CONDITION 5: The access to the site for vehicles shall not be used unless a public highway footway crossing has been laid out and constructed in accordance with the standard specification of the Highway Authority. REASON: In the interests of Highway Safety
CONDITION:3 The dropped kerb as approved shall not be brought into use until the boundary treatment as shown on approved drawing SC336_P6 has been erected. REASON: In the interests of highway safety.
CONDITION: 4 Visibility splays with an ‘x’ distance of 2.4 metres and ‘y’ distances of 43 metres to the near edge of the public highway carriageway are required at the access, passing through the limits of the site fronting the public highway. No structure, tree or shrub shall be erected, planted or retained within the splays exceeding, or likely to exceed at maturity, a height of 0.6 metres above the level of the public highway carriageway. REASON: In the interests of highway safety
CONDITION 2: The development shall not be carried out other than in accordance with the following plans: Proposed Site Plan, Drg no SC336-P2 Existing and Proposed Boundary Wall Elevation Drg no SC336-P6 received by the Council on 17th December 2025 REASON: For the avoidance of doubt.
CONDITION 1: The development to which this permission relates must not be begun later than the expiration of three years from the date of this permission. REASON: To comply with Section 91 of the Town & Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act, 2004.
INFORMATIVE 1: Conditions require works to be carried out within the limits of the public highway. Before commencing such works the applicant / developer must serve at least 28 days notice under the provisions of Section 184 of the Highways Act 1980 on the Highway Authority‘s Area Team. This process will inform the applicant of the procedures and requirements necessary to carry out works within the Highway and, when agreed, give consent for such works to be carried out under the provisions of S184. In addition, it should be noted that the costs incurred by the County Council in the undertaking of its duties in relation to the construction of the works will be recoverable from the applicant/developer. The Area Team may be contacted by telephone: (01926) 412515 to request the necessary application form (Form A – VAC). In accordance with Traffic Management Act 2004 it is necessary for all works in the Highway to be noticed and carried out in accordance with the requirements of the New Roads and Streetworks Act 1991 and all relevant Codes of Practice. Before commencing any Highway works the applicant / developer must familiarise themselves with the notice requirements, failure to do so could lead to prosecution. Application should be made to the Street Works Manager, Budbrooke Depot, Old Budbrooke Road, Warwick, CV35 7DP. For works lasting ten days or less, ten days notice will be required. For works lasting longer than 10 days, three months notice will be required.
INFORMATIVE 2: In accordance with Traffic Management Act 2004 it is necessary for all works in the Highway to be noticed and carried out in accordance with the requirements of the New Roads and Streetworks Act 1991 and all relevant Codes of Practice. Before commencing any Highway works the [applicant{s}/ developer{s}] must familiarise themselves with the notice requirements, failure to do so could lead to prosecution. Application should be made to the Street Works Manager, Budbrooke Depot, Old Budbrooke Road, Warwick, CV35 7DP. For works lasting ten days or less, ten days notice will be required. For works lasting longer than 10 days, three months notice will be required.
INFORMATIVE 3: It is observed that cable duct covers are located on the footway in front of the proposed new access. Given their location vehicular movements in and out of the access are expected to cross over these utilities, therefore is recommended that the service provider should be contacted to see if any alterations are required as a result of the new access, any associated costs will be the responsibility of the applicant.
INFORMATIVE 4: The access to the site shall not be constructed in such a manner as to reduce the effective capacity of any drain or ditch within the limits of the public highway.
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.