Council planning record

Conversion of commercial unit into a flat.

103, Bridget Street, Rugby, Warwickshire, CV21 2BU

Decision MadeReference: R25/0830Rugby Borough Council

Last published check: 3 Oct 2026, 00:07. Check the council record for more recent changes.

Application location

103, Bridget Street, Rugby, Warwickshire, CV21 2BU

This record has no verified map location.

Application summary

Status
Decision Made
Application type
8 Weeks PA
Received
19 Sept 2025
Validated
29 Oct 2025
Determination deadline
18 Dec 2025
Local authority
Rugby Borough Council

Application overview

Conversion of commercial unit into a flat.

Proposal details

Reference
R25/0830
Alternative references
PP-14336961
Ward
New Bilton
Parish
Unparished
Agent
Pratheepa Kartheepan
UPRN
100070179112

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
Sustainability appraisal R'cd 22.09.2025Sustainability ChecklistNot publishedView
Design and access statement R'cd 22.09.2025Design and Access StatementNot publishedView
Community Infrastructure Levy - Completed form R'cd 22.09.2025CIL formNot publishedView
The location plan R'cd 22.09.2025Site Location PlanNot publishedView
Redacted Application Form R'cd 14.10.2025Application Form15 Oct 2025View
Composite Plans R'cd 23.10.2025Composite Plans23 Oct 2025View
Block Plan R'cd 23.10.2025Block Plan23 Oct 2025View
Decision NoticeDecision Notice17 Dec 2025View
Officer ReportOfficer Report17 Dec 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  14. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approval
Decision Notice
Planning conditions
  1. CONDITION 1: The development to which this permission relates must not be begun later than the expiration of three years from the date of this permission. REASON 1: To comply with Section 91 of the Town & Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act, 2004.
  2. CONDITION 2: The development shall be carried out in accordance with the plans and documents detailed below: Application form received by the Council on 14th October 2025. Sustainability Checklist received by the Council on 22nd September 2025. Location Plan received by the Council on 22nd September 2025. Block Plan (Drawing No. TQRQM25296155207032) received by the Council on 23rd October 2025. Plans (Drawing No. DRW-01R Rev A) received by the Council on 23rd October 2025. REASON 2: For the avoidance of doubt and to ensure that the details of the development are acceptable to the Local Planning Authority.
  3. CONDITION 3: The facing materials to be used on the external walls and roof shall be of the same type, colour and texture as those used on the existing building. REASON 3: To ensure a satisfactory external appearance.
  4. CONDITION 4: Prior to the first occupation of the approved dwelling, an acoustic report shall be submitted to and approved in writing by the Local Planning Authority. The report shall be prepared by a suitably qualified acoustic consultant and shall demonstrate, through post-completion testing, that the following internal noise criteria are achieved: i. All bedrooms: 8-hour LAeq (23:00–07:00) $5 30 dB(A) ii. All living rooms and bedrooms: 16-hour LAeq (07:00–23:00) $5 35 dB(A) iii. LAFmax noise levels shall not exceed 45 dB(A) more than 10 times between 23:00–07:00 inside bedrooms Validation testing shall be conducted with windows open for ventilation unless mechanical ventilation has been provided, in which case tests shall be performed with such ventilation operating. Where compliance cannot be achieved through design alone, approved mitigation measures shall be implemented prior to occupation. Such noise protection measures shall thereafter be maintained and operated in accordance with the approved scheme. REASON 4: In the interest of residential amenity.
  5. CONDITION 5: The dwellings hereby approved shall incorporate measures to limit water use to no more than 110 litres per person per day within the home in accordance with the optional standard 36 (2b) of Approved Document G of the Building Regulations 2010 (as amended). REASON 5: In the interests of sustainability and water efficiency.
  6. CONDITION 6: Prior to the first occupation of each dwelling broadband infrastructure shall be provided to that dwelling to allow broadband services to be provided. REASON 6: To provide broadband connectivity for future occupiers.
  7. INFORMATIVE: The applicant is encouraged to incorporate measures to assist in reducing their impact upon the Air Quality Management Area as part of this development. Initiatives could include the installation of an ultra-low emission boiler (<40mg/kWh), increased tree planting/landscaping, solar thermal panels, and the incorporation of electric vehicle charging points on any car parking. More information on plants that can be incorporated into landscaping for green walls and roofs can be found here: https://www.museumoflondon.org.uk/application/files/4915/2604/2216/2018-05-11-phytosensor-final-web-ok-compressed_1.pdf Such measures contribute towards improving air quality. Further information can be obtained from Environmental Health on 01788 533857 or email ehcs@rugby.gov.uk
  8. INFORMATIVE: Environmental Services advise that in order to reduce the likelihood of local residents being subjected to adverse levels of noise annoyance during construction, work on site should not occur outside the following hours: - Monday - Friday - 7.30 a.m. - 6.00 p.m. Saturday - 8.30 a.m. - 1.00 p.m. No work on Sundays & Bank Holidays.
  9. INFORMATIVE: Prior to any demolition, redevelopment or refurbishment works taking place an appropriate Asbestos Survey should be undertaken by an asbestos licensed/authorised company/person and any recommendations implemented. For pre-demolition assessment the asbestos survey is fully intrusive and will involve a destructive inspection, as necessary, to gain access to all areas. Where presence of asbestos is suspected the Health and Safety Executive (HSE) and Environment Agency must be notified and special waste regulations complied with; asbestos removal activities fall under the remit of the HSE.
  10. INFORMATIVE: The applicant is advised that the property is in a smoke control area and should provide suitable heating appliances to conform to the requirements of such an area.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.