Council planning record

Prior Approval for Installation of a 299 kWp Solar PV System on a Non-Domestic Rooftop

SAINSBURYS, UNITS 1 & 2 ANSTY PARK, DRAKEN DRIVE, COVENTRY, CV7 9RD

Decision MadeReference: R25/0744Rugby Borough Council

Last published check: 3 Oct 2026, 23:50. Check the council record for more recent changes.

Application location

SAINSBURYS, UNITS 1 & 2 ANSTY PARK, DRAKEN DRIVE, COVENTRY, CV7 9RD

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Non-domestic solar prior approval
Received
22 Aug 2025
Validated
27 Aug 2025
Determination deadline
17 Oct 2025
Local authority
Rugby Borough Council

Application overview

Prior Approval for Installation of a 299 kWp Solar PV System on a Non-Domestic Rooftop

Proposal details

Reference
R25/0744
Alternative references
PP-14276063
Ward
Revel & Binley Woods
Parish
Coombe Fields
Agent
Daniel George John
UPRN
10010513582

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
Application Form Redacted Rec'd 22/08/2025Application Form27 Aug 2025View
Site Location Plan Rec'd 22/08/2025Site Location Plan27 Aug 2025View
Existing Roof Plan Rec'd 22/08/2025Existing Plans27 Aug 2025View
Proposed Layout Plan Rec'd 22/08/2025Proposed Plans27 Aug 2025View
Superimposed Module Layout Rec'd 22/08/2025Proposed Plans27 Aug 2025View
Planning Statement Layout Rec'd 22/08/2025Planning Statement27 Aug 2025View
Glint and Glare Statement Rec'd 22/08/2025Supporting Information27 Aug 2025View
Solar Panel Technical Information Rec'd 22/08/2025Supporting Information27 Aug 2025View
681218Decision_NDS_not_required_22.pdfDecision Notice15 Oct 2025View
ApasTemplate_80761.pdfOfficer Report15 Oct 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Registration date

    Published milestoneCouncil source
  3. Press notice start date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Dispatch date

    Published milestoneCouncil source
  9. Decision date

    Published milestoneCouncil source
  10. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Not Required
681218Decision_NDS_not_required_22.pdf
Planning conditions
  1. CONDITION 1: a) The solar PV equipment or solar thermal equipment must, so far as practicable, be sited so as to minimise its effect on the external appearance of the building and the amenity of the area: and b) The solar PV equipment or solar thermal equipment is removed as soon as reasonably practicable when no longer needed. REASON: To comply with the conditions, limitations or restrictions specified under Schedule 2, Part 14, Class J of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.