Council planning record

Partial demolition of existing dwelling, erection of first-floor storey, other alterations and access.

The Ridges, Main Street, Frankton, Rugby, Warwickshire, CV23 9NY

Decision MadeReference: R25/0713Rugby Borough Council

Last published check: 3 Oct 2026, 22:33. Check the council record for more recent changes.

Application location

The Ridges, Main Street, Frankton, Rugby, Warwickshire, CV23 9NY

This record has no verified map location.

Application summary

Status
Decision Made
Application type
8 Weeks PA
Received
14 Aug 2025
Validated
1 Sept 2025
Determination deadline
17 Oct 2025
Local authority
Rugby Borough Council

Application overview

Partial demolition of existing dwelling, erection of first-floor storey, other alterations and access.

Proposal details

Reference
R25/0713
Alternative references
PP-14234853
Ward
Dunsmore
Parish
Frankton
Agent
Michael Smiton
UPRN
100071239257

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
Community Infrastructure Levy - Completed form R'cd 15.08.2025CIL formNot publishedView
Sustainability appraisal R'cd 15.08.2025Sustainability ChecklistNot publishedView
Bat Survey R'cd 15.08.2025Supporting InformationNot publishedView
The location plan R'cd 15.08.2025Site Location PlanNot publishedView
Existing Plans and Elevations R'cd 22.08.3025Existing Plans27 Aug 2025View
Proposed Plans and Elevations R'cd 22.08.2025Proposed Plans27 Aug 2025View
Revised application form r'cd 22.08.2025Application Form29 Aug 2025View
Site sectionsPlans24 Oct 2025View
Decision NoticeDecision Notice7 Nov 2025View
Officer reportOfficer Report7 Nov 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Valid date

    Published milestoneCouncil source
  6. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Dispatch date

    Published milestoneCouncil source
  11. Decision date

    Published milestoneCouncil source
  12. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  13. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approval
Decision Notice
Planning conditions
  1. CONDITION 1: The development to which this permission relates must not be begun later than the expiration of three years from the date of this permission. REASON: To comply with Section 91 of the Town & Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act, 2004.
  2. CONDITION 2: The development shall be carried out in accordance with the plans and documents detailed below: The Site Location Plan - Scale 1:1250 Received by the Local Planning Authority on the 15th August 2025 The Application Form Proposed Plans & Elevations - 25.0633.GA.101 Received by the Local Planning Authority on the 22nd August 2025 Indicative Site Sections - 25.0633.GA.110 Received by the Local Planning Authority on the 24th October 2025 REASON: For the avoidance of doubt and to ensure that the details of the development are acceptable to the Local Planning Authority.
  3. CONDITION 4: The access to the site for cars shall not be used in connection with the development until it has been surfaced with a bound material for its whole length as measured from the near edge of the public highway carriageway. REASON: In the interest of highway safety.
  4. CONDITION 5: The access to the site for cars shall not be used unless a public highway footway crossing has been laid out and constructed in accordance with the standard specification of the Highway Authority. REASON: In the interest of highway safety.
  5. CONDITION 6: The access to the site shall not be constructed in such a manner as to reduce the effective capacity of any drain or ditch within the limits of the public highway. REASON: In the interest of highway safety.
  6. INFORMATIVE 1: Notes: A. Condition numbers 4 and 5 require works to be carried out within the limits of the public highway. Before commencing such works the applicant / developer must serve at least 28 days notice under the provisions of Section 184 of the Highways Act 1980 on the Highway Authority's Area Team. This process will inform the applicant of the procedures and requirements necessary to carry out works within the Highway and, when agreed, give consent for such works to be carried out under the provisions of S184. In addition, it should be noted that the costs incurred by the County Council in the undertaking of its duties in relation to the construction of the works will be recoverable from the applicant/developer. The Area Team may be contacted by telephone: (01926) 412515 to request the necessary application form (Form A - VAC). In accordance with Traffic Management Act 2004 it is necessary for all works in the Highway to be noticed and carried out in accordance with the requirements of the New Roads and Streetworks Act 1991 and all relevant Codes of Practice. Before commencing any Highway works the applicant / developer must familiarise themselves with the notice requirements, failure to do so could lead to prosecution. Application should be made to the Street Works Manager, Budbrooke Depot, Old Budbrooke Road, Warwick, CV35 7DP. For works lasting ten days or less, ten days notice will be required. For works lasting longer than 10 days, three months notice will be required. B. Pursuant to Section 149 and 151 of the Highways Act 1980, the applicant/developer must take all necessary action to ensure that mud or other extraneous material is not carried out of the site and deposited on the public highway. Should such deposits occur, it is the applicant's/developer's responsibility to ensure that all reasonable steps (e.g. street sweeping) are taken to maintain the roads in the vicinity of the site to a satisfactory level of cleanliness.
  7. INFORMATIVE 2: Bats can be found in many buildings, even those that initially appear to be unsuitable or have been subject to a bat survey and found no evidence. Therefore, if any evidence of bats is found on site, work should stop while a bat survey is carried out by an experienced bat worker, and any recommendations made following the survey are undertaken. It should also be noted that as bats are a mobile species and can move into a property with potential access at any time. A further survey may be required if the works are not undertaken within two years. Bats and roosts are protected under the 1981 Wildlife and Countryside Act, the Countryside and Rights of Way Act 2000, and The Conservation of Habitat and Species Regulations 2017 (as amended).
  8. INFORMATIVE 3: Work should avoid disturbance to nesting birds. Birds can nest in many places including buildings, trees, shrubs, dense ivy, and bramble/rose scrub. Nesting birds are protected under the Wildlife and Countryside Act 1981 (as amended). The main nesting season lasts approximately from March to September inclusive, so work should ideally take place outside these dates if at all possible. N.B birds can nest at any time, and the site should ideally be checked by a suitably qualified ecologist for their presence immediately before work starts, especially if during the breeding season.
  9. INFORMATIVE 4: Consideration should be given to the provision of suitable bat and bird boxes within the new build or adjacent trees in order to increase opportunities for wildlife. Many bat and bird populations have declined dramatically in recent years due to loss of roost, nest and foraging sites as a result of development. However, a variety of bat and bird species use boxes and they can be particularly useful in the urban environment, where natural nesting places can be scarce. Further advice and information can be obtained from the Bat Conservation Trust (BCT), and the Royal Society for the Preservation of Birds (RSPB). WCC Ecological Services.
  10. CONDITION 7: The development shall not be occupied until the parking provision within the site has been provided in general accordance with the plans - Indicative Site Sections - 25.0633.GA.110 REASON: In the interest of highway safety
  11. CONDITION 8: The window to be formed in the first floor of the south-west elevation shall be glazed in obscure glass. The window shall remain obscure glazed whilst the development remains in existence. REASON: To protect the residential amenity of neighbouring properties.
  12. CONDITION 3: No above ground development shall commence unless and until full details of the colour, finish and texture of all new materials to be used on all external surfaces, together with samples of the facing render and roof material have been submitted to and approved in writing by the Local Planning Authority. The development shall not be carried out other than in accordance with the approved details. REASON: To ensure a satisfactory external appearance and in the interests of the visual amenities of the locality.
Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.