DETAILS OF AMENDMENT Revise condition 1 of R24/0311 to make amendments to design of proposed road: - Road widened slightly; - White lining and layout of central turning lane changed; - Public Right of Way moved to the eastern side and a dropped kerb added where the path crosses the Spur Rd. CONDITION: 1 The development shall be carried out in accordance with the plans and documents detailed below: Context Plan – Spur Road Link + Watercourse Diversion 13-216-SGP-STE-ZZ-DR-A-131036-H Spur Road Link + Watercourse Diversion 13-216-SGP-STE-ZZ-DR-A-131039-G Site Plan – Spur Road Link + Watercourse 13-216-SGP-STE-ZZ-DR-A-131042-E Site Plan (Spur Road Link and Public Right of Way) 13-216-SGP-STE-22-DR-A-131043-F Spur Road Link + Right of Way 13-216-SGP-STE-ZZ-DR-A-131043-F Extent of Works – Spur Road Link 13-216-SGP-STE-ZZ-DR-A-131044-E Received 29/10/2025 Location Plan 13-216-SGP-STE-ZZ-DR-A-131035-F Proposed Highway Tie-in Longsection T_22_2608_65-11 C4 Spur Road and Watercourse Levels T_22_2808_1608_60-60.1 C6 Spur Road and Watercourse Levels T_22_2808_1608_60-60.2 C5 Section 38 General Arrangement T_22_2608_65-02-C4 Section 38 Site Clearance T_22_2608_65-03-C3 Section 38 Carriageway Pavements T_22_2608_65-05.2 C3 Section 38 Kerbs and Footways Pavements T_22_2608_65-05.1-C3 Section 38 Drainage and Services T_22_2608_65-06-C9 Section 38 Signs and Markings T_22_2608_65-07-C3 Section 38 Risk Management T_22_2608_65-09-C4 Spur Road and Watercourse Earthworks T_22_2608_65-61 C4 Contract Works Sections - T/22/2608 65-06.1 C5 Received 24/09/2025 Section 38 Spur Road Watercourse Sections T_22_2608_65-30 T4 Proposed Public Right of Way Longsection T/22/2608 60-10 T4 Extent of works to finish Phase 1B T_22_2608_SK18 P1 Received 08/10/2024 Existing Site Plan 13-216-SGP-STE-22-DR-71-131046-A Spur Road Link Landscape Proposals edp7992_d011-D Levels Plan Option – No Footway – Lane Blocked off P23001-TCG-EC-00-DR-C-SK13 Rev P4 Proposed Riparian Maintenance Access Strip T_22_2608_65-33 T4 Highways Works Proposed ground Retaining Wall Sections T_22_2608_65-09 T4 Received 18/09/2024 BNG Metric edp7992_r018 Received 10/08/2024 Storm Water / SUDs Maintenance Plan Spur Road, Symmetry Park, Rugby Received 01/07/2024 Ecology Technical Note edp7992_r012-B Received 14/06/82024 Impermeable Area Plan - T/22/2608 65-32 P1 Management and Maintenance Plan for diverted watercourse V.01 Flood Exceedance Routes T_22_2608_65-31 P1 1-100 year + 40% APT Surcharged outfall T_22_2608_65-31 P1 1-100 year +40% APR Surcharged Outfall T_22_2608_65-31 P1 Received 02/06/2024 Archaeology Technical Note EIA Compliance Statement Sustainability Checklist Channel Diversion Modelling Technical Note Transport Technical Note 332610817-703 Landscape Technical Note edp7992_r014-B LEMP edp7992_r013-B Received 28/03/2024
INFORMATIVE: It is observed that the submitted drawings do not include a pedestrian and cycle refuge facility at the location where the Public Right of Way (PROW) will cross the Spur Road. This will not a safety concern during the period prior to the construction of the extension of the Spur Road to the north, where it will join the A4071/Coventry Road and provide a link between that point and the A45 (forming the Potsford Dam Link Road). However, it should be noted that the Highway Authority will require that a refuge for pedestrian and cyclists is provided as part of the works undertaken to extend the road to the north.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.