighting, from ES V2 Lighting Impact Assessment - Rcd 06.10.2025Plans26 Nov 2025View
Road Safety Audit response, PDL - 28/11/25Highway plans/information28 Nov 2025View
Tree Schedule - 02/02/2026Tree Report/plan3 Feb 2026View
Received 24/02/2026Drainage24 Feb 2026View
Received 24/02/2026Drainage24 Feb 2026View
Received 24/02/2026Drainage24 Feb 2026View
Received 24/02/2026Drainage24 Feb 2026View
Received 24/02/2026Drainage24 Feb 2026View
Received 24/02/2026Highway plans/information24 Feb 2026View
Received 24/02/2026Drainage24 Feb 2026View
Received 24/02/2026Drainage24 Feb 2026View
Received 24/02/2026Drainage24 Feb 2026View
Amended Full - Soft Landscaping details unit 8 rec'd 25/02/26Landscaping25 Feb 2026View
Revised BNG Metric - Rcd 25/02/26Ecology Report25 Feb 2026View
Ecology letter from EDP rec'd 25/02/2026Ecology Report25 Feb 2026View
Hydraulic Modelling - 09/03/2026Drainage10 Mar 2026View
Hydraulic Model Review - 09/03/2026Drainage10 Mar 2026View
Hydraulic Model QA & QC - 09/03/2026Drainage10 Mar 2026View
Technical Note - Potford Dam Link - Channel Diversion ModellingDrainage20 Apr 2026View
Technical Note - Potford Dam Link Road - Response to LLFA CommentsDrainage20 Apr 2026View
Response to LLFA QueriesDrainage20 Apr 2026View
Storm Water and SuDS Maintenance PlanDrainage20 Apr 2026View
Unit 8 - Car park water quality assessment Rev ADrainage20 Apr 2026View
Unit 8 - Proposed Drainage Layout SheetsSuperseded20 Apr 2026View
Unit 8 - Surface Water Drainage Calcs-P4 (Surcharged)Drainage20 Apr 2026View
Unit 8 - Surface Water Drainage Calcs-P4Drainage20 Apr 2026View
Units 8-11 - Attenuation Basin Sections and Exceedance PlansDrainage20 Apr 2026View
Units 8-11 - Cut and Fill Earthworths AnalysisDrainage20 Apr 2026View
Units 8-11 - Impermeable Areas PlanDrainage20 Apr 2026View
Units 8-11 - Proposed Drainage Layout SheetsSuperseded20 Apr 2026View
Units 8-11 - Proposed Ground-Contours and LevelsDrainage20 Apr 2026View
Units 9-11 - Surface Water Drainage Calcs-P4 (Surcharged)Drainage20 Apr 2026View
Units 9-11 - Surface Water Drainage Calcs-P4Drainage20 Apr 2026View
Potsford Dam Link General Arrangement Sheet 1 of 3 - 23/04/26Highway plans/information29 Apr 2026View
Potsford Dam Link General Arrangement Sheet 2 of 3 - 23/04/26Highway plans/information29 Apr 2026View
Potsford Dam Link General Arrangement Sheet 3 of 3 - 23/04/26Highway plans/information29 Apr 2026View
Potsford Dam Link Roundabout Geometry - 23/04/26Highway plans/information29 Apr 2026View
Potsford Dam Link Roundabout Visabilities - 23/04/26Highway plans/information29 Apr 2026View
Potsford Dam Link Contours and Longitudinal Sections Sheet 1 of 4 - 23/04/26Highway plans/information29 Apr 2026View
Potsford Dam Link Contours and Longitudinal Sections Sheet 2 of 4 - 23/04/26Highway plans/information29 Apr 2026View
Potsford Dam Link Contours and Longitudinal Sections Sheet 3 of 4 - 23/04/26Highway plans/information29 Apr 2026View
Potsford Dam Link Contours and Longitudinal Sections Sheet 4 of 4 - 23/04/26Highway plans/information29 Apr 2026View
Potsford Dam Link Vehicle Swept Paths Sheet 1 of 2 - 23/04/26Highway plans/information29 Apr 2026View
Landscaping response - 11/06/26Landscaping12 Jun 2026View
2608-TCG-XX-C-5511_Unit_08_-Proposed_Drainage_Layout-Sheet_01_P06_17-06-26.pdfDrainage17 Jun 2026View
2608-TCG-XX-C-5512_Unit_08_-Proposed_Drainage_Layout-Sheet_02_P06_17-06-26.pdfDrainage17 Jun 2026View
2608-TCG-XX-C-5513_Units_09_to_11_-Proposed_Drainage_Layout-Sheet_03_P06_17-06-26.pdfDrainage17 Jun 2026View
2608-TCG-XX-C-5514_Units_09_to_11_-Proposed_Drainage_Layout-Sheet_04_P06_17-06-26.pdfDrainage17 Jun 2026View
2608-TCG-XX-C-5515_Units_09_to_11_-Proposed_Drainage_Layout-Sheet_05_P06_17-06-26.pdfDrainage17 Jun 2026View
2608-TCG-XX-C-5516_Units_09_to_11_-Proposed_Drainage_Layout-Sheet_06_P06_17-06-26.pdfDrainage17 Jun 2026View
2608-TCG-XX-C-5526_-_Impermeable_Areas_Plan-P4_17-06-26.pdfDrainage17 Jun 2026View
2608-TCG-XX-C-5527_-_Outfall_Catchment_Plan-P2_17-06-26.pdfDrainage17 Jun 2026View
T2608_Planning_Response_LLFA_Symmetry_Park_Rugby_17-06-26.pdfDrainage17 Jun 2026View
Unit_9-11_Surface_Water_Drainage_Calcs-P6_(Surcharged)_17-06-26.pdfDrainage17 Jun 2026View
Unit_9-11_Surface_Water_Drainage_Calcs-P6_17-06-26.pdfDrainage17 Jun 2026View
Updated lighting report - 08/07/26Supporting Information8 Jul 2026View
Updated lighting report, covering letter - 08/07/26Supporting Information8 Jul 2026View
RSA SE roundabout - 17/07/26Highway plans/information17 Jul 2026View
RSA response report - 17/07/26Highway plans/information17 Jul 2026View
RSA unit 8 access - 17/07/26Highway plans/information17 Jul 2026View
Symmetry Park Phase 2 Archaeological EvaluationArchaeology Report23 Jul 2026View
Cawston Landscape Park Archaeological EvaluationArchaeology Report23 Jul 2026View
BundingPlans29 Jul 2026View
SectionsPlans29 Jul 2026View
SectionsPlans29 Jul 2026View
Ecological Technical Note – Lighting ReviewEcology Report16 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Site notice date

    Published milestoneCouncil source
  6. Valid date

    Published milestoneCouncil source
  7. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Extension date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Consultation Carried Out
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.