Council planning record

Approval of conditions 3 (Landscaping & Ecology), 5 (Highway Drainage), 6 (Air Quality) and 7 (Contaminated Land) of R22/0534.

The United Pentecostal Church, Windsor Street, Rugby, CV21 3NZ

Decision MadeReference: R25/0817Rugby Borough Council

Last published check: 3 Oct 2026, 13:57. Check the council record for more recent changes.

Application location

The United Pentecostal Church, Windsor Street, Rugby, CV21 3NZ

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Conditions
Received
15 Sept 2025
Validated
17 Sept 2025
Determination deadline
10 Nov 2025
Local authority
Rugby Borough Council

Application overview

Approval of conditions 3 (Landscaping & Ecology), 5 (Highway Drainage), 6 (Air Quality) and 7 (Contaminated Land) of R22/0534.

Proposal details

Reference
R25/0817
Alternative references
PP-14330098
Agent
REBECCA WALKER
UPRN
10010512702

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 8 of 8

DocumentPublishedAction
Condition 7: quote for Report rec'd 15/09/2025Condition Info / PlanNot publishedView
Condition 3: Ecology and Landscaping rec'd 15/09/2025Condition Info / PlanNot publishedView
Condition 5: Highway Drainage Information rec'd 15/09/2025SupersededNot publishedView
Condition 6 Air Quality Mitigation rec'd 15/09/2025Condition Info / PlanNot publishedView
Application Form - Without Personal Data rec'd 15/09/2025Application FormNot publishedView
Condition 7: Phase I Land Contamination Assessment by Brown Fisher Environmental Planning rec'd 22/09/25Condition Info / Plan22 Sept 2025View
Condition 5: Highway Drainage Information rec'd 03/11/2025Condition Info / Plan3 Nov 2025View
R25_0817_DN.pdfDecision Notice13 Nov 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Valid date

    Published milestoneCouncil source
  6. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source
  11. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approval
R25_0817_DN.pdf
Planning conditions
  1. CONDITION 6: No above ground development shall begin until a scheme detailing the on-site measures to be incorporated within the development in order to meet air quality neutral standards or to provide suitable mitigation, has been submitted to and approved in writing by the Local Planning Authority. Prior to occupation of the development, the approved scheme shall be implemented and maintained in perpetuity. REASON: In the interests of air quality.
  2. CONDITION 7: No development other than that required to be carried out as part of an approved scheme of remediation shall commence [in any phase of the development] until condition (a) to (d) below have been complied with [for that phase]. If unexpected contamination is found after development has begun, development shall be halted on that part of the site affected by the unexpected contamination to the extent specified in writing by the local planning authority until condition (d) below has been complied with in relation to that contamination. (a) An investigation and risk assessment shall be completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme shall be subject to approval in writing by the local planning authority. The investigation and risk assessment shall be undertaken by competent persons and a written report of the findings shall be produced. The written report shall be subject to approval in writing by the local planning authority. The report of the findings shall include: (i) a survey of the extent, scale and nature of contamination; (ii) an assessment of the potential risks to human health, existing or proposed property and buildings, crops, livestock, pets, woodland and service lines and pipes, adjoining land, groundwaters and surface waters, ecological systems, archaeological sites and ancient monuments; and (iii) an appraisal of remedial options, and proposal of the preferred option(s) to be conducted in accordance with UK Government and the Environment Agency’s Land Contamination Risk Management (LCRM) 8th October 2020. (b) A detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment shall be prepared and subject to approval in writing by the local planning authority. The scheme shall include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme shall ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. (c) The approved remediation scheme shall be carried out in accordance with its terms prior to the commencement of development other than that required to carry out remediation. The local planning authority shall be given two weeks written notification of commencement of the remediation scheme works. Following completion of measures identified in the approved remediation scheme, a verification report that demonstrates the effectiveness of the remediation carried out shall be prepared and subject to approval in writing by the local planning authority. (d) In the event that contamination is found at any time when carrying out the development hereby permitted that was not previously identified it shall be reported in writing immediately to the local planning authority. An investigation and risk assessment shall be undertaken in accordance with the requirements of condition (a) and where remediation is necessary a remediation scheme shall be prepared in accordance with the requirements of condition (b) which shall be subject to approval in writing by the local planning authority. Following completion of measures identified in the approved remediation scheme a verification report shall be prepared, which shall be subject to approval in writing by the local planning authority in accordance with condition (c). REASON: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, ecological systems, property and residential amenity and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
  3. CONDITION 5: No development shall commence until full details of the surfacing, drainage and levels of the access, car parking and manoeuvring areas as shown on the approved plan have been submitted to and approved in writing by the Council. The unit shall not be occupied until the areas have been laid out in accordance with the approved details and such areas shall be permanently retained for the parking and manoeuvring of vehicles. REASON: In the interest of highway safety.
  4. CONDITION 3: No works to commence on site, including site clearance, until a combined ecological and landscaping scheme has been submitted and agreed between the applicant and the County planning authority (with advice from WCC Ecological Services). The scheme must include hedgerow creation and tree planting. The development shall be carried out and subsequently managed in accordance with the scheme (or any variation) so approved. REASON: In accordance with NPPF, ODPM Circular 2005/06
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.