Provision of eight electric vehicle charging parking spaces and associated infrastructure comprising of four charger pillars, one feeder pillar, one power bank, one substation and bollards, together with the relocation of existing lamp posts, trees and bicycle parking shelter.
Elliots Field Shopping Park, LEICESTER ROAD, RUGBY
Decision MadeReference: R25/0835Rugby Borough Council
Last published check: 3 Oct 2026, 07:36. Check the council record for more recent changes.
Application location
Elliots Field Shopping Park, LEICESTER ROAD, RUGBY
This record has no verified map location.
Application summary
Status
Decision Made
Application type
8 Weeks PA
Received
19 Sept 2025
Validated
1 Oct 2025
Determination deadline
14 Nov 2025
Local authority
Rugby Borough Council
Application overview
Provision of eight electric vehicle charging parking spaces and associated infrastructure comprising of four charger pillars, one feeder pillar, one power bank, one substation and bollards, together with the relocation of existing lamp posts, trees and bicycle parking shelter.
Proposal details
Reference
R25/0835
Alternative references
PP-14338702
Ward
Newbold & Brownsover
Parish
Unparished
Agent
Hayley Knight
UPRN
100071578108
Sign in to view all collected council fields and recorded changes.
CONDITION: 1 The development to which this permission relates must not be begun later than the expiration of three years from the date of this permission. REASON: 1 To comply with Section 91 of the Town & Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act, 2004.
CONDITION: 2 The development shall be carried out in accordance with the plans and documents detailed below: Application form Site location plan, reference 693-3-0-000 rev P3 Site location plan, reference 693-3-0-001 rev P3 Existing Site Plan, reference 693-3-0-002 rev P3 Existing Elevation A Plan, reference 693-3-0-003 rev P3 Existing Elevation B Plan, reference 693-3-0-004 rev P3 Proposed Site Plan, reference 693-3-1-001 revision P3 Proposed Elevation A Plan, reference 693-3-2-001 rev P3 Proposed Elevation B Plan, reference 693-3-2-002 rev P3 Proposed Charger Details Plan, reference 693-3-5-001 Proposed Power Bank Details Plan, reference 693-3-5-002 Proposed Feeder Pillar Details Plan, reference 693-3-5-003 Proposed Substation Details Plan, reference 693-3-5-004 Proposed Bollard, Signage, and Lighting Details Plan, reference 693-3-5-005 Proposed Fence Details Plan, reference 693-3-5-006 Existing and Proposed Timber Bike Storage Plan, reference 693-3-5-007 rev P1 All plans received by Council, 22/09/2025 REASON: 2 For the avoidance of doubt and to ensure that the details of the development are acceptable to the Local Planning Authority.
CONDITION: 3 The facing materials to be used as part of the development shall be as specified on the proposed site plan, reference 693-3-1-001 rev P3 received by the Council on 22/09/2025. REASON: 3 To ensure a satisfactory external appearance and for the avoidance of doubt.
CONDITION: 4 A Habitat Management and Monitoring Plan (HMMP) for a minimum 30-year timeframe shall be submitted to, and be approved in writing by, the local planning authority prior to the commencement of the development. The content of the HMMP shall include the following: a) Description and evaluation of features to be managed. b) Ecological trends and constraints on site that might influence management. c) Aims and objectives of management. d) Appropriate management options for achieving aims and objectives. e) Prescriptions for management actions. f) Preparation of a work schedule (including annual work plan capable of rolling forward over a five-year period). g) Details of the body or organisation responsible for implantation of the plan. h) Ongoing monitoring and remedial measures. i) The completed statutory metric applied to the application site to demonstrate that a biodiversity net gain will be achieved. j) Locations and numbers of bat and bird boxes, reptile, and amphibian refugia, invertebrate boxes k) Details of the legal and funding mechanism(s) by which long-term implementation of the plan will be secured by the developer with the management body(ies) responsible for its delivery. The plan shall also set out (where results from monitoring show that conservation aims and objectives of the HMMP are not being met) how contingencies and/or remedial action will be identified, agreed, and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme. The approved plan will be implemented in accordance with the approved details. REASON: 4 To ensure a mandatory Biodiversity Net Gain in accordance with the Environment Act, the NPPF and to safeguard biodiversity in accordance with the Local Plan Policy NE1.
DEEMED CONDITION: In accordance with the Environmental Act 2021, Schedule 14, paragraph 13 and the Town and Country Planning Act 1990 Schedule 7A, paragraph 13: the development may not be begun unless— (a) a biodiversity gain plan has been submitted to the planning authority, and (b) the planning authority has approved the plan. The planning authority, for the purposes of determining whether to approve a Biodiversity Gain Plan in respect of this permission would be Rugby Borough Council.
INFORMATIVE: 1 Where possible enhancements should be incorporated into the development to improve the habitats and opportunities for the local wildlife and increase biodiversity. Enhancements could include bat and bird boxes which may be used by a variety of species, native species planting and enhancement of existing of hedges and wild flower planting, habitat piles of rubble, logs and earth which can be used by reptiles, amphibians and invertebrates are also welcomed. The WCC Ecological Services (tel: 01926 418060) would be pleased to advise further if required.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.