Rugby Borough Council hereby certify that on the application date above the operations described in the First Schedule hereto in respect of the land specified in the Second Schedule hereto and edged red on the plan attached to this certificate would be lawful within the meaning of section 192 of the Town and County Planning Act 1990 (as amended) for the following reasons: The application complies with the requirements of the Town and Country Planning (General Permitted Development) (England) Order 2015 Schedule 2, Part 15, Class A and Schedule 2 Part 2 Class B: The proposed new gas connection facility and access road to be permitted development. FIRST SCHEDULE: Proposed gas connection facility as detailed in the follwoing documents: Application Form Drawing number 042-01-CNG-124 Rev A Gas Connection Facility Site Layout Plan Bespoke reinforced concrete pit dimension details Drawing number 042-01-CNG-121 Rev A Gas Connection Facility Site Location Plan Drawing number 042-01-CNG-123 Rev A Gas Connection Facility Site Block Plan All received by the Council on 19/09/2025 SECOND SCHEDULE: Land South of A5 Watling Street, Hinckley LE10 3ED. Easting (x) 440665, Northing (y) 292418
NOTES: 1. This certificate is issued solely for the purpose of sections 192 of the Town and Country Planning Act 1990 (as amended). 2. It certifies that the operations specified in the First Schedule taking place on the land described in the Second Schedule would be lawful, on the specified date and, thus, were not liable to enforcement action under Part 7 of the 1990 Act on that date. 3. This certificate applies only to the extent of the operations described in the First Schedule and to the land specified in the Second Schedule and identified on the attached plan. Any operations which are materially different from those described or which relate to other land may render the owner or occupier liable to enforcement action. 4. The effect of the certificate is also qualified by the proviso in section 192(4) of the 1990 Act, as amended, which states that the lawfulness of a described use or operation is only conclusively presumed where there has been no material change, before the use is instituted or the operations begun, in any of the matters relevant to determining such lawfulness.
CONDITION 1: On completion of the laying or construction of the main or pipe, or at the expiry of a period of 9 months from the beginning of the development, whichever is the sooner, any pipes or other apparatus still stored on the land are removed and the land restored as soon as reasonably practicable to its condition before the development took place REASON: To ensure that the application accords with The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 15, Class A
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.